OPINION KAPLAN, District Judge. Facts. .347 Parties .347 The La Isabela Project. Structure. Mooring Design. The Insurance and Initial LSA Review.". The Purchase Agreement and Coastal’s Due Diligence. The LSA Problem Grows. LSA Refuses to Approve the Mooring. Coastal’s Knowledge of the Issue. The Closing. Post-Closing Developments. Prior Proceedings . Discussion c cc The Warranty Claims.360 The Alleged Breaches.360 The Effect of Coastal’s Decision to Close Given its Knowledge of the LSA Problem. 360 The Contract Claims.•..363 Liability.:.363 Causation and Damages.364 Waiver .369 Mitigation.370 Attorney’s Fees.370 Prejudgment Interest_’.371 Conclusion. 372 A multimillion dollar transaction between huge corporations staffed by able managers and engineers, assisted by experts, and represented by able counsel — though appropriately affected by the tugs of conflicting interests — ought to be a model of competence and fair dealing. Regrettably, the deal that gave rise to this action, the acquisition by the plaintiffs for $70 million of a floating power plant in the Dominican Republic, appears to have been a model of neither. The crux of the problem is that the windstorm insurance on the plant — a coverage of no mean significance in view of the facility’s hurricane-prone location — was canceled on the day following the closing. Plaintiffs here claim that they were forced to spend almost $2 million on modifications to the plant’s mooring in order to reinstate the insurance. They contend that the defendants should bear the cost on fraud and contract theories. Defendants deny liability. They contend among other things that plaintiffs were well aware of the insurance issue and the need for modifications prior to closing. They assert, moreover, that the plaintiffs have seized on what at most was a technical breach of warranty to seek to shift to the defendants the cost of modifications far more elaborate and costly than were required. As one might expect, there is a certain amount of truth on each side. Facts Parties Plaintiff Coastal Power International, Ltd. (“Coastal”) is a Cayman Islands corporation and an indirect, wholly-owned subsidiary of The Coastal Corporation, a publicly held Fortune 500 company. Plaintiff Commonwealth Development Corporation (“CDC”) is a statutory corporation organized under the laws of the United Kingdom for the purpose of assisting overseas countries in the development of their economies. Coastal and CDC, as a result of the transaction at issue in this case, own approximately 96 percent of the issued and outstanding capital stock of Compania De Electricidad De Puerto Plata, S.A. (“CEPP”), which in turn owns the power generating facility at issue in this case. The facility now is operated by an affiliate of Coastal. Defendant Wartsila Power Development, Inc., formerly known as Wartsila Diesel Development Corporation (“Wartsila Power”), is a Delaware corporation with its principal place of business in Maryland. It is an affiliate of a large Finnish company, Wartsila Diesel International OY (‘Wartsila OY”). Wartsila OY, through affiliates including Wartsila Power and Wartsila Diesel, Inc. (“Wartsila Diesel”), is in the business, among others, of manufacturing “turnkey” power plants. Wartsila Power’s role frequently is to identify a prospective project and customer and to arrange financing in order to facilitate the sale of a plant. While Wartsila Power sometimes operates power plants on an interim basis, its objective here was to develop the project and then to dispose of its interest. Thus, it served principally a development and financing role. The remaining defendant, Transcontinental Capital Corporation (“TCC”), is a New York corporation with its principal place of business in Greenwich, Connecticut. It owned the equity in CEPP, although its position was very much subordinate to that of Wartsila Power. The La Isabela Project Structure CEPP owns two power generating facilities at Puerto Plata, Dominican Republic, one a 16 megawatt land based generating plant completed prior to 1992 and the other the 50 megawatt barge-based plant, known as La Isabela I, that is the subject of this litigation. The genesis of the La Isabela I project is not entirely clear from the record, but it appears that Wartsila identified CEPP or TCC as a prospective customer for such a facility and, as is typical in such transactions, played an important role in structuring a transaction in which Wartsila would design and build, and CEPP would purchase, the plant. Accordingly, Wartsila contracted with CEPP to design and build the plant and the mooring to which it would be affixed in Puer-to Plata harbor, receiving in exchange a hen and security interest in TCC’s CEPP stock and various other interests in CEPP and its assets. Mooring Design The mooring was designed beginning in or about February 1994 under the supervision of James Gray of Wartsila Diesel, who initially was assisted by the engineering firm of Aker Omega, Inc. (“AOI”). Gray met with Hans Treu of AOI on February 4, 1994 to discuss the project and provided him with, among other things, a report concerning the strength of the soil in the proposed mooring area, important information because the soil strength would have a direct bearing on the loads that the mooring could withstand. On February 18, 1994, AOI rendered a preliminary report in which it assumed that the storm surge and maximum water depth at the location of the barge in a 50-100 year hurricane would be 10 feet and 28 feet, respectively, and based its advice on maximum wind speed of 118 mph. It recommended a mooring consisting of a number of piles to which the port side of the barge would be moored by pile guide frames that would fit over the piles, thus allowing the barge to rise and fall with the water level. The report noted, however, that the soil strength information provided to AOI by Wartsila Diesel was not adequate to complete the mooring design. Gray spoke with Treu a few days later concerning the preliminary report. Baséd on information from another consultant, a Dr. Herbich of Texas A & M, Gray argued that the design should be based on a storm surge of 8 to 9 feet and that the appropriate wind speed assumption was 100 mph. He promised additional soil information. Following the receipt of further soil strength data from another consultant to Wartsila Diesel, AOI rendered a revised report based on the 9 foot storm surge and 100 mph wind speed assumptions urged by Gray. But AOI made clear that the soil data upon which its calculations were based still were inadequate because the piles would be driven to a depth greater than that to which borings had been made. Further, it cautioned that it had not yet received Dr. Her-bich’s report and was uncomfortable with the wind and wave assumptions. It “strongly recommend[ed] that better and deeper soil borings be obtained before the pile design is finalized” and pointedly inquired whether Wartsila Diesel would accept responsibility for the environmental criteria used in the load analyses and for the inadequacy of the soil information. Shortly thereafter, Wartsila sent AOI Dr. Herbich’s report concerning environmental conditions. The report, however, was. not site specific. It gave general information concerning significant wave heights offshore, but it failed to provide information concerning maximum wave height at the proposed location of the barge, which of course was among the important questions driving the design of the mooring. Treu then spoke with Gray in early March 1994, concluding on the basis of that conversation that Wartsila would take responsibility for the environmental loading assumptions used in the design. He did not question them further. By. the end of March, however, AOI’s role in the design of the mooring ended. Wartsila Diesel completed the design, which did not employ all of AOI’s recommendations, and construction began. While this, narrative suggests that Wartsila Diesel wilfully ignored .competent engineering advice in the expectation that it quickly would sell the plant and pass any problem on to the buyer, the reality arguably is more nuanced. As Treu suggested, there is an inverse relationship between storms of a given intensity and their probability — storms of common intensity occur ixequently and intense storms only infrequently at any given location. When designing a facility that will be'-subjected to storm-conditions, -one takes into account both the expected useful life of the facility — the shorter the useful life, the less likely that the facility will be subjected to extreme conditions — and one’s level of aversion to risk. Treu testified, for example, that fixed facilities located in the Gulf of Mexico with useful lives of greater than five years are designed to withstand 50 or 100 year conditions while rigs that are moved frequently often are designed to withstand only 10 year conditions. Implicit, of course, are the propositions that (1) even the most stringent' design criteria cannot guarantee against' all loss, as improbable conditions do occur, and (2) the choice of any particular design criteria involves a cost-benefit analysis in which the owner weighs the added cost of building to more stringent criteria against the possible loss, discounted by its improbability. Thus, Wartsila’s decisions may have been judgments that would have been reasonable for a long-term owner of the facility or they may have been colored by its •short-term self-interest, although nothing ultimately turns on this. As ultimately constructed, the original mooring at Puerto Plata consisted of five 90 foot piles driven approximately 45 to 52 feet into the subsoil beneath the barge. ■ The barge was affixed to the piles by pile frame guides. There were three principal factors determining the security of the mooring system. The first was the height of the pilings above the bottom, which determined the maximum height to which the water could rise without the pile frame guides rising above the piles and thus freeing the barge from the mooring. The second was the inherent strength of the piles themselves, which determined the lateral force that could be placed upon the barge by wind and wave without snapping the piles. The third was .the resistance of the piles to displacement as a result of the application of force by a wind- and wave-driven barge, which in turn depended principally upon the length of the piles, the depth to which they were driven, and the strength of the subsoil. The barge was completed, floated to the Dominican Republic, and installed at the mooring in April 1994. On November 18, 1994, CEPP entered into financing arrangements with an indenture trustee and the Maritime Administrator (“MARAD”) of the Department of Transportation pursuant to which it granted the Secretary of Transportation a security interest in La Isabela I and covenanted that it would keep the vessel insured against certain risks. The Insurance and Initial LSA Review At the time of the installation of La Isabe-la I, Wartsila obtained various insurance coverages for the barge, including a hull and machinery policy underwritten by syndicates at Lloyds of London. The initial term of the policy, which included coverage for windstorm damage, had an expiration date of July 10, 1995. The underwriters, however, conditioned the continuation of the policy upon a survey by the London Salvage Association (“LSA”), a marine warranty surveyor, compliance with any LSA recommendations, and approval by the LSA of the mooring arrangements. Moreover, they retained the right to terminate the windstorm coverage, effective June 1, 1995, absent such LSA approval. A representative of LSA observed the installation of the barge in April 1994 and the driving of the piles. On May 4, 1994, he requested information regarding the design parameters and engineering calculations for the mooring. On September 22, 1994, another LSA surveyor visited the site. In a report dated September 23, 1994, the surveyor advised Wartsila that it wished to review the final “as installed” mooring arrangement design and plans as well as the design calculations and parameters, including information showing allowance for hurricane conditions and surge. The report further cautioned that review of this information might lead to “further recommendations concerning mooring.” Days later, Wartsila’s insurance broker emphasized the importance of complying with LSA’s requests. And this was but the start of a lengthy series of LSA requests which, for the most part, went unanswered by Wartsila: • In a further report dated October 7, 1994, LSA again requested engineering calculations and information regarding design parameters. • On October 20, 1994, LSA’s New York office conveyed to CEPP — which was operated at the time by Wartsila — an extensive request for additional information. It sought, among other things, engineering plans of the piles, design calculations, details of the location and orientation of the moored barge including water depths, calculations of the strength limitations of the barge against wave loads and, most significantly, information regarding the philosophy of the wind and wave design criteria selected for the mooring. It carefully explained that the wave height employed by Wartsila appeared unduly small and indicated that “Meteorological data for wind and waves in the area ... would be useful.” LSA thus made clear that it needed site specific meteorological and oceanographic data. There is no evidence of any meaningful response to these requests during at least the period October 1994 through February 1995. The Purchase Agreement and Coastal’s Due Diligence Although TCC was the record owner of the stock of CEPP, its interest was heavily mortgaged to Wartsila, which therefore had a substantial incentive to bring about a sale of the company. In or about September 1994, Wartsila began discussions with Coastal concerning the sale of CEPP to Coastal, discussions which culminated in an acquisition agreement dated as of December 30, 1994 (the “Purchase Agreement”) pursuant to which Coastal and affiliates and CDC agreed to buy and TCC agreed to sell all of the issued and outstanding capital stock of CEPP for total consideration, payable principally to Wartsila, of approximately $70 million. Although TCC nominally was the seller, both TCC and Wartsila Power made representations and gave warranties to the buyer, the accuracy of which as of the closing date was a condition precedent to Coastal’s obligation to buy. The structure of the representation and warranty provisions of the Purchase Agreement and their relationship to another aspect of the contract are noteworthy. Perhaps reflecting the fact that Coastal is an affiliate of a Fortune 500 company with access to every type of expertise relevant to a transaction such as this, Wartsila and TCC made no representations or warranties concerning the condition or design or engineering characteristics of La Isabela I or the mooring. The Purchase Agreement instead obligated both Wartsila and TCC, “[u]p to and including the Closing Date, to give Coastal and its authorized representatives virtually unlimited acL cess to CEPP, its assets, and books, records and information relating thereto.” The representations and warranties thus were quite limited, the most significant for purposes of this action being representations and warranties: • By TCC that “[s]ince the Review Date [November 30, 1994], except as set forth in the Disclosure Schedule or to the extent otherwise consented to by Coastal in writing, there has not been any ... [o]ther event or condition of any character ... that has or could reasonably be expected to have a Material Adverse Effect on CEPP.” • By TCC and Wartsila Power that “[e]x-cept as disclosed in this Agreement or in the Disclosure Statement there is no fact, circumstance or condition which does or could reasonably be expected to have a Material Adverse Effect on CEPP or any member of the Coastal Group.” • By TCC that “[e]xcept as set forth in the Disclosure Schedule ... no event has occurred which', with the passage of time or the giving of notice, would constitute a default by CEPP ... under any Contract or Permit, or would permit modification, acceleration or termination of any Contract or Permit.” In addition, both TCC and Wartsila Power gave a number of covenants to the buyer. So far as is relevant here, TCC covenanted that, from the date of the Purchase Agreement to and including the closing date, it would: • not agree to or suffer, nor permit CEPP to agree to or suffer, any transaction or condition that could reasonably be expected to have a Material Adverse Effect on CEPP. • use its best efforts to preserve intact the existing business relationships of CEPP with suppliers, customers, distributors and others. • give prompt written notice to Coastal of any notice alleging the occurrence of “any ... event which with the giving of notice, the passage of time or both would reasonably be expected to constitute a breach or default, with respect to any Contracts ... of CEPP” or “which would result in ... any of Seller’s representations or warranties ... being or becoming inaccurate or misleading in any material respect.” Wartsila Power, for its part, covenanted that it would use . its best efforts to cause CEPP to comply with and itself “take such action within its power to perform the covenants set forth in Section 6 [covenants of TCC] hereto.” The Disclosure Schedule furnished in connection with the acquisition agreement contained an insurance summary that indicated that a condition of the hull and machinery insurance for La Isabela I was compliance with all LSA recommendations regarding, and approval by LSA of, the mooring arrangements. Coastal thus was well aware of these requirements prior to closing. Moreover, it knew that provisions such as this could result in the need to make major modifications to the mooring. Nevertheless, while it conducted some due diligence, it sought no information regarding the mooring or its design. The LSA Problem Grows LSA evidently became frustrated with Wartsila’s prolonged failure to respond to its requests. As previously noted, it wrote to Wartsila on February 7, 1995, attached its October 20, 1994 information request, and complained about the lack of response. It noted, among other things, that no design criteria had been provided and that mooring criteria for hurricane conditions still were not available. Significantly, it helpfully suggested that Wartsila would be aided “by getting the services of a Marine Consultant / Naval Architect who would first ascertain the worst weather scenario, i.e. hurricane winds and storm tide, and match these against the existing mooring system.” This communication appears finally to have prompted Wartsila to action, although Wart-sila never followed LSA’s recommendation to hire a competent marine consultant or naval architect. Later that month, it. assigned a young engineer to spend some time providing information to the insurance broker for use in responding to LSA. On February 28, 1995, AOI, which had been engaged again, this time to perform an as-built design review of the .mooring system, rendered its preliminary report. The report — which was based principally on the soil strength, wind, and maximum wave assumptions used previously — concluded that the pile guide frames were inadequate for the estimated loading and recommended changes to them. On instructions from Wartsila’s Alex Russin, Gary Reinschof MeGriff, Sei-bels & Williams, Wartsila’s insurance broker for La Isabela I, forwarded the report to LSA on March 2, 1995 and requested its assistance in obtaining an extension from the underwriters to modify the guide'frames. A short time later, AOI rendered its final report, stressing once again that the soil strength assumptions upon which the mooring design was based were inadequate. But this fell far short of responding to LSA’s requests. On March 15, 1998, LSA’s New York.office forwarded to Reinsch a memorandum from its London office which complained that most of the questions raised in LSA’s October 19, 1994 memorandum still had not been answered and raised a number of additional issues concerning the AOI as-built report. While AOI promptly responded on a number of points, LSA advised Wartsila through Reinsch that AOI’s response neither addressed the open questions remaining from LSA’s October 19, 1994 memo nor satisfied LSA on the points it did address. On March 28, 1995, Wartsila responded more fully to the questions concerning the AOI report that LSA had posed in its March 15, 1995 memo, enclosing additional supporting data. Two days later, LSA responded that the information had gone a long way, but' not far enough. It sought additional information concerning certain of the AOI work. More importantly, however, it pointed out yet again that the information it hád sought in its October 19, 1994 memo — more than five months before — concerning selection of the design wave criteria and the strength limitations of the barge against wave loads still had not been provided. These exchanges prompted a conference call among Wartsila, AOI and LSA. On April 4, 1995, following that call, LSA advised Wartsila through its broker that “the use of only a 9 foot wave for the wave force calculations has not been justified” and that “wave loads in excess of this could be experienced in severe hurricane conditions.” It insisted that the extreme design conditions for wind and sea loading be reassessed and pointed out that “the choice of realistic environmental data is essential to the design of the mooring system and any necessary strengthening of the barge Or the superstructure.” LSA Refuses to Approve the Mooring ■ In the days that followed, Wartsila and the broker scurried about in an effort to come up with justification for the environmental loading criteria. They provided a certain amount of information to LSA, none of which was specific to the particular site of this facility. But on April 13, 1995, LSA advised Wartsila and McGriff, Seibels that the information provided thus far was inadequate and that it could not approve the mooring until its concerns were resolved. LSA’s concerns were quite specific. It objected that the 9 foot wave height used to design the mooring was a significant wave height rather than the maximum wave height that could occur during a storm, that Wartsi-la had not provided information showing the frequency of occurrence of differing hurricane intensities nor provided any rational basis for selecting the particular hurricane intensity used for design purposes, that the use of a 9 foot wave height was inconsistent with one of the maximum wind speed assumptions, and that the information provided appeared to confuse storm surge with wave height. It indicated that Wartsila “has not provided statistical data showing the frequency of occurrence of the different hurricane intensities nor have they provided any rational basis for selecting the level of hurricane intensity that should be used for design purposes.” When LSA’s concerns were not addressed to its satisfaction, it advised McGriffs Reinsch on May 10, 1995 that it would “not approve the mooring arrangement for this barge beyond 1 June, 1995.” It emphasized that “[djocumentation requested has not been presented relative to the criteria in use and the strength of the barge, and we believe in practical terms this system cannot be made to provide an adequate hurricane mooring.” Coastal’s Knowledge of the Issue After Reinsch received LSA’s May 10 fax, Russin told him to advise Coastal of the situation. Reinsch therefore called Ken Smith of Coastal’s risk management department and filled him in. On May 12, 1995, Smith sent an e-mail to Coastal’s in-house counsel, the head of the risk management department, and other executives which read: “I have learned of an insurance issue which you should be aware of: “A & A in Baltimore originally placed the Hull coverage on the CEPP barge. At that time the lead underwriter warranted that windstorm coverage would be contingent upon the Moorings being approved by the London Salvage Association (LSA). “The LSA has still not approved the Moorings. The underwriters have confirmed to McGriff (the current insurance broker) that windstorm coverage is still in effect, however the current suspension of the warranty will expire June 1. “The LSA’s position is that the design and execution of the Moorings won’t be able to withstand the type of hurricane to which the Dominican Republic is subject. Wart-sila designed the Moorings for a 9 ft. wave and 100-120 mph wind. The LSA doesn’t agree with these parameters, their naval architect wanting the design to withstand a lOOyr. storm. “The underwriter’s [sic] have said that they might remove the warranty if sufficient data is presented. McGriff has been working for months accumulating data. They know that there have been 496 documented hurricanes in the last 100 years and 17 of these have touched the DR. The barge is located in a protected bay and a mountain protects the harbor on the south side. The location is the lee side of the island so if a vessel was to tie up to ride out a storm, this is where it would go. They also contend that the underwriter’s [sic] charge a premium for the risk and windstorm is contemplated in their premium. “McGriff expects to hear a decision from the underwriters this coming Monday or Tuesday. “If the underwriters won’t lift the warranty requirement our purchase terms should reflect the additional cost we might incur to bring this Moorings into compliance with the LSA’s standard.. I don’t know the extent of the cost. “McGriff says the LSA has not given specific recommendations, only saying that the present situation is not acceptable and the design should be for a 100 year storm.” Four days later, Michael Rauch, director of risk management for The Coastal Corporation, informed Mario Hurtado, Coastal’s project manager for the acquisition, and others of the problem, including the June 1, 1995 deadline. He advised that it-was “highly unlikely” that LSA would alter its view, counseled against Coastal self-insuring the windstorm risk, and recommended that Coastal insist that Wartsila bear any costs associated with upgrading the mooring to satisfy LSA, either directly or as an adjustment to the purchase price. The Closing Between May 12 and the closing, Russin and Reinsch discussed the insurance situation with Hurtado and his superior, Mark Barry. Russin, who believed that the problem could be worked out by an increase in the premium or the deductible even if LSA adhered to its position, told the Coastal representatives that he was confident that a solution could be reached. Coastal, allegedly because it viewed the matter as “just another open warranty issue,” did not suggest that the mooring be tested or reviewed, analyze the strength of the mooring, or quantify the implications of LSA’s position. In the meantime, efforts relating to the LSA continued. On May 22, 1995, Wartsila received a report from a consultant, A.H. Glenn, containing site specific information regarding 100 year'storm wind, tide, and wave characteristics at Puerto Plata Bay. The Glenn report, although Russin characterized it as “not ... too bad,” was quite troublesome to Wartsila. It reported one hour winds as 131 mph and total wave height (astronomical tide plus storm tide plus wave height) as 15.1 feet in a 100 year storm in Puerto Plata Bay, which were far in excess of that assumed by Wart-sila. Russin, who disagreed with it in some respects and appears to have misunderstood it in others, sent it on to Reinsch with the suggestion that it should be “properly presented before sending it on to [the] insurance company,” presumably a reference to LSA. But the Glenn report was not disclosed to either LSA or to Coastal before the closing. In any case, on May 26, 1995, LSA once again advised Reinsch that its objections had not been resolved fully. It remained concerned with- “the adequacy of some of the assumptions used by Wartsila regarding the worst environmental loading” and indicated that any “way forward” would “involve significant re-design or enhancement of the mooring system arrangements, rather than simply further engineering on what is presently installed.” The transaction closed on May 30, 1995, effective the following day. The parties were represented by major law firms. Although Coastal raised a number of other issues at the closing, all of which were resolved, it did not bring up the insurance problem. According to Coastal’s Barry, he was aware prior to the closing that modifications would have to be made to the mooring in order to satisfy LSA. He was aware too that the facts set forth in Smith’s May 12 email and Hurtado’s May 16 memorandum were not listed on the Disclosure Schedule and therefore arguably were within the scope of the Wartsila warranties. Despite Rauch’s recommendation that Coastal seek Wartsila’s agreement to bear the cost of modifications or, alternatively, a reduction in the purchase price, Barry deliberately chose not to raise the issue of the continuation of the windstorm coverage at the closing, allegedly in the belief that the cost of the necessary modifications would be Wartsila’s responsibility. Post-Closing Developments On June 1, 1995, the day following the closing, the windstorm coverage on La Isabe-la I terminated, although Coastal later that month succeeded, upon payment of an increased premium, in obtaining reinstatement of the windstorm coverage pending the implementation of the LSA modifications and Coastal’s agreement to make whatever modifications LSA might insist upon after a further joint review. On the same day, LSA informed McGriff, Seibels, which had become Coastal’s broker for the La Isabela project, of its requirements for approval of the mooring arrangements. It insisted that the mooring be capable of bearing the loads associated with maximum sustained winds of 130 mph, tide plus storm surge of 2.8 meters above mean sea level, and maximum wave height of 3 meters as well as satisfaction of other design factors intended to provide a margin of safety. It recommended that additional piles be installed and the height of existing piles increased. • Although it offered to consider suitable alternatives, it is worth noting that the magnitude of the increase in the environmental criteria reflected LSA’s pique at what it perceived as Wartsi-la’s failure to be more forthcoming with information. It admitted at trial that the criteria that it would have employed in determining whether to approve the mooring had it been happy with Wartsila’s cooperation would have been “subject to negotiation,” that it might have approved Wartsila’s criteria, and that it would have considered any reasonable proposal. Coastal raised the problem in a June 12, 1995 conference call with Wartsila, Treu of AOI and a representative of LSA. It claims, among other things, that Wartsila’s Russin then agreed that Wartsila would bear the cost of necessary modifications. Although there appears to have been inconclusive discussion concerning the possibility of Wartsila sharing in the cost of modifications estimated to cost no more than $400,000 or otherwise “mak[ing] the situation right,” the Court finds that Russin made no commitment. Not surprisingly, once the windstorm coverage was terminated and LSA had delivered its recommendations, Coastal concluded that the problem was more serious than it had believed prior to closing. It promptly obtained two internal estimates that placed the cost of the changes necessary to meet LSA’s requirements in the range of $350,000 to $500,000, and it tried to persuade LSA to change its design criteria. Some time in the June — July period, in connection with the renewal of the policy for the period following July 10, 1995, however, Coastal agreed to begin a program to bring the mooring up to LSA’s standards. Its first step toward that goal was to retain AOI to redesign the pile system to meet LSA’s requirements. AOI promptly advised Coastal that it had been concerned from the start about the validity of the soil strength data that had been provided to it by Wartsila. It retained MARSCO, Inc., a marine soil consultant, to. advise. MARSCO did two test borings to depths much greater than those to which the original piles had been driven and concluded that the strength of the soil surrounding the original piles was considerably weaker than Wartsila had assumed. MARSCO’s conclusion concerning soil strength was a bolt from the blue to both Coastal and LSA, although it should have surprised neither. Coastal made no effort prior to the closing to obtain any information regarding the strength and adequacy of the mooring despite the fact that the continuation of the insurance was conditioned upo'n LSA approval. Indeed, it failed to do so even after LSA withheld approval prior to the closing. LSA, for its part, sought no information regarding soil strength prior to being informed of the results of the MAR-SCO analysis after the closing, this despite having been informed in March that the design had been based on assumed rather than actual soil conditions. Nor did its June 1 conditions relate in any way to the soil issue. By December 1995, AOI and MARSCO together concluded — in significant measure as a consequence of the new soil strength information — that the upgrade of the mooring would require (1) lengthening of the existing piles and driving them to considerably greater depths, and (2) the addition of new piles. Coastal thereupon recommended to the CEPP board that the modifications be made. The recommendation was approved, and Weeks Marine was engaged in February 1996 to do the work at an ultimate cost to CEPP of $1,492,018.25. The total cost, including engineering fees and other expenses, exceeded $1.6 million.. The difference between the $350,000 to $500,000 estimates that Coastal received in early June 1995 and the actual cost of the work ultimately done was attributable to the fact that the soil into which the piles had been driven was weaker than Wartsila had assumed when the original mooring was designed. At about the time that Weeks Marine was engaged, Coastal advised Wartsila that it intended to make modifications to the mooring at a cost of approximately $1.7 million. Shortly thereafter, Wartsila advised Coastal’s Barry that Johnson & Higgins (“J & H”), a well known insurance broker that was bidding on coverage for another Wartsila facility, was confident that it could place competitive coverage for La Isabela, that it had identified two other surveyors who would be utilized by the alternative underwriters, and that it wished to conduct a survey of the plant in order to finalize a proposal. Wartsila suggested setting up a meeting to discuss the possibilities. Accordingly, Coastal, Wartsila and J & H representatives met on March 29,1996. By the date of the meeting, J & H had obtained a firm lead quotation from underwriters to provide the windstorm coverage at competitive premiums without a survey, although a survey would have been helpful in achieving the lowest possible premium. J & H opened the meeting by telling Coastal that it had a lead underwriter willing to write the coverage without making any modifications to the mooring and requested Coastal’s cooperation in having J & H arrange for a survey so that the proposal could be finalized. Barry of Coastal responded that Coastal did not wish J & H or Wartsila to take any further steps in this regard. He explained that insurance no longer was the issue, as the post-closing findings concerning soil strength had led Coastal to determine that it wished to bring the mooring up to “Coastal standards” independent of insurance requirements. He rejected J & H’s request to send a surveyor to inspect the mooring. Moreover, the Court finds that Coastal on at least three occasions rejected overtures from insurance brokers who asked that they be allowed to seek’ alternative insurance programs.’ that well might have avoided the need for modifications, or at least modifications as extensive as those Coastal chose to make. Indeed, Coastal elected not to seek another surveyor although it was advised that the position taken by LSA was unreasonable and that another surveyor might have obviated any need to modify the mooring. Coastal sought to explain its failure to pursue the possibility of other insurance by contending that its primary focus was to obtain reinstatement of the windstorm coverage as quickly as possible in order to avoid defaulting under the MARAD agreement and in view of the start of the hurricane season. It contends that it reasonably concluded, in view of the closed nature of the marine insurance business, that it was most likely to achieve those objectives by working with the existing underwriters and would have risked jeopardizing its position by seeking other insurance markets. It is unnecessary, however, to determine whether its. actions were reasonable efforts to mitigate any loss. As noted, Wartsila did produce some evidence tending to suggest that alternate coverage would have been available. But there is no convincing evidence that the underwriter who gave the lead indication obtained by J & H was aware of the results of the MAR-SCO study, the fact that LSA had rejected the mooring or, apparently, other negative information concerning the mooring. J & H acknowledged that this information would have had to have been disclosed prior to the underwriting of any coverage. Moreover, it is not even clear that the underwriter in question was prepared to write the coverage without requiring LSA approval. In the circumstances, the Court is not persuaded that alternative coverage would have been available absent the making of the modifications even if Coastal seriously had pursued it. The work in Puerto Plata began in late April or early May 1996 and concluded in late May or early June. Prior Proceedings The complaint in this action asserted securities and common law-fraud claims as well as claims for negligent misrepresentation, breach of warranty and breach of contract. In an unpublished order dated July 31, 1997, the Court granted defendants’ motion- for summary judgment to the extent that it dismissed the securities and common law fraud and negligent misrepresentation claims and certain of the warranty and contract claims. It granted plaintiffs’ motion for partial summary judgment to the extent that it determined that: (1) Events occurred prior to the closing, the date as of which the warranties spoke including at a minimum LSA’s statement on May 10, 1995 that it would not approve the mooring arrangement beyond June 1, 1995, which reasonably could be expected to have ah adverse effect on CEPP. In consequence, assuming the materiality of such an effect, defendants breached the warranties contained in Sections 3.6(xiii), 3.37 and 4.9 of the Purchase Agreement. The issue of materiality was reserved for trial. (2) Defendants breached the warranty contained in Section 3.17 of the Purchase Agreement because LSA’s determination that it would not approve the mooring arrangement was an “event ... which, with the passage of time ... would permit ... the termination of [a] Contract.” i.e., the windstorm coverage that was terminated on June 1,1995. (3) A condition occurred prior to the closing that reasonably could be expected to have an adverse effect on CEPP. Accordingly, the defendants breached their covenants in Sections 6.1 and 7.1' of the Purchase Agreement if the condition was material and the defendants permitted CEPP to suffer that condition. Discussion The Warranty Claims The Alleged Breaches The breach of warranty claims that remain following the Court’s ruling on the cross-motions for summary judgment are the following: 1. LSA’s refusal to approve the mooring and its indication on May 26, 1996 that its approval would require unspecified but significant redesign or enhancements breached the warranties contained in Sections 3.6(xiii) and 3.37 of the Purchase Agreement because it was an event or “fact, circumstance or condition,” respectively, prior to closing which “could reasonably be expected to have a Material Adverse Effect on CEPP” and which was not set forth in the Disclosure Schedule or the agreement. 2. The non-fulfillment of the LSA condition in the insurance policies resulted in., a breach of the warranty contained in Section 3 .17 of the Purchase Agreement,because it was an event “which, with the passage of time, would constitute a default by CEPP ... under any Contract or Permit.” which permitted termination both of the windstorm coverage and the MARAD financing. As indicated above, the Court previously granted plaintiffs’ motion for partial summary judgment to the extent that it determined that LSA’s May 10, .1995 refusal to approve the mooring (a) could reasonably be expected to have an adverse effect on CEPP and therefore breached the warranties contained in Sections 3.6(xiii) and 3.37 if that effect would have been material, and (b) permitted termination of the windstorm coverage and the MARAD financing and therefore was an event that resulted in a breach of the warranty contained in Section 3.17. The Effect of Coastal’s Decision to Close Given its Knowledge of the LSA Problem Defendants consistently have argued that Coastal’s breach of warranty claims must fail because Coastal knew prior to the closing both that LSA had refused to approve the mooring and that the windstorm coverage was terminable on the 'very next day. In ruling on'the summary judgment motions, the Court rejected that argument. It held that Coastal, by bargaining for defendants’ warranties, purchased their “contractual ‘commitment to place [Coastal] in the same economic position that [it] would have enjoyed had the warrantees] proved accurate” and that “[t]he justifiability of the [Coastal]’s reliance and the bona or mala fides of the defendants’] actions simply are not in issue.” The Second Circuit’s subsequent decision in Rogath v. Siebenmann, however, requires that this question be revisited. As Rogath makes clear, the question whether a purchaser may recover under New York law for breach of warranty absent reliance long was a subject of dispute and confusion. In CBS Inc. v. Ziff-Davis Publishing Co., however, the New York Court of Appeals held that the purchaser of a business which had received financial statements warranted to be accurate would be entitled to recover for breach of that warranty even if the. purchaser had formed doubts as to the truth of the warranted facts prior to the closing. To hold otherwise, it said, “would have, the effect of denying the express warranties of their only value to [the purchaser] — i.e., as continuing promises by [the seller] to indemnify [the purchaser] if the facts warranted proved to be untrue.” In so doing, moreover, it adopted the “basis of the bargain” approach to this issue, holding that “[t]he critical question is not whether the buyer believed in the truth of the warranted information.... but whether [he] believed [he] was purchasing the [seller’s] promise [as to its truth].” Although CBS seemed to the settle the issue as a matter of New York law, subsequent decisions in this Circuit have tread a less certain path. In Galli v. Metz, the Circuit, in the words of the Rogath panel, “delineated fine factual distinctions in the law of warranties,” holding that a buyer which “closes on a contract in full knowledge and acceptance of facts disclosed by the seller which would constitute a breach of warranty ... should be foreclosed from later asserting the breach ... unless the buyer expressly preserves his rights.” On the other hand, in Metromedia Co. v. Fugazy, the Circuit later relied upon CBS, without referring to Galli to uphold a trial court’s entry of judgment as a matter of law for a plaintiff on a breach of warranty claim, stating that the plaintiff was not obliged to demonstrate reliance on the facts warranted. While the precise basis of the appeal in Metromedia was a contention that purchaser had not bargained for the warranty at issue, rather than a claim that the facts warranted had not been relied upon, Metromedia nonetheless suggested that the Circuit had abandoned Galli’s holding that a buyer loses the benefit of an express warranty by closing unconditionally with knowledge of a breach gained from the seller. Rogath, however, now makes clear that the rule of Galli survives despite CBS and Metromedia. Rogath involved the sale of a painting pursuant to a bill of sale that warranted that the seller was the sole and absolute owner, had full right and authority to transfer the painting, and that the seller had no knowledge of any challenge to its title or to the painting’s authenticity. The district court granted summary judgment for the plaintiff, in part on the ground that the seller had been aware of a challenge to the authenticity of the painting over the seller’s contention that he had informed the buyer, who in any .event knew from another source, that there was an issue as to authenticity. The Court of Appeals reversed on the ground that there were material issues of fact as to what the buyer knew and whence his information, if any, had come. In doing so, it made clear its view that a buyer, under New York law, waives any claim for breach of warranty if the buyer is aware, by reason of the seller’s disclosure, of facts constituting a breach but closes without expressly reserving his rights to enforce the agreement. The buyer’s awareness of such facts from other sources, however, creates no such difficulty. Here, Wartsila’s Russin directed Reinsch of McGriff, Seibels to inform Coastal that the LSA on May It), 1995 had refused to approve the mooring. Reinsch did so. Coastal knew also from the Disclosure Schedule that the windstorm coverage was terminable effective June 1, 1995 if LSA approval were not forthcoming. Hence, Coastal was aware from Wartsila of facts that would permit termination of the windstorm coverage and lead to a default under the MARAD financing. Thus, it was aware of TCC’s breach of the warranty contained in Section 3.17 of the Purchase Agreement and may not recover on that theory. The question whether Coastal was aware of events or circumstances that reasonably could be expected to have a Material Adverse Effect on CEPP, and thus aware of breaches of the covenants contained in Sections 3.6(xiii), 3.37, and 4.9, is closer. Coastal argues that the question whether the LSA’s action ultimately would prove to be a serious or extensive problem was not clear prior to the closing and that Wartsila minimized its significance. In any case, it was ignorant prior to the closing of LSA’s May 26, 1995 statement that any further progress would be dependent upon “significant re-design or enhancement of the mooring system.” It therefore asserts that its decision to go forward with the closing thus was made in ignorance of highly material facts and that its warranty claim survives at least to this extent. Defendants, on the other hand, point to Smith’s May 12,1995 e-mail, which demonstrates that Coastal was aware that LSA insisted that the mooring be capable of riding out a 100 year storm. They contend that, while the e-mail spoke of the possibility that LSA’s concerns might be satisfied by the provision of additional data, it demonstrated that Coastal might incur additional expense “to bring this Mooring into compliance with LSA’s standard.” Moreover, Rauch’s May 16, 1995 memorandum to the Coastal project manager in charge of the acquisition stated that it was “highly unlikely” that LSA would alter its view, thus reflecting awareness that Coastal, if it closed, well might have to upgrade the mooring, and counseled against Coastal taking that risk. The significance of these documents, the Court finds, is clear. Wartsila advised Coastal of facts indicating a likelihood that Coastal, if it closed, would have to the modify the mooring to satisfy the LSA, While the adjective used by the LSA on May 26— “significant” — was not disclosed in haec ver-ba, Coastal knew from what Wartsila did disclose that it was “highly unlikely,” to use Rauch’s phrase, that LSA could be satisfied by the provision of additional data and, accordingly, that unspecified modifications of uncertain cost probably would be required. A fact typically is regarded as material if it would “assume[ ] actual significance in the deliberations of a reasonable” buyer. The Court holds that the risk of open-ended liability made apparent to Coastal would assume actual significance in the deliberations of a reasonable purchaser, and Coastal knew it. Accordingly, Coastal closed with knowledge obtained from Wartsila that Wartsila was in breach of the warranty contained in Sectiqn 4.9 of the Purchase Agreement and therefore may not recover for that breach. The warranty claim against TCC follows the same analysis save perhaps in one respect. Rogath stressed that a buyer’s decision to close with knowledge of a breach of warranty defeats the buyer’s claim provided the information as to the breach comes from the seller. Were Rogath read literally, it might be contended that Coastal’s warranty claim against TCC survives because Coastal’s information concerning the LSA problem came from Wartsila, not TCC. Coastal, however, has not made this contention, which in any ease would not be persuasive on the facts of this case. While TCC nominally was the record owner of the CEPP shares that here changed hands, it was Wartsila that had the principal economic interest in the transaction and, as the designer of the mooring and builder of the plant, was the reservoir of information to which Coastal perforce looked in evaluating the deal. Thus, while TCC in form was the seller, Wartsila was the seller in all practical respects. Certainly Rogath, which dealt with a simple bilateral transaction, did not hold that a buyer who closes, without reserving its rights, despite awareness of a breach of warranty gained from the dominant party on the other side of the deal, may proceed against a subordinate party simply because the dominant rather than the subordinate party was the source of the buyer’s information. Accordingly, Coastal’s claims for breach of warranty must be dismissed. The Contract Claims Liability TCC covenanted that it would (1) not suffer, or permit CEPP to suffer, any transaction or condition that could reasonably be expected to have a Material Adverse Effect upon it, (2) use its best efforts to preserve intact CEPP’s existing business relationships, and (3) give prompt written notice to Coastal of any occurrence of “any ... event which with the giving of notice, the passage of time or both would reasonably be expected to constitute a breach or default, with respect to any Contracts ... of CEPP” or “which would result in ... any of Seller’s representations or warranties ... being or becoming inaccurate or misleading in any material respect ...” Wartsila covenanted that it would “take such action within its power to perform” TCC’s covenants. Coastal claims that both breached their covenants because they (1) permitted CEPP to suffer a condition likely to have a material adverse effect and failed to use best efforts to preserve CEPP’s existing business relationships, in each ease by failing to provide LSA with requested information and otherwise to ensure that LSA approval was obtained, and (2) failed to give written notice as required. The claim against TCC is speedily disposed of. For all practical purposes, Wartsi-la was in sole charge of CEPP and La Isabe-la. TCC was simply a financial party. It had no knowledge concerning the mooring, the design, or any of the events relating to the LSA and the windstorm coverage. It simply, and quite reasonably, looked to Wart-sila to do what was required. It certainly did not fail to discharge any contractual duty to Coastal. The notice claim against Wartsila also is deficient. LSA's May 10, 1995 announcement that it would not approve the mooring was an event which, with the giving of notice, the passage of time, or both, would result in a default under the MARAD financing documents and permit termination of the windstorm coverage, both of which were material. There was no written notice. But the lack of written notice gave rise to no damages in view of Reinsch’s telephonic advice to Smith, given at Russin’s direction, of the LSA’s action. The other contract claims against Wartsila, however, are more substantial. The covenant not to permit CEPP to suffer any event or condition that could be expected to have a material adverse impact and Wartsila’s affirmative commitment to take such actions as were within its power to preserve CEPP’s existing business relationships served an important purpose in this transaction that is best understood in the broader context of the structure of the purchase contract. ( Coastal contracted to buy the stock without warranties as to the condition or characteristics of the barge or the mooring, relying instead on its own ability to conduct appropriate due diligence and on the contractual obligations of Wartsila and TCC to give it full access to whatever it needed to form its own judgment about the asset it was buying. In substance, it bought the asset just as most people buy used cars—it relied upon its own ability to assess what it was buying rather than any assurances from the seller. As there was to be a significant interval between the effective date of the purchase agreement and the closing of the transaction, however, the covenants here at issue were bargained-for assurances that Wartsila would not allow the value of the asset, whatever it was, to deteriorate and, indeed, would seek to ensure that one component of the value—existing business relationships—would continue through the closing. Against this background, it is readily apparent that Wartsila breached its obligations. From May 1994 on, LSA repeatedly pressed Wartsila for justification of its design criteria and for detailed information of various sorts. Some of this information was provided, some in a timely fashion and some after delays; much was not. Most notably, site specific environmental data directly responsive to LSA’s repeated requests was not provided for many months, and when it finally arrived in the form of the Glenn report, Wartsila withheld it from LSA. These failures led directly to LSA’s determination that it would not approve the mooring, an event likely to have a material adverse effect on CEPP and an event attributable in substantial part to Wartsila’s unresponsiveness. As the covenants contained, in Sections 6.1 and 7.1 in substance obligated Wartsila to do what was necessary, at least within reasonable limits, to avoid the occurrence prior to the closing of an event likely to have a material adverse effect, Wartsila’s actions and failures to act were inconsistent with its obligations. The same reasoning requires the conclusion that Wartsila breached its obligation to take such actions as were within its power to preserve CEPP’s existing business relationships. While the outer limits of the obligations undertaken by such a covenant are not entirely clear, this case is not at the uncertain end of the spectrum. Wartsila knew that the windstorm coverage was terminable on the day following the closing absent LSA approval of the 'mooring. Yet it was considerably less than fully forthcoming in responding to LSA’s information requests. That behavior cannot be squared with its obligation to take such actions as were within its power to avoid the termination of the windstorm coverage, the continuation of which was a business relationship within the scope of the covenant. Causation and Damages Although Wartsila breached certain of its covenants, it contends that the damages claimed by Coastal — the full cost of all of the modifications it ultimately made to the mooring and the incremental cost of keeping the windstorm coverage in force during the interval between its reinstatement and the completion of the modifications — are too remote and therefore not its responsibility. The rules governing damages are easily stated: “Although any breach of contract entitles the injured party at least to nominal damages, he cannot recover more without establishing a basis for an inference of fact that he has been actually damaged.” If the fact of damage is established, “the nonbreaching party may recover general damages[,] which are the natural and probable consequence of the breach[,]” as well as special or consequential damages— damages which arise from special circumstances that make them probable, although they would be unusual apart from such circumstances. Under the second rule of Hadley v. Baxendale, special or consequential damages may be recovered only if they are “within the contemplation of the parties as the probable result of a breach at the time of or prior to contracting.” This ease of statement, however, conceals considerable difficulty in application. Wartsila begins its defense by asserting that plaintiffs have failed to establish that they were injured in fact by its breaches— that the breaches were a “but for” cause of the damages. It argues that there is no basis for concluding that any added cost incurred by Coastal was a product of Wartsi-la’s failure to perform according to the letter of its bargain. But the argument is unpersuasive. Translating the far more general language of the covenants that Wartsila breached into terms specific to its defaults, Wartsila’s obligation was to ensure, at least within reasonable limits, that LSA was provided with the information it requested to make a timely and informed decision as to whether to approve the mooring, approval which would have eliminated (1) the condition to the underwriters’ obligation to continue the windstorm coverage, and (2) the possibility of termination of the MARAD financing for failure to maintain the necessary insurance. It is, as Wartsila argues, impossible to say with certainty what would have occurred had Wartsila responded promptly and fully to LSA’s requests. Perhaps LSA, unprovoked by what it took to be Wartsila’s unresponsiveness, would have approved the mooring. On the other hand, it is more likely that LSA would not have approved because, in fact, Wartsila did not have site specific data regarding probable environmental conditions until it received the Glenn report just days before the closing and therefore could not justify its environmental loading assumptions. Hence, if Wartsila had performed its obligations, LSA would have withheld its approval, but it would have done so at least several months rather than 20 days prior to the closing. This delay is critical in assessing causation in this case. One must bear in mind what was going on here. It is true that Wartsila did not warrant the condition of the mooring or that the windstorm coverage would continue as before. Both parties knew that there was a risk that LSA would not approve the mooring and, if that contingency occurred, that something would have to be done if insurance coverage was to remain in place. But the incidence of that risk depended entirely on whether the insurance issue came to a head before or after the closing. If any material problem were to arise before the closing, Coastal would have had the right to terminate the agreement. Hence, the risk would have fallen wholly on Wartsila. If a material problem first became apparent after the closing, on the other hand, the loss would have been borne entirely by Coastal. By stalling or ignoring LSA’s requests for information, Wartsila not only breached i