Citations

Full opinion text

MEMORANDUM DECISION RE CROSS-MOTIONS FOR SUMMARY JUDGMENT ON NEPA ISSUES OLIVER W. WANGER, District Judge. I. INTRODUCTION This case arises out of the United States Fish and Wildlife Service’s (“FWS”) December 15, 2008 biological opinion (“BiOp” or “2008 smelt BiOp”) addressing the impact of coordinated operations of the Central Valley Project (“CVP”) and State Water Project (“SWP”) (the “Projects”) on the threatened delta smelt, prepared pursuant to Section 7(a)(2) of the Endangered Species Act (“ESA”), 16 U.S.C. 1536(a)(2). Because the BiOp found that planned coordinated Project operations would jeopardize the continued existence of the delta smelt and/or adversely modify its critical habitat, FWS proposed a Reasonable and Prudent Alternative (“RPA”) that imposes certain operating restrictions on the Projects. The Bureau of Reclamation (“Reclamation”) provisionally accepted and then implemented the BiOp and its RPA. Plaintiffs in three of the five consolidated cases, namely San Luis & Delta Mendota Water Authority (“Authority”) and Westlands Water District (“Westlands”), State Water Contractors (“SWC”), and Metropolitan Water District of Southern California (“MWD”) (collectively, “Plaintiffs”) move for summary judgment, arguing that issuance and/or implementation of the BiOp/RPA is a “major federal action” that will inflict harm on the human environment, and that FWS and/or Reclamation should have, but did not conduct an environmental assessment (“EA”) or prepare an environmental impact statement (“EIS”) under the National Environmental Policy Act (“NEPA”). Doc.245. Federal Defendants and DefendanWIntervenors oppose, Docs. 290 & 281, and have submitted supporting declarations, Docs. 290-2 (Paul Fujitani), 281-2 (Charles A. Simenstad). Plaintiffs replied and submitted a supporting declaration. Docs. 297 & 197-2 (Thomas Boardman). DefendanWIntervenors cross-move for summary judgment on this claim, arguing that FWS was not required to prepare an EIS in connection with issuance of the BiOp. Doc. 244. Plaintiffs oppose. Doc. 287. Defendant-Intervenors filed a reply. Doc. 298. In response to the district court’s request for further argument on Reclamation’s liability under NEPA, the parties submitted supplemental briefs. Docs. 357-58, 360-61. II. STATEMENT OF FACTS The 2008 BiOp concluded that “the coordinated operations of the CVP and SWP, as proposed, are likely to jeopardize the continued existence of the delta smelt” and “adversely modify delta smelt critical habitat.” BiOp 276-78. As required by law, FWS’s BiOp includes an RPA designed to allow the projects to continue operating without causing jeopardy or adverse modification. BiOp 279. The RPA includes various operational components designed to reduce entrainment of smelt during critical times of the year by controlling and reducing water flows in the Delta. BiOp 279-85. Component 1 (Protection of the Adult Delta Smelt Life Stage) consists of two Actions related to Old and Middle River (“OMR”) flows. Action 1, requiring OMR flows to be no more negative than -2,000 cubic feet per second (“cfs”) on a 14-day average and no more negative than -2,500 cfs for a 5-day running average, is triggered during low and high entrainment risk periods based on physical and biological monitoring. BiOp 281, 329. Action 2, setting maximum negative flows for OMR, is triggered immediately after Action 1 ends or if recommended by the Smelt Working Group (“SWG”). BiOp 281-282, 352. Under Component 2 (Protection of Larval and Juvenile Delta Smelt), OMR flows must remain between -1,250 and -5,000 cfs beginning when Component 1 is completed, when Delta water temperatures reach 12 Celsius, or when a spent female smelt is detected in trawls or at salvage facilities. BiOp 282, 357-358. Component 2 remains in place until June 30 or when the Clifton Court Forebay water temperature reaches 25 Celsius. BiOp 282, 368. Component 3 (Improve Habitat for Delta Smelt Growth and Rearing) requires sufficient Delta outflow to maintain average mixing point locations of Delta outflow and estuarine water inflow (“X2”) from September to December, depending on water year type, in accordance with a specifically described “adaptive management process” overseen by FWS. BiOp 282-283, 369. Under Component 4 (Habitat Restoration), the California Department of Water Resources (“DWR”) is to create or restore 8,000 acres of intertidal and subtidal habitat in the Delta and Suisun Marsh within 10 years. BiOp 283-284, 379. Under Component 5 (Monitoring and Reporting), the Projects gather and report information to ensure proper implementation of the RPA actions, achievement of physical results, and evaluation of the effectiveness of the actions on the targeted life stages of delta smelt, so that the actions can be refined, if needed. BiOp 284-285, 328, 375, 37. It is undisputed that no NEPA documentation was prepared by either FWS or Reclamation in connection with the issuance, provisional adoption, and/or implementation of the BiOp and RPA. III. ANALYSIS A. Threshold Issues. 1. Requests for Judicial Notice. a. Plaintiffs’Request for Judicial Notice. Plaintiffs request judicial notice of the May 29, 2009 Findings of Fact and Conclusions of Law entered in this case. Doc. 94. This document is judicially noticeable as part of the court record. Plaintiffs also request judicial notice of a document authored by DWR, entitled “Delta Water Exports Could be Reduced by Up to 50 Percent Under New Federal Biological Opinion: DWR Director Snow Responds to Delta Smelt Biological Opinion” (Dec. 15, 2008). This is a judicially noticeable record or report of an administrative body, see United States v. 14.02 Acres of Land More or Less in Fresno County, 547 F.3d 943, 955 (9th Cir.2008), although only for its publication and the existence of its content, not for the truth of disputed matters asserted in the document. b. Defendant Intervenors’ Request for Judicial Notice. Defendant Intervenors request judicial notice of the following three documents attached to the Declaration of George Torgun, Esq., Doc. 285: • Exhibit 1: Reclamation’s Draft EIS/ EIR for the El Dorado County Water Agency Proposed Water Service Contract. • Exhibit 2: A Summary Document, published by CalFed, concerning the Two Gates Project. • Exhibit 3: A DWR Fact Sheet on the Two Gates Project. These are public documents published by administrative bodies and readily available on the internet. They may be judicially noticed for their publication and their contents, but not for the truth of disputed matters asserted in the documents. 2. Effect of Preliminary Injunction Decision. The May 29, 2009 Findings of Fact and Conclusions of Law and Order Re Plaintiffs’ Motion for Preliminary Injunction (“May 29, 2009 PI Decision” or “PI Decision”), found that Plaintiffs were likely to succeed on their NEPA claim against the FWS. Doc. 94. Plaintiffs cite the PI Decision’s findings, suggesting that the district court “has already determined” several key issues in this case. See, e.g., Doc. 245-2 at 7. But, “decisions on preliminary injunctions are just that — preliminary — and must often be made hastily and on less than a full record.” S. Or. Barter Fair v. Jackson County, Or., 372 F.3d 1128, 1136 (9th Cir.2004) (citing Univ. of Tex. v. Camenisch, 451 U.S. 390, 395, 101 S.Ct. 1830, 68 L.Ed.2d 175 (1981)). Thus, even [where] the facial challenge presented to the district court here involved primarily issues of law, we see no reason why [a] court should [ ] deviate[ ] from the general rule that decisions on preliminary injunctions ‘are not binding at trial on the merits,’ and do not constitute the law of the case. Id. (internal citations and quotations omitted). Although the PI Decision may be considered, it is not law of the case nor is it dispositive of any issue presently before the court. There is no requirement that Defendants supply new law or facts to justify a different decision at the summary judgment stage. Although a court has the discretion to dissolve or modify a preliminary injunction upon introduction of new facts or law, or a showing of changed conditions, see Mariscalr-Sandoval v. Ashcroft, 370 F.3d 851, 859 (9th Cir.2004), summary judgment is an entirely independent proceeding from the preliminary injunction phase. 3. Burden of Proof. Plaintiffs suggest that the “shift in procedural posture,” from preliminary injunction to summary adjudication, “lessens Plaintiffs’ burden.” Doc. 245-2 at 3. Their argument continues. This Court’s preliminary injunction was predicated, in part, on the Court’s determination that Plaintiffs demonstrated they were likely to suffer irreparable harm because of the 2008 BiOp’s effects on the human environment. On summary judgment, however, Plaintiffs’ required showing is relaxed: if the Court determines the 2008 BiOp may affect the human environment, NEPA’s requirements are triggered. Id. This inaccurately states the governing standards. In the preliminary injunction context, “a plaintiff seeking a preliminary injunction must establish that he is likely to succeed on the merits, that he is likely to suffer irreparable harm in the absence of preliminary relief, that the balance of equities tips in his favor, and that an injunction is in the public interest.” Am. Trucking Assns., Inc. v. City of Los Angeles, 559 F.3d 1046, 1052 (9th Cir.2009) (citing Winter v. NRDC, — U.S. —, 129 S.Ct. 365, 172 L.Ed.2d 249 (2008).). Within the likelihood of success on the merits prong, a court must evaluate each claim according to applicable legal standards. Here, that standard, in part, involves an inquiry into whether “there are substantial questions about whether a project may cause significant degradation of the human environment.” Native Ecosystems Council v. U.S. Forest Serv., 428 F.3d 1233, 1239 (9th Cir.2005). For a preliminary injunction, plaintiffs only had to establish that they are “likely” to meet this burden under. On summary judgment, plaintiff must actually prove success by a preponderance of the evidence. B. Applicable Legal Standards. Because NEPA contains no separate provision for judicial review, compliance with NEPA is reviewed under the Administrative Procedure Act (“APA”), 5 U.S.C. 706(2)(A); NW Resource Info. Ctr., Inc. v. NMFS, 56 F.3d 1060, 1066 (9th Cir.1995), provided (1) there is final agency action and (2) Plaintiffs can show that they have suffered a legal wrong or will be adversely affected within the meaning of the statute, Northcoast Envt’l Ctr. v. Glickman, 136 F.3d 660, 668 (9th Cir.1998). It is undisputed that the chal lenged agency action, the issuance of the 2008 smelt BiOp and its RPA, is “final agency action.” See Bennett v. Spear, 520 U.S. 154, 161, 178, 117 S.Ct. 1154, 137 L.Ed.2d 281 (1997) (issuance of biological opinion is “final agency action”). It is also undisputed that Plaintiffs have been adversely affected by the issuance of the 2008 smelt BiOp and implementation of its RPA controlling the Projects’ water flows. NEPA requires all federal agencies to prepare an EIS to evaluate the potential environmental consequences of any proposed “major Federal action[] significantly affecting the quality of the human environment.” 42 U.S.C. 4332(C). The preparation of an EIS serves a number of purposes: It ensures that the agency, in reaching its decision, will have available, and will carefully consider, detailed information concerning significant environmental impacts; it also guarantees that the relevant information will be made available to the larger audience that may also play a role in both the decisionmaking process and the implementation of that decision. Simply by focusing the agency’s attention on the environmental consequences of a proposed project, NEPA ensures that important effects will not be overlooked or underestimated only to be discovered after resources have been committed or the die otherwise cast. Moreover, the strong precatory language of 101 of the Act and the requirement that agencies prepare detailed impact statements inevitably bring pressure to bear on agencies to respond to the needs of environmental quality. 115 Cong. Rec. 40425 (1969) (remarks of Sen. Muskie). Publication of an EIS, both in draft and final form, also serves a larger informational role. It gives the public the assurance that the agency has indeed considered environmental concerns in its decisionmaking process, and, perhaps more significantly, provides a springboard for public comment. Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 349, 109 S.Ct. 1835, 104 L.Ed.2d 351 (1989) (internal citations and quotations omitted). “NEPA does not contain substantive requirements that dictate a particular result; instead, NEPA is aimed at ensuring agencies make informed decisions and contemplate the environmental impacts of their actions.” Ocean Mammal Inst. v. Gates, 546 F.Supp.2d 960, 971 (D.Hi.2008) (quoting Idaho Sporting Cong. v. Thomas, 137 F.3d 1146, 1149 (9th Cir. 1998)). “NEPA emphasizes the importance of coherent and comprehensive upfront environmental analysis to ensure informed decision making to the end that the agency will not act on incomplete information, only to regret its decision after it is too late to correct.” Ctr. for Biological Diversity v. U.S. Forest Service, 349 F.3d 1157, 1166 (9th Cir.2003) (internal citation and quotations omitted). Federal regulations implementing NEPA define major federal action: Major Federal action includes actions with effects that may be major and which are potentially subject to Federal control and responsibility. Major reinforces but does not have a meaning independent of significantly ([40 C.F.R.] 1508.27). Actions include the circumstance where the responsible officials fail to act and that failure to act is reviewable by courts or administrative tribunals under the Administrative Procedure Act or other applicable law as agency action. (a) Actions include new and continuing activities, including projects and programs entirely or partly financed, assisted, conducted, regulated, or approved by federal agencies; new or revised agency rules, regulations, plans, policies, or procedures; and legislative proposals (1506.8,1508.17). Actions do not include funding assistance solely in the form of general revenue sharing funds, distributed under the State and Local Fiscal Assistance Act of 1972, 31 U.S.C. 1221 et seq., with no Federal agency control over the subsequent use of such funds. Actions do not include bringing judicial or administrative civil or criminal enforcement actions. (b) Federal actions tend to fall within one of the following categories: (1) Adoption of official policy, such as rales, regulations, and interpretations adopted pursuant to the Administrative Procedure Act, 5 U.S.C. 551 et seq.; treaties and international conventions or agreements; formal documents establishing an agency’s policies which will result in or substantially alter agency programs. (2) Adoption of formal plans, such as official documents prepared or approved by federal agencies which guide or prescribe alternative uses of Federal resources, upon which future agency actions will be based. (3) Adoption of programs, such as a group of concerted actions to implement a specific policy or plan; systematic and connected agency decisions allocating agency resources to implement a specific statutory program or executive directive. (4) Approval of specific projects, such as construction or management activities located in a defined geographic area. Projects include actions approved by permit or other regulatory decision as well as federal and federally assisted activities. 40 C.F.R. 1508.18. When an agency takes major federal, the agency must prepare an EIS “where there are substantial questions about whether a project may cause significant degradation of the human environment.” Native Ecosystems, 428 F.3d at 1239. An agency may choose to prepare an environmental assessment (“EA”) to determine whether an EIS is needed. 40 C.F.R. 1501.4, 1508.9(b). The EA must identify all reasonably foreseeable impacts, analyze their significance, and address alternatives. 40 C.F.R. 1508.8, 1508.9, 1508.27. If, based on the EA, the agency concludes that the proposed actions will not significantly affect the environment, it may issue a Finding of No Significant Impact (“FONSI”) and forego completion of an EIS. See Bob Marshall Alliance v. Hodel, 852 F.2d 1223, 1225 (9th Cir.1988); 40 C.F.R. 1501.4(e). Whether an action may significantly affect the environment “requires consideration of context and intensity.” Center for Biological Diversity v. Nat’l Highway Traffic Safety Admin., 538 F.3d 1172, 1185 (9th Cir.2008) (citing 40 C.F.R. 1508.27). “Context delimits the scope of the agency’s action, including the interests affected.” Id. (quoting Nat’l Parks & Conservation Ass’n v. Babbitt, 241 F.3d 722, 731 (9th Cir.2001)). Intensity refers to the “severity of impact,” which includes both beneficial and adverse impacts, [t]he degree to which the proposed action affects public health or safety, [t]he degree to which the effects on the quality of the human environment are likely to be highly controversial, “[t]he degree to which the possible effects on the human environment are highly uncertain or involve unique or unknown risks,” and “[w]hether the action is related to other actions with individually insignificant but cumulatively significant impacts.” Id. at 1185-86 (citing 40 C.F.R. 1508.27(b)(2), (4), (5), (7)). The parties debate at length the degree of deference owed to an agency’s decision under NEPA. However, in this case, neither agency made any NEPArelated decision to which deference is owed. The relevant standard is “reasonableness,” as articulated in High Sierra Hikers Ass’n v. Blackwell: Typically, an agency’s decision not to prepare an EIS is reviewed under the arbitrary and capricious standard; however, where an agency has decided that a project does not require an EIS without first conducting an EA, we review under the reasonableness standard. 390 F.3d 630, 640 (9th Cir.2004). “Further, when an agency has taken action without observance of the procedure required by law, that action will be set aside.” Id. (citations omitted). C. Major Federal Action. 1. Was FWS’s Issuance of the Biological Opinion Major Federal Action? a. 40 C.F.R. 1508.18. Plaintiffs suggest that the issuance of the 2008 BiOp constitutes a “major federal action” under 40 C.F.R. 1508.18, which provides that the word “major” in the phrase major federal action “reinforces but does not have a meaning independent of’ the term “significantly” in “significantly affecting the human environment.” Does the issuance of a BiOp constitute a “federal action” under the meaning of the statute? Section 1508.18(b) provides that “[f]ederal actions tend to fall within one of the following categories”: (1) Adoption of official policy, such as rules, regulations, and interpretations adopted pursuant to the Administrative Procedure Act, 5 U.S.C. 551 et seq.; treaties and international conventions or agreements; formal documents establishing an agency’s policies which will result in or substantially alter agency programs. (2) Adoption of formal plans, such as official documents prepared or approved by federal agencies which guide or prescribe alternative uses of Federal resources, upon which future agency actions will be based. (3) Adoption of programs, such as a group of concerted actions to implement a specific policy or plan; systematic and connected agency decisions allocating agency resources to implement a specific statutory program or executive directive. (4) Approval of specific projects, such as construction or management activities located in a defined geographic area. Projects include actions approved by permit or other regulatory decision as well as federal and federally assisted activities. 40 C.F.R. 1508.18 (emphasis added). Plaintiffs principally rely on 1508.18(b)(4) as applicable to the coordinated operations of the Projects. The only court that has applied 40 C.F.R. 1508.18(b)(4) to require NEPA analysis for a biological opinion is Ramsey v. Kantor, 96 F.3d 434 (9th Cir.1996), which applied NEPA to the National Marine Fisheries Service’s (“NMFS”) issuance of a biological opinion and incidental take statement (“ITS”) under ESA 7 permitting state regulators to issue salmon fishing regulations consistent with that take statement. 96 F.3d at 441-445. Ramsey found the biological opinion and ITS constituted “major federal action,” triggering NEPA compliance, because it was “clear ... both from our cases and from the federal regulations, see 40 C.F.R. 1508.18, that if a federal permit is a prerequisite for a project with adverse impact on the environment, issuance of that permit does constitute major federal action and the federal agency involved must conduct an EA and possibly an EIS before granting it.” Id. at 444. Ramsey determined: [T]he incidental take statement in this case is functionally equivalent to a permit because the activity in question would, for all practical purposes, be prohibited but for the incidental take statement. Accordingly, we hold that the issuance of that statement constitutes major federal action for purposes of NEPA. Id. The Ramsey federal defendants contended that there was insufficient federal participation in a state run project to require an EIS. The Appeals Court disagreed: “if a federal permit is a prerequisite for a project with adverse impact on the environment, issuance of that permit does constitute a major federal action .... ” triggering NEPA. Id. at 444 (internal citations and quotations omitted). Ramsey held that “the incidental take statement in [that] ease is functionally equivalent to a permit because the activity in question would, for all practical purposes, be prohibited but for the incidental take statement.” Id. Because the ITS was the functional equivalent of a permit, NEPA applied to the issuance of the biological opinion, despite federal defendants’ contention that the mere issuance of an ITS was insufficient federal participation in a state project. Here, unlike Ramsey, the CVP is an entirely federal project, operated by Reclamation, a federal agency, rendering Ramsey’s “functional equivalency” analysis largely irrelevant. Ramsey stands for two important principles: First, under certain circumstances, a biological opinion may qualify as a major federal action for NEPA purposes; second, not every biological opinion is a major federal action. Plaintiffs maintain that the 2008 smelt BiOp qualifies as a major federal action under 40 C.F.R. 1508.18(b)(4) as a matter of course. See Doc. 245-2 at 10 (suggesting, without any analysis that the 2008 smelt BiOp is subject to NEPA because under 1508(b)(4) “actions approved by permit or other regulatory decision are major federal actions”). Plaintiffs do not explicate the basis for 1508.18(b)(4)’s application to the 2008 Smelt BiOp. Plaintiffs’ argument that the BiOp is the “functional equivalent” of a permit, premised on Ramsey, is unhelpful because Ramsey is distinguishable. Plaintiffs rely on language from the PI Decision suggesting the BiOp is an “approval of [a] specific project[ ], such as [a] management activity] located in a defined geographic area ... approved by ... [a] regulatory decision.” See 40 C.F.R. 1508.18(b)(4). No party provides any relevant regulatory definitions, legislative history, or caselaw interpreting the “management activity” language from 1508.18(b)(4). The BiOp and its RPA/ITS arguably constitute a “management activity,” as they prescribe concerted actions to manage federal resources implementing a specific plan designed to “manage” threats to the smelt. The BiOp is also, arguably, a “formal plan[ ] ... which guide[s] or prescribed alternative uses of Federal resources, upon which future agency actions will be based.” See 40 C.F.R. 1508.18(b)(2). Federal Defendants counter that the BiOp cannot possibly constitute major federal action because it is not binding upon Reclamation. They suggest, if the BiOp is merely a suggested course of action, it is not an “approval of [a] specific project[ ], such as [a] management activity] located in a defined geographic area ... approved by ... [a] regulatory decision,” or a “formal plan [ ] ... which guide[s] or prescribe[s] alternative uses of Federal resources, upon which future agency actions will be based.” b. Is the BiOp Binding Upon Reclamation? Westlands Water Dish v. U.S. Dept. of Intenor, Bureau of Reclamation, 850 F.Supp. 1388, 1422 (E.D.Cal.1994), considered as a factor in deciding if a BiOp is major federal action whether the BiOp is binding upon the action agency. Plaintiffs maintain that “[t]he binding nature of the 2008 BiOp is not susceptible to reasonable debate.” Doc. 287 at 8. This is an overstatement. Westlands denied federal defendants’ motion to dismiss water districts’ claims that NMFS and the Bureau failed to comply with NEPA by, among other things, not completing an EA or EIS before issuing a biological opinion concerning the effects of coordinated Project operations on the winter-run Chinook Salmon and implementing the RPA articulated in that biological opinion. Id. at 1394-95. The federal defendants in Westlands argued that the biological opinion was not a “major federal action” because it was merely advisory. Id. at 1420 (citing 40 C.F.R. 1508.18(b)(3)). The Westlands plaintiffs, as the Plaintiffs do here, suggested that the biological opinion and RPA at issue effectively bound Reclamation because Reclamation “must either follow the alternative suggested or risk violation of ESA 7(a)(2) ...” Id. at 1420. Westlands found that, as a general rule, “[bjiological opinions are not binding on the Secretary, nor do they invariably require an EIS.” 850 F.Supp. at 1422 (emphasis added). Rather, a case-by-case analysis is required: A biological opinion is part of the ESA process originated by 16 U.S.C. 1536(a)(2), which requires federal agencies, with the assistance of the Secretary, to “insure that any action authorized, funded, or carried out by such agency ... is not likely to jeopardize the continued existence of any endangered species or threatened species.” The federal agency undertaking such activity must consult the service having jurisdiction over the relevant endangered species. 16 U.S.C. 1536(a)(3). The U.S. Fish and Wildlife Service (FWS) and the National Marine Fisheries Service (NMFS), are jointly responsible for administering the ESA. 50 C.F.R. 402.01(b) (1992). The consulting service then issues a biological opinion that details how the proposed action “affects the species or its critical habitat,” including the impact of incidental takings of the species. 16 U.S.C. 1536(b)(3)(A). “The agency is not required to adopt the alternatives suggested in the biological opinion; however, if the Secretary deviates from them, he does so subject to the risk that he has not satisfied the standard of Section 7(a)(2).” Tribal Village of Akutan v. Hodel, 869 F.2d 1185, 1193 (9th Cir.1988) (citation omitted), cert. denied, 493 U.S. 873, 110 S.Ct. 204, 107 L.Ed.2d 157 (1989). A Secretary can depart from the suggestions in a biological opinion, and so long as he or she takes “alternative, reasonably adequate steps to insure the continued existence of any endangered or threatened species, ” no ESA violation occurs. Id. at 1193 95; Pyramid Lake Paiute Tribe of Indians v. Department of Navy, 898 F.2d 1410, 1418 (9th Cir.1990) (“a non Interior agency is given discretion to decide whether to implement conservation recommendations put forth by the FWS”). The Joint Regulations state: The Service may provide with the biological opinion a statement containing discretionary conservation recommendations. Conservation recommendations are advisory and are not intended to carry any binding legal force. 50 C.F.R. 402.14(3) (1992). 50 C.F.R. 402.15(a) states: [ ] Following the issuance of a biological opinion, the Federal agency shall determine whether and in what manner to proceed with the action in light of its section 7 obligations and the Service’s biological opinion. Courts have attempted to define the “point of commitment,” at which the filing of an EIS is required, during the planning process of a federal project. See Sierra Club v. Peterson, 717 F.2d 1409, 1414 (D.C.Cir.1983). “An EIS must be prepared before any irreversible and irretrievable commitment of resources.” Conner v. Burford, 848 F.2d 1441, 1446 (9th Cir.1988), cert. denied 489 U.S. 1012, 109 S.Ct. 1121, 103 L.Ed.2d 184 (1989). 40 C.F.R. 1502.5(a) similarly provides, “[f]or projects directly undertaken by Federal agencies, the environmental impact statement shall be prepared at the feasibility analysis (go/no go) stage and may be supplemented at a later stage if necessary.” [One of the water agency plaintiffs] points out that the Environmental Review Procedures, under the National Oceanic and Atmospheric Administration (“NOAA”) Order No. 2166, 6.02.-c.2(d), require an EIS for: Federal plans, studies, or reports prepared by NOAA that could determine the nature of future major actions to be undertaken by NOAA or other federal agencies that would significantly affect the quality of the human environment. It is undisputed that the NMFS’s actions are subject to an EIS requirement, if those actions are a “major federal action significantly affecting the human environment.” Under 40 C.F.R. 1508.18(b)(2), an activity is a federal action if it “guides,” rather than binds, the use of federal resources. CVP water is a federal resource. The Bureau’s options were narrow had it declined to follow the NMFS’s reasonable and prudent alternatives. See Tribal Village of Akutan, 869 F.2d at 1193 (agency need not adopt reasonable and prudent alternatives in biological opinion, so long as it complied with ESA Section 7(a)(2) by taking “alternative, reasonably adequate steps to insure the continued existence of any endangered or threatened species”); Portland Audubon Society v. Endangered Species, 984 F.2d 1534, 1537 (9th Cir.1993) (discusses exemptions from ESA, by application to the Committee under 16 U.S.C. 1536(a)(2), (g)(l)(2)). The government submits Bennett v. Plenert, CV 93 6076, 1993 WL 669429 (D.Or.1993), as authority that biological opinions are not binding on federal agencies, and consequently are not major federal actions. But in Bennett, the court left open the issue that a biological opinion could constitute a major federal action under NEPA. Id. at p. 11, n. 4. Biological opinions are not binding on the Secretary, nor do they invariably require an EIS. The inquiry requires a case by case analysis. Taking the facts alleged in the plaintiffs’ complaints as true, the biological opinion is part of a systematic and connected set of agency decisions which result in the commitment of substantial federal resources for a statutory program, which resulted in reallocation of over 225,000 acre feet of CVP water under the ESA for salmon protection with the environmental impacts alleged. This is NEPA major federal action. Id. at 1420-22 (emphasis added) (parallel citations omitted). The biological opinion was found not binding on Reclamation, and the court instead applied 1508.18(b)(3) to find that NEPA applied to the BiOp because it was part of a “systematic and connected set of agency decisions which result in the commitment of substantial federal resources for a statutory program,” a provision that is inapplicable here. Id. at 1422. Here, to satisfy its obligations under NEPA, Reclamation initiated formal consultation and prepared a BA to describe the proposed action. FWS, as the consulting agency, reviewed the BA, disagreed with its conclusion, and issued the 2008 BiOp with an RPA. See BiOp i-vi. Reclamation was free to accept or reject, in whole or in part, FWS’s recommendations and advice prescribed in that RPA. The consultation regulations state that “the Federal [action] agency shall determine whether and in what manner to proceed with the action in light of its section 7 obligations and the Service’s biological opinion.” 50 C.F.R. 402.15(a). However, FWS could not issue the BiOp without also including an RPA to mitigate jeopardy. FWS proposed an RPA that called for actions that commit federal water to smelt protection. Reclamation was not “bound” to accept the proposed RPA, but it did so. Resulting operations reduced 2008-09 water deliveries by several hundred thousand acre-feet. In this case, actions speak louder than words. Plaintiffs argue that the FWS’s issuance of the 2008 BiOp requires that FWS prepare an EIS, because a BiOp has a “powerful coercive effect” on the action agency. Doc. 245-2 at 12. On the one hand, if Reclamation had disregarded the RPA, the 2008 BiOp would not have provided an exemption from the ESA’s take prohibitions, potentially subjecting the operators to civil and criminal liability. 16 U.S.C. 1538(a) (prohibiting the “take” of listed species); 1536(o)(2) (a taking in compliance with a biological opinion’s ITS “shall not be considered to be a prohibited taking of the species concerned”). However, Federal Defendants argue Reclamation’s departure from the RPA would not necessarily violate Section 7 of the ESA, if Reclamation took “alternative, reasonably adequate steps to insure the continued existence” of listed species. Tribal Village of Akutan, 869 F.2d at 1193. This is sophistry. Reclamation operated the joint Projects and managed federal resources (CVP water) in accordance with the RPA, resulting in a major revision of 2008-09 coordinated CVP operations and substantial reallocation of federal resources. The only reason Reclamation did so was to meet the mandate of the ESA and the BiOp. Both agencies participated to some degree in the agency action at issue here. Assuming, arguendo, NEPA applies, is it required that one of the agencies should have acted as “lead agency” in any effort to comply with NEPA’s requirements? Plaintiffs acknowledge that “to avoid duplication, applicable regulations allow agencies to share NEPA responsibility if more than one agency is involved in the same action or a group of related actions,” Doc. 245-2 at 25 (citing Sierra Club v. U.S. Army Corps of Engineers, 295 F.3d 1209, 1215 (11th Cir.2002); 40 C.F.R. 1501.5), arid that “when more than one federal agency has authority over an action, NEPA does not explicitly specify which agency is responsible for preparing an EIS,” id. (citing Sietra Club v. U.S. Army Corps of Engs., 701 F.2d 1011, 1041 (2d Cir.1983)). NEPA permits the relevant federal agencies to decide between themselves which will act as lead agency, subject to reasonable constraints. 40 C.F.R. 1501.5(c); Westlands, 850 F.Supp. at 1422; see also NRDC v. Callaway, 524 F.2d 79, 86 (2d Cir.1975). This is reasonable agency interpretation of law; it makes little sense to have two agencies prepare separate NEPA documents for the same agency action. If there is a disagreement among several agencies involved in a project as to which is the lead agency, the following factors “shall determine lead agency designation”: (1) Magnitude of agency’s involvement. (2) Project approval/disapproval authority. (3) Expertise concerning the action’s environmental effects. (4) Duration of agency’s involvement. (5) Sequence of agency’s involvement. 40 C.F.R. 1501.5(c). Plaintiffs maintain that application of these factors demonstrates that FWS is the appropriate lead agency, arguing: FWS is the agency that researched, drafted, and approved the 2008 BiOp and, thus, has the most involvement in the action. See AR 4-7; see also Bennett, 520 U.S. at 161, 178 [117 S.Ct. 1154] (a biological opinion is FWS’ s decision document). FWS has the sole approval authority over the 2008 BiOp, and its ITS and RPA, while other entities will be liable for incidental take of a listed species if they do not comply with it. AR 300-01. FWS has expertise in assessing the environmental effects of actions such as the instant action. FWS was involved throughout the development process of the BiOp and RPA, so FWS is the agency with authority to shape the 2008 BiOp and its recommendations. See AR 4-7. And finally, FWS was involved from the beginning of the 2008 BiOp development process and is the final decision-maker and sole issuing agency, making it the logical agency to develop useful environmental analysis before approval, rather than mere post hoc “review” of actions that are too late to be altered. See AR 4-7; Doc. 94, Findings of Fact, at p. 40, 30. Doc. 245-2 at 26-27 This argument assumes that the BiOp itself, rather than the operation of the Projects under the BiOp is the relevant action in need of NEPA evaluation. Federal Defendants and Defendant Intervenors maintain that this is not the appropriate focus for the “lead agency” inquiry. Rather, it is Reclamation’s planned coordinated operation of the Projects that creates the jeopardy found by the BiOp. This coincides with FWS’s Consultation Handbook, which indicates that FWS should “assist the action agency or applicant in integrating the formal consultation process into their overall environmental compliance” for a particular project. Consultation Handbook at 4-11 (emphasis added). The appropriate focus is “Project operations,” and Reclamation is the appropriate lead agency. Reclamation proposed the action (in the form of the Operations and Criteria Plan (“OCAP”)) to FWS, which triggered the preparation of the BiOp. Reclamation has the ongoing statutory authority to implement project operations as prescribed by the OCAP. See, e.g., AR at 10262 (BA at 1-1) (“The Bureau of Reclamation (Reclamation) and the California Department of Water Resources (DWR) propose to operate the Central Valley Project (CVP) and State Water Project (SWP) to divert, store, and convey CVP and SWP (Project) water consistent with applicable law and contractual obligations.”); AR at 10263-64 (BA at 1-2 — 1-3) (identifying certain laws authorizing Bureau operation of CVP); AR at 10270-71 (BA at 1-9 — 1-10) (Coordinated Operation Agreement (“COA”) and P.L. 99-546 impose a “Congressional mandate to Reclamation to operate the CVP in conjunction with the SWP FWS’s involvement with regard to future Project operations is limited, consisting primarily of its obligation to ensure that those operations do not impair protection and recovery of threatened and endangered species, an obligation that it shares with Reclamation. 16 U.S.C. 1536(a)(2).”). Reclamation has greater expertise concerning the alleged adverse environmental effects. The impacts identified by Plaintiffs allegedly occur as a result of reduced water deliveries under Reclamation’s water supply contracts. See, e.g., Doc. 292, San Luis First Amended Complaint (“SLFAC”) at 44 (“Water supply shortages resulting form [sic] the 2008 Biological Opinion ... threaten numerous adverse environmental effects including ... worsening of groundwater basin overdraft, land subsidence, decreased groundwater recharge, threatened violation of state-adopted basin plan water quality objectives, reductions in crop yields, reduced agricultural employment, endangerment of permanent crops, and decreased air quality.”). Reclamation routinely examines these and related impacts as the lead or co-lead agency on NEPA reviews of proposed CVP-SWP operations and frequently has the ability and authority to propose ways to mitigate these impacts. FWS has little to no expertise in or authority over many of these matters. In the final analysis, FWS was asked for its “opinion” whether Reclamation’s operations plans would jeopardize the smelt. FWS provided that opinion, as required by law. Reclamation was not “bound” by the BiOp until it chose to proceed with the OCAP and implement the RPA. Once Reclamation did so, operation of the Projects became the relevant agency “action,” and Reclamation, as action agency, is the more appropriate lead agency under NEPA. The adaptive management protocol prescribed in the RPA leaves FWS with the final word on exactly what flow requirements will be imposed. Reclamation accepted this arrangement as a constraint upon its operations when it provisionally accepted the RPA. FWS played a key role in formulation, planning, and implementation of the RPA, with full knowledge that no NEPA compliance had been undertaken. This is not a shell game in which the agencies may leave the public to guess which agency has taken major federal action. It is a close call whether FWS’s issuance of the BiOp and its RPA under these circumstances is major federal action under NEPA. This call need not be made, because Reclamation, the agency with the ultimate authority to implement the RPA, is now joined as a party, whose actions must be evaluated under NEPA. 2. A NEPA Claim Against Reclamation Has Been Pled and Is Ripe for Adjudication. On September 4, 2009, shortly after the opening briefs in this round of motions for summary judgment were due, the Authority and Westlands (“San Luis Parties”) amended its complaint to include NEPA claims against the Bureau. Doc. 292, San Luis First Amended Complaint (“SLFAC”). Specifically, the SLFAC alleges that Reclamation’s decision to provisionally accept and implement the 2008 BiOp is arbitrary, capricious, and contrary to law, because, among other things, “Reclamation did not ... perform! ] NEPA analysis of the impacts to the human environment from, or alternative actions to, the 2008 Biological Opinion.... ” SLFAC 114. The parties were offered an opportunity and did supplement their briefing to fully consider the amended complaint. See Docs. 336 (Order Re further NEPA briefing); 357 & 358 (Defendant Intervenors’ supplemental NEPA filings); 360 (Federal Defendants’ supplemental NEPA filing); 361 (Plaintiffs’ supplemental NEPA filing). Federal Defendants object to summary adjudication of any NEPA claim against Reclamation that has “neither been pled nor argued.” Doc. 360 at 5. The objection is overruled, because such a claim has been pled in the SLFAC. In addition, Federal Defendants addressed Reclamation’s liability under NEPA in their original briefs, see Docs. 290 at 21-23 (Federal Defendants’ Opposition) & 290-2 (Fujitani Declaration), at oral argument, and have been given further opportunity to supplement those briefs to fully address Reclamation’s role and actions. Federal Defendants also suggest that Reclamation should be permitted the opportunity to “assemble an administrative record” on the NEPA issue before it is adjudicated. Doc. 360 at 5. However, the parties previously agreed that NEPA claims against FWS related to the issuance of the BiOp could be adjudicated without reference to the administrative record. See Doc. 120 at 6-7. Federal Defendants fail to explain why NEPA claims against the Bureau related to implementation of the BiOp should be treated any differently. 3. Reclamation’s Provisional Acceptance and Implementation of the BiOp and its RPA Constitute Major Federal Action Because they Represent a Significant Change to the Operational Status Quo. Projects such as the CVP and SWP, constructed prior to the date on which NEPA became effective, January 1, 1970, are not retroactively subject to NEPA. See Upper Snake River Chapter of Trout Unlimited v. Hodel, 921 F.2d 232, 234 (9th Cir.1990). “However, if an ongoing project undergoes changes which themselves amount to major Federal actions, the operating agency must prepare an EIS.” Id. at 234-35 (citing Andrus v. Sierra Club, 442 U.S. 347, 363 n. 21, 99 S.Ct. 2335, 60 L.Ed.2d 943 (1979) (explaining that major federal actions include the “expansion or revision of ongoing programs”)). The critical inquiry is whether the BiOp causes a change to the operational status quo of an existing project. Upper Snake River, 921 F.2d at 235. Upper Snake River concerned Reclamation’s decision to reduce flows below Palisades Dam and Reservoir to below 1,000 cfs “[d]ue to lack of precipitation ... to increase water stored for irrigation.... ” 921 F.2d at 234. Although it had been standard operating procedure since 1956 to maintain flows below that dam above 1,000 cfs, during previous dry periods, the average flow had “been lower than 1,000 cfs for 555 days (or 4.75% of the total days in operation).” Id. at 233. Because the challenged flow fluctuations were within historic operational patterns, no NEPA compliance was required: The Federal defendants in this case had been operating the dam for upwards of ten years before the effective date of the Act. During that period, they have from time to time and depending on the river’s flow level, adjusted up or down the volume of water released from the Dam. What they did in prior years and what they were doing during the period under consideration were no more than the routine managerial actions regularly carried on from the outset without change. They are simply operating the facility in the manner intended. In short, they are doing nothing new, nor more extensive, nor other than that contemplated when the project was first operational. Its operation is and has been carried on and the consequences have been no different than those in years past. The plaintiffs point out that flow rates have been significantly below 1,000 cfs for periods of seven days or more only in water years 1977, 1982, and 1988, all years of major drought. They also note that prior to construction of the dam, the lowest recorded flow rate did not fall below 1400 cfs. From these facts, they argue that the Bureau’s reduction of the flow below 1,000 cfs is not a routine managerial action. However, a particular flow rate will vary over time as changing weather conditions dictate. In particular, low flows are the routine during drought years. What does not change is the Bureau’s monitoring and control of the flow rate to ensure that the most practicable conservation of water is achieved in the Minidoka Irrigation Project. Such activity by the Bureau is routine. Id. at 235-36 (emphasis added). Westlands specifically distinguished Upper Snake River, and reasoned that whether or not an EIS was required “will, of necessity, depend heavily upon the unique factual circumstances of each case.” 850 F.Supp. at 1415 (citing Westside Property Owners v. Schlesinger, 597 F.2d 1214, 1224 (9th Cir.1979)). To some extent, the finding is based on whether the proposed agency action and its environmental effects were within the contemplation of the original project when adopted or approved. See [Port of Astoria, Or. v. Hodel, 595 F.2d 467, 476 (9th Cir.1979) ]; Robinswood Community Club [v. Volpe ], 506 F.2d 1366 [ (9th Cir.1974) ]. The inquiry requires a determination of whether plaintiffs have complained of actions which may cause significant degradation of the human environment. [City and County of San Francisco v. United States, 615 F.2d 498, 500 (9th Cir.1980) ]. Westlands, 850 F.Supp. at 1415. In West-lands “the taking of water for non-agricultural purposes [was] alleged to have changed the operational requirements of the CVP, imposed new standards for reverse flows in the Western Delta, carryover storage in the Shasta reservoir, and caused closure of the Delta cross-channel. Such actions and the environmental effects alleged are not routine managerial changes.” Id. at 1421. Plaintiffs contend that the present circumstances are more like those in West-lands than in Upper Snake River. First, quoting page 280 of the BiOp, Plaintiffs argue that “the 2008 BiOp greatly ‘decreases] the amount of ... the projects’ export pumping plants operations prior to, and during, the critical [delta smelt] spawning period.” Doc. 245-2 at 20 (quoting BiOp 280). Plaintiffs’ partial quotation is not fully accurate, as the entire quoted sentence concerns effects to critical habitat, not pumping rates: “Overall, RPA Component 1 will increase the suitability of spawning habitat for delta smelt by decreasing the amount of Delta habitat affected by the projects’ export pumping plants’ operations prior to, and during, the critical spawning period.” Nevertheless, the RPA will be implemented by altering flow patterns, which will substantially reduce water availability for water service contractors. Plaintiffs argue that the various components of the RPA call for more restrictive OMR flows than under the status quo: RPA Component 1, Action 2 for January and February calls for much more restrictive OMR flows of -1,250 cfs to - 5,000 cfs rather than the -5,000 cfs permitted under D-1641. AR 22, 1867. As recognized by a DWR comment letter on the BiOp, this is a considerable change from the previous regimen because “to meet a -1,250 cfs OMR flow during June, the Project could cut pumping to zero and still not meet the OMR target.” AR 6995-96. In addition, the proposed take limits for adult delta smelt have been significantly lowered such that they would have been exceeded 19 out of 28 years of historic operations from 1981 to 2007. AR 1867. Doc. 245-2 at 20. This argument is predominantly based on information in the administrative record, despite the fact that administrative record has not yet been finalized and the scheduling conference order in this case specifically limits the “early resolution” claims to those that do not depend on the administrative record. Federal Defendants maintain that whether the RPA causes a change to the status quo is an issue of fact, requiring evaluation of all of the evidence in the record. The parties previously agreed that issues requiring review of the administrative record were not to be decided at this stage in the case. See Doc. 120 at 6-7. Federal Defendants present the Declaration of Paul Fujitani, Doc. 290-2, which includes a review of historic OMR flows and compares those flows to projected flows under the RPA. Based on Fujitani’s declaration, Federal Defendants argue: As the available historical data show ... average OMR flows in January have fluctuated from as high as -3,269 cfs (January 1998) to as low as -8,268 cfs (January 2003). Daily flows vary even more widely — for example, in January 1998, daily OMR flows ranged between 2,810 cfs and -9,530 cfs. See Ex. 1. The flows set forth in RPA Component 1, Action 2 are within these historic parameters. Similarly, the historical record shows average OMR flows in February have fluctuated from as high as 20,631 cfs (February 1997) to as low as -9,086 cfs (February 2003). The February flows set forth in RPA Component 1, Action 2 are also within these historic parameters. RPA Component 2 provides that under certain conditions, OMR flows should be maintained between -1,250 and -5,000 cfs from the date Component 1 is completed until June 30 (or until water temperatures at Clifton Court Forebay reach 25 degrees Celsius). The available historic data shows a wide range of OMR flows between January and July, and the flow ranges set forth in RPA Component 2 are within these historic parameters. See Ex. 1. Therefore, even after adopting the OMR flow restrictions, Reclamation continues to operate the CVP within existing law and the same overall flow parameters, as it has done for decades. Id. at 22-23. Plaintiffs respond with the declaration of Thomas Boardman, Doc. 297-2, who opines that, under certain scenarios, the RPA constrains export pumping in a manner that departs from the status quo ante: I reviewed historic data and considered how the 2008 BiOp might affect operations as compared to the preexisting criteria in D-1641. Based upon my review of those data, I found, in some circumstances, operating the CVP and SWP to meet pre-existing D-1641 criteria resulted in OMR flows more positive than - 1,250 cfs. If those circumstances occur, the new OMR criteria in the 2008 BiOp would not control. I also found, in some circumstances, operating the CVP and SWP to meet the pre-existing D-1641 criteria resulted in OMR flows within the range specified by FWS pursuant to the 2008 BiOp. If those circumstances are presented again, the 2008 BiOp may control CVP and SWP operations, depending upon where in the range FWS sets the OMR limit. In still other circumstances, however, I found the preexisting D-1641 criteria allowed OMR flows more negative than -5,000 cfs, the most negative flow rate allowed under the 2008 BiOp. If those circumstances occur, the new operating criteria in the 2008 BiOp will definitely control CVP and SWP operations. The changes in CVP and SWP operations necessary to meet the new operating criteria in the 2008 BiOp will reduce availability of the CVP and SWP to supply water. Id. at 9. Boardman also concluded that “[i]n 2009, limits on OMR flows imposed by FWS under the 2008 BiOp resulted in lower rates of CVP and SWP pumping than otherwise would have been allowed if only the preexisting criteria in D-1641 controlled.” Id. at 10. Boardman estimates “that as a result of the 2008 BiOp limits on OMR flows from mid February to the end of March and from mid May to the end of June, the Jones Pumping Plant was unable to pump approximately 390,000 acre-feet of water that it otherwise could have pumped and provided to water users south of the Delta, if only the preexisting criteria in D-1641 controlled.” Id. Fujitani’s and Boardman’s conclusions are not inconsistent. Fujitani concludes that average and daily OMR flows under the RPA fall within historic average and daily flow ranges. Boardman opines that, even though any given post-RPA average or daily OMR flow figure may fall within historic ranges, under certain circumstances, pre-RPA constraints would permit even more negative flows, resulting in even more export capability. Although Fujitani’s conclusion, that post-RPA operations fall within the range of historic operating conditions, may comply with the letter of Upper Snake River, the RPA’s operational changes violate the spirit and reasoning of Upper Snake River: This circuit has held that where a proposed federal action would not change the status quo, an EIS is not necessary. “An EIS need not discuss the environmental effects of mere continued operation of a facility.” Burbank Anti-Noise Group v. Goldschmidt, 623 F.2d 115, 116 (9th Cir.1980) (holding EIS unnecessary for federal financial assistance in purchasing an existing airport since federal action would not change status quo), cert. denied, 450 U.S. 965, 101 S.Ct. 1481, 67 L.Ed.2d 614 (1981); see also Committee for Auto Responsibility v. Solomon, 603 F.2d 992 (D.C.Cir.1979) (holding government lease of parking area to new parking management firm does not trigger EIS requirement since area already used for parking so no change in status quo). We find the reasoning of the district court in County of Trinity v. Andrus [438 F.Supp. 1368 (E.D.Cal.1977) ] particularly instructive. In Trinity the plaintiffs sought to enjoin the Bureau from lowering the level of a reservoir during the drought year of 1977 because of the potential damage to the fish population in the reservoir. The court explained that the issue was “not whether the actions are of sufficient magnitude to require the preparation of an EIS, but rather whether NEPA was intended to apply at all to the continuing operations of completed facilities.” Id. at 1388. The court distinguished the case from cases “when a project takes place in incremental stages of major proportions,” and from cases where “a revision or expansion of the original facilities is contemplated,” id. Neither of these situations applied here, the court observed. Instead, [t]he Bureau has neither enlarged its capacity to divert water from the Trinity River nor revised its procedures or standards for releases into the Trinity River and the drawdown of reservoirs. It is simply operating the Division within the range originally available pursuant to the authorizing statute, in response to changing environmental conditions. Id. at 1388-89. The court then concluded that actions taken in operating the system of dams and reservoirs (in particular, operational responses in a drought year) were not “major Federal actions” within the meaning of NEPA. The Federal defendants in this case had been operating the dam for upwards of ten years before the effective date of the Act. During that period, they have from time to time and depending on the river’s flow level, adjusted up or down the volume of water released from the Dam. What they did in prior years and what they were doing during the period under consideration were no more than the routine managerial actions regularly carried on from the outset without change. They are simply operating the facility in the manner intended. In short, they are doing nothing new, nor more extensive, nor other than that contemplated when the project was first operational. Its operation is and has been carried on and the consequences have been no different than those in years past. The plaintiffs point out that flow rates have been significantly below 1,000 cfs for periods of seven days or more only in water years 1977, 1982, and 1988, all years of major drought. They also note that prior to construction of the dam, the lowest recorded flow rate did not fall below 1400 cfs. From these facts, they argue that the Bureau’s reduction of the flow below 1,000 cfs is not a routine managerial action. However, a particular flow rate will vary over time as changing weather conditions dictate. In particular, low flows are the routine during drought years. What does not change is the Bureau’s monitoring and control of the flow rate to ensure that the most practicable conservation of water is achieved in the Minidoka Irrigation Project. Such activity by the Bureau is routine. 921 F.2d at 235-36 (emphasis added). Here, in contrast to the “routine” activities described in Upper Snake River and Trinity (cited in Upper Snake River), Reclamation’s decision to implement the RPA is a “revis[ion] [of] its procedures or standards” for operating the Jones pumping plant and other facilities significantly affecting OMR flows. This can be determined from the face of the BiOp and uncontroverted analyses of public data. Reclamation’s and FWS’s joint interest is pellucid: the Projects’ water delivery operations must be materially changed to restrict project water flows to protect the smelt. Reclamation’s implementation of the BiOp is major federal action because it substantially alters the status quo in the Projects’ operations. D. Significantly Affect the Human Environment If the “major federal action” component is satisfied, an agency must prepare an EIS “where there are substantial questions about whether a project may cause significant degradation of the human environment.” Native Ecosystems Council, 428 F.3d at 1239. Plaintiffs maintain that the 2008 BiOp satisfies this standard because it “reallocates hundreds of thousands of acre-feet of water annually-enough water to serve the needs of millions of people-from the current reasonable and beneficial municipal, industrial, agricultural, and other uses.” Doc. 245-2 at 22. In support of this and related assertions, Plaintiffs cite extensively to the AR. It has been agreed that this stage of the case will not rely on the AR, which was not finalized at the time the NEPA claims were presented. However, certain, dispositive conclusions can be made without looking to the AR. First, it is undisputed that implementation of the RPA reduced pumping by more than 300,000 AF in the 2008-09 water year. See Boardman Deck, Doc. 297-2 at 10. FWS admitted in its Answer to the State Water Contractors’ Complaint that such “reductions in exports from the Delta” may “place greater demands upon alternative sources of water, including groundwater.” Doc. 141 at 4, 16. The potential environmental impact of groundwater overdraft is beyond reasonable dispute. See, e.g., NRDC v. Kempthorne, 2008 WL 5054115, *27 (E.D.Cal. Nov. 19, 2008) (noting that the final EIS coveri