Citations

Full opinion text

HAWKINS, District Judge. These eases consolidated for trial and heard by this court during its term beginning November 16, 1981, in Georgetown, South Carolina, arose as a result of an accident which occurred at the South Island Ferry in Georgetown, South Carolina, on December 11, 1977. Charles Lonnie Faust, the decedent, Tommy Bennett and Curtis L. Muldrow had been fishing in the waters of Winyah Bay and were attempting to return to the landing from which they had launched their boat when they collided with the guide cable of the South Island Ferry. The collision caused the death of decedent Faust and personal injuries to Bennett and Muldrow. Following the collision the plaintiffs brought these actions against the South Carolina State Highway Department, now known as the South Carolina Department of Highways and Public Transportation, the owner and operator of the ferry, and the United States of America as joint tort feasors. The defendants answered denying liability and at the same time asserting cross-claims against each other for contribution and counterclaims against the estate of the owner and operator of the boat, Charles Lonnie Faust. Having heard the testimony, studied the exhibits, and having fully reviewed all the evidence, the court makes the following findings of fact and conclusions of law: I — FINDINGS OF FACT A. Background 1. Prior to 1900, as part of the construction of the Intracoastal Waterway in Georgetown County, the United States Corps of Engineers (hereinafter referred to as “Corps”) dug a canal from Winyah Bay to the Santee Delta. This canal, known as the Estherville-Minim Canal, runs generally in a north-south direction and separates South Island from the rest of Georgetown County. After construction of the canal, access from the mainland to South Island was afforded by the construction of a wooden bridge which has long since been destroyed. Thereafter, beginning approximately in 1920, access to South Island was available by ferry provided by Georgetown County, said ferry being located one (1) mile from the waters of Winyah Bay. 2. In 1940, the South Carolina General Assembly shifted the burden of and responsibility for the operation of the ferry from Georgetown County to the South Carolina Highway Department (hereinafter referred to as “Highway Department”) with the passage of a statute, now embodied in § 57-15-140 of the 1976 Code of Laws of South Carolina, as amended, which incorporated the ferry and its approaches into the South Carolina Highway System as a portion of State Highway No. 716. The statute further directed the Highway Department to maintain and operate the ferry. 3. The Intracoastal Waterway is a part of the navigable waters of the United States and is a highway for barge and pleasure boat traffic. Since its construction, the Corps has dredged and maintained the waterway which is approximately 300 feet wide. During its years of operation since 1940, the ferry operated at the South Island crossing has been a cable operated ferry. As an integral part of the cable operated ferry, there was a %" steel cable which was used as a guide cable to stabilize the ferry during crossings. 4. It appears that no known records are kept as to the number of boats that pass through this portion of the waterway during a given period of time; however, the majority of vessels are pleasure boats and tow vessels. Construction by Georgetown County of a boat landing adjacent to the ferry has resulted in a tremendous increase in traffic by local fishermen and other boaters in the area of the ferry within recent years. 5. From 1955 to 1975, approximately forty (40) accidents involving the ferry occurred. Most of the accidents were minor, and most involved pleasure boats colliding with the guide cable. For the years 1971 to 1975, the South Carolina Department of Marine and Wildlife Resources investigated seven accidents involving collisions between boats and the guide cable, and forwarded the United States Coast Guard (hereinafter referred to as “Coast Guard”) copies of their reports. The Coast Guard for that same period investigated five accidents (two of which were also investigated by the South Carolina Department of Marine and Wildlife Resources). 6. On October 9, 1974, John W. Fulton (hereinafter referred to as “Fulton”) was killed, after nearly being decapitated, when his boat struck the guide cable for the South Island Ferry. The only other passenger in the boat, Carol Feaga (hereinafter referred to as “Feaga”) was seriously injured. Fulton had been traveling from his home in Maryland south on the Intracoastal Waterway to Florida. 7. At the time of the October 1974 death of Fulton, the ferry warning system consisted of 4' X 6' signs upstream and downstream of the cable. The signs were on both sides of the channel and simply stated, “Caution-Ferry Crossing-.IO mile”. The signs failed to inform boaters of the dangers posed by the cable when the ferry was in operation. Five red flashing lights were on the ferry boat, and a siren could be sounded by the operator from the island side. Use of the siren was not available once the ferry commenced a trip. 8. On November 21, 1974, Coast Guard Commander M. J. Stewart, the Marine Safety Officer responsible for the South Carolina Zone wrote District Engineer Ca-toe (hereinafter referred to as “Catoe”), who was responsible for all maintenance, construction and engineering activities in his district of the Highway Department and advised him of his concern for the hazards represented by the cable ferry crossing at South Island. He stated that the cable was the primary hazard and recommended some temporary modifications until such time as the cable could be removed. Among his recommendations were that the guide cable be modified so that it could be lowered to the bottom of the water from both sides of the waterway; that four (4) additional signs be installed with legends clearly indicating the danger of the cable and that passage should not be attempted while the lights on the ferry were flashing; that these signs should be located five hundred (500) feet north and south from the present signs; and that the guide cable be installed in a lower position that would likely result, if it were struck by a boat, in damage to the vessel’s hull but less likelihood of injuries to individuals. He also recommended that the state should consider a self-propelled ferry or at least consider the use of a cable ferry without a guide cable and advised Catoe that ferries of this type were being operated by the State of Louisiana. He further suggested that Catoe contact officials in that state concerning the operation of such ferries. 9. On November 20, 1974, a letter of similar import had been sent by Commander Stewart to the Commander of the Seventh Coast Guard District in Miami, Florida, calling to his attention the dangers presented by the operation of the cable ferry and regarding changes similar to those made in his letter to Catoe. 10. On November 21, 1974, Catoe, by way of memorandum to the State Highway Engineer of the Highway Department, indicated that strobe lights were to be placed on both sides of the waterway to operate when the ferry was in operation and a switch was to be installed on the mainland side of the waterway to allow the guide cable to be lowered in case it was necessary due to an approaching boat. 11. On December 5, 1974, the State Highway Engineer by way of memo to Ca-toe approved, among other matters, the installation of the red strobe lights and the switch to allow the lowering of the guide cable from the mainland side of the waterway. Catoe was also instructed to comply with the terms of Commander Stewart’s letter dated November 20, 1974, and to also give consideration to the recommendations contained in Commander Stewart’s letter of November 21, 1974. 12. On October 9,1975, suit was filed in the United States District Court, District of South Carolina, Charleston Division, by the Administrator of the estate of John W. Fulton and by Carol Feaga individually against the United States of America and the South Carolina State Highway Department for damages occasioned by the wrongful death of Fulton and for the injuries sustained by Feaga. 13. On April 1, 1977, the Honorable Sol Blatt, Jr., U. S. District Judge, after concluding the trial of the Fulton and Feaga cases wrote a letter to Paul W. Cobb, Chief Highway Commissioner of the Highway Department and advised him that he felt that the South Island Ferry, even after the addition of safety features which had been installed after the Fulton death, still constituted a dangerous hazard that was likely to result in further death and injury unless a safer crossing method was instituted. He also stated that he thought the situation as it existed at the South Island Ferry crossing was the most dangerous hazard to navigation that could be imagined. 14. On April 6,1977, the Commander of the Seventh Coast Guard District located in Miami, Florida, wrote and advised the Marine Inspection Officer in Charleston, South Carolina, this being the same office previously commanded by Commander M. J. Stewart, that their office had been advised that the ferry was often carrying more passengers than permitted by law. In addition the letter advised the Marine Inspection Officer that the duties required of the ferry operator prevented him from keeping a proper lookout. The letter also pointed out that the additional signs requested by Commander Stewart in his letter to the Highway Department dated November 21, 1974, had not been installed. 15. On April 7, 1977, Paul W. Cobb, Chief Highway Commissioner, South Carolina State Highway Department, wrote a reply to Judge Sol Blatt, Jr.’s letter of April 1,1977, in which he stated that he felt that all feasible safety suggestions relative to the operation of the South Island Ferry had been implemented by his department. He further indicated that he felt that there were four (4) alternatives available to his department regarding the South Island Ferry. These alternatives were: (1) continue operation of the present ferry with the resulting liability that may be involved; (2) change the present ferry operation to a self-propelled type which would involve a substantial expenditure; (3) construct a bridge for which the Department had no funding or (4) discontinue the ferry operation. 16. On May 16,1977, the Coast Guard by letter advised Catoe that the operators of the ferry were required by law to maintain a proper lookout during the operation of the ferry and suggested that the ferry operators be furnished a flashlight so that they might be in a position to warn approaching vessels of the cable by being able to illuminate the same. 17. On August 17, 1977, the Corps concluded that it had responsibilities concerning the operation of the South Island Ferry and that the Corps possessed the authority to control the operation of a cable ferry in navigable waters. The circumstances causing the Corps to reach this conclusion began during the trial of the actions on behalf of Fulton and Feaga during the month of March, 1977. 18. On August 17,1977, the Acting District Engineer for the Corps based in Atlanta, Georgia, by memorandum advised the District Engineer of the Corps based in Charleston, South Carolina, that ferry cables were subject to regulation by the Corps, citing appropriate legal authorities. In addition the memorandum alluded to the fact that the cable had been found to be dangerous and a hazard to navigation by a Federal District Court and if voluntary removal could not be accomplished the District Office of the Corps in Charleston, South Carolina, was instructed to commence appropriate legal action consistent with the Federal Court ruling. 19. On September 8, 1977, Col. William W. Brown, District Engineer, Army Corps of Engineers, wrote the Highway Department setting forth the Corps’s concern regarding the safety of the South Island Ferry operation. The same letter also requested a meeting of representatives from the Highway Department, Coast Guard and South Carolina Wildlife and Marine Resources Department. The stated purpose of the meeting was for the formulation of a course of action to abate the hazard existing at the South Island Ferry. At this meeting on October 14, 1977, which was attended by representatives of all requested departments, it was stated by the Corps’s representative that the ferry was hazardous and that it was only a matter of time before the Corps would have to close it down. 20. On October 18, 1977, the Highway Department acknowledged by way of memorandum that the average number of vehicles per day using the South Island Ferry from October 1976 through September 1977 was 49.6. 21. On October 23, 1977, there was an accident involving the South Island Ferry cable which resulted in injuries to three (3) persons. 22. On October 28,1977, the Corps, citing the Rivers and Harbors Act of 1899 as its authority, by way of telegram, directed the Highway Department to minimize the number of ferry crossings by allowing crossings only for the compelling needs of the South Island residents and State, local and Federal authorities in the performance of their duties. 23. On November 3,1977, another meeting was held between representatives of the Corps, Highway Department, Coast Guard and other interested parties. The meeting ended with the parties agreeing to work towards the elimination of the cable used in the operation of the South Island Ferry. 24. On November 17,1977, the Highway Department sought approval from the Corps for a ferry schedule which would result in a twenty-five (25%) per cent reduction in the daily number of crossings. 25. On November 18, 1977, the Honorable Sol Blatt, Jr. issued his Order in Doyle v. United States, 441 F.Supp. 701, the cases determining the damages arising out of the death of Fulton and out of the injuries to Feaga. The Doyle decision found that the Corps and the Coast Guard were negligent and had abused their discretion in failing to warn boaters of the dangers that existed at the South Island Ferry and in failing to improve the safety of the ferry operation. The decision further held that their conduct was a proximate cause of the collision between Fulton’s boat and the ferry cable which resulted in his death and the injuries to Feaga. 26. On November 22, 1977, the Corps by letter advised the Highway Department that the proposed reduced schedule of ferry crossings was unacceptable. Furthermore, the letter stated that the ferry was to be used as little as possible and to serve the needs of South Island residents only. (Emphasis in original). The Highway Department was also directed to furnish plans by December 2, 1977, to the Corps for the complete removal of the cable ferry. Also, on December 2, 1977, an approved minimal operation schedule was to be in effect. 27. On December 1, 1977, the Highway Department by letter to the Corps confirmed the extension deadline for plans to be formulated for a permanent solution to the South Island Ferry problem from December 2, 1977 to December 5, 1977. The letter further stated that plans were contemplated for a permanent solution and the Highway Department contemplated the taking of prompt action in regards to a permanent solution. 28. On December 1, 1977, the Highway Department advised the Corps by letter to District Engineer Col. William W. Brown that flagmen would be posted in boats upstream and downstream during the hours of operation of the South Island Ferry. The Highway Department stated these boats would be equipped with flashing lights and electronic public address systems to be used to warn traffic that the ferry was in operation. 29. On December 9, 1977, the Corps by letter of Col. William W. Brown, District Engineer, to the Highway Department, confirmed and approved the schedule of operation as previously submitted by the Highway Department and the use and posting of flagmen as outlined in the Highway Department’s letter of December 1, 1977. This same letter went on to reiterate the serious concern of the Corps concerning the matter and urged the Highway Department to secure an early removal of the cable. 30. On December 11, 1977, Charles Lonnie Faust (hereinafter referred to as “Faust”) was killed when he was struck by the South Island Ferry cable when passing the ferry in his motorboat. On that same date, two passengers in the boat, Tommy Bennett (hereinafter referred to as “Bennett”) and Curtis L. Muldrow (hereinafter referred to as “Muldrow”) sustained personal injuries as a result of the collision. 31. On December 12,1977, the day after Faust was killed, the Highway Department’s District Engineer was authorized to hire flagmen to operate the advance warning flag boats at the South Island Ferry. 32. Subsequent to December 11, 1977, Highway Department personnel began corresponding with representatives of an engineering firm in connection with the design of a self-propelled ferry. Specifications for the self-propelled ferry were completed in January of 1978 and a bid was let for the construction of the ferry in February of 1978. The self-propelled ferry was put into operation at South Island in April of 1978 at a cost of approximately $100,000. The total cost of the self-propelled motorized ferry was paid for by the Highway Department out of funds that were on hand prior to December 11, 1977. All of the matters relating to the self-propelled ferry were accomplished by the Highway Department in less than five (5) months after the death of Faust. B. The Ferry And Its Approaches on December 11, 1977 33. The cable ferry in use on December 11,1977 was operated identically to and was the same ferry, subject to certain modifications, that was in service on October 9, 1974, the date Fulton was killed when his craft struck the ferry cable. 34. The ferry was capable of transporting two (2) automobiles across the waterway. The water, over which the ferry moved, was subject to the ebb and flow of the tide. The ferry, as it had been for many years prior to 1974, was stabilized by a %" steel guide cable which was permanently attached to both sides of the waterway. The ferry was manned by only one (1) operator, and when a crossing was necessary, the operator activated an engine located on the “hill” or high ground on the South Island side of the waterway. The activation of the engine, which was located directly behind the ferry mooring, caused the guide cable to become taut and rise to a horizontal position up to four (4) feet above the water across the entire width of the waterway. The ferry was fifty (50) feet long, twenty (20) feet wide and weighed some twenty (20) tons. It was propelled by the use of a cable propulsion system which employed an eight horsepower engine to activate a double drum, which in turn pulled the ferry back and forth across the waterway. When the ferry was not in use, its regular station was on the South Island side of the waterway. The operator’s cabin was a wooden structure located in the center and off to the righthand side of the ferry as one viewed it from the mainland side of the waterway. This cabin contained, among other things, a manual throttle for activating the engine. Because of this it was necessary for the operator to remain inside the cabin at all times during the crossing of the waterway. As the ferry moved from the South Island side to the mainland side of the waterway and from the mainland side to the South Island side of the waterway, the %" steel cable used to stabilize the ferry remained taut and up to four (4) feet across the entire width of the waterway. This cable also remained in the exact same position across the entire width of the waterway at all times while the ferry was moored on the mainland side for the purpose of loading and unloading vehicles. Only upon the return of the ferry to its mooring on the South Island side of the waterway could the guide cable be lowered below the water to allow safe passage of boats. The guide cable, because of constant exposure to salt water and other elements, was a muddy brown color. It was not capable of being seen at night. Although it would appear to an approaching boater that there was ample water behind the ferry for a vessel to proceed when the ferry was docked on the mainland side, passage was not possible due to the fact that the guide cable was taut and stretched across the entire width of the waterway. On a typical trip the guide cable was taut up to four (4) feet above the waterway for a period of time of approximately eight (8) to fifteen (15) minutes. 35. The ferry made approximately thirty (30) crossings per day. A crossing consisted of the time necessary for the operator to activate the engine, to load the vehicles if necessary on the South Island side of the waterway, to cross the waterway, unload the vehicles on the mainland side, and return to South Island. The average crossing time from start to finish lasted from eight (8) to fifteen (15) minutes meaning that the waterway was subject to being completely blocked for up to 7.5 hours per day. 36. The markings and warning systems present at the ferry site on December 11, 1977 had changed somewhat since the Fulton death in 1974. The changes were made piecemeal by the various agencies involved and were often made only after there had been an accident between a vessel and the cable. The so-called advance warning system on December 11, 1977, consisted of four (4) signs which were in actuality twelve (12) signs placed in groups of three (3) per pole in four separate locations. The poles upon which these signs were attached were located on both sides of the waterway with two (2) of them being five hundred (500) feet north of the ferry and two (2) of them being five hundred (500) feet south of the ferry. The signs and the messages contained therein were identical at all four (4) locations; however, the coloring of the signs, the lettering of the signs and the size of the lettering on the signs varied. The sign at the top portion of the poles was a 5 m.p.h. speed sign which was approximately 3' X 4'. The legend was white letters and numbers on a red background. Located beneath the speed sign was a sign approximately 5' X 12' which contained on the top portion the word “CAUTION”. The color was black letters on a red background. Located below the word “CAUTION” was a message “CABLE OPERATED FERRY 500-FEET AHEAD”. This portion of the sign consisted of black letters on a white background. Located just below as part of the same sign was a further message which read “STOP ON RED”. This lettering was black on a red background. In addition, there was a smaller sign approximately 2' X 9' located beneath the 5' X 12' sign which read “CABLE ABOVE WATER WHEN FERRY IN OPERATION”. This sign consisted of black lettering on a white background. Each of the four (4) sign locations were designed so that they were perpendicular to the waterway and the front portion was lighted by two spotlights which remained in operation after dark. In addition, all four (4) sign locations had two (2) red flashing wig-wag lights which were caused to be operational when the ferry was in operation. The two (2) sign locations on the South Island side of the waterway, both North and South of the ferry crossing, had, in addition to the signs and lighting described above, two (2) sirens on the top of the 5' X 12' sign which were activated during the time that the ferry was in operation. In addition, the two (2) sign locations on the South Island side of the waterway each had a red strobe light located adjacent to the sirens on the 5' X 12' sign. The strobe lights were also activated when the ferry was in operation. The ferry itself had mounted on it five (5) revolving red lights similar to those used on police and fire vehicles. In addition, there was one (1) red strobe light located atop the 16' mast which was located on the ferry and there was one (1) battery operated siren aboard the ferry. These lights were activated while the ferry was in operation. The siren was activated manually by the operator during such time as he was located inside the operator’s cabin. In addition, there were various reflective signs placed about the side of the ferry. The cable itself was marked by stop signs which have been described as “trailing stop signs”. This device consisted of two standard-size South Carolina Highway Department stop signs which were mounted in a wooden frame and located atop the guide cable just behind the ferry itself. The stop signs were not lighted in any manner and were not visible to persons using the waterway in the nighttime. The only difference in the markings on the ferry from 1974 until December 11, 1977, was the “trailing stop signs” and the fluorescent striped signs placed on the side of the vessel with the legend, “Cable Ferry-Stop on Red”. The operator was not furnished any equipment such as a flashlight or other devices with which to illuminate the cable at night. The operator because of the various duties required of him during crossings was unable to leave the cabin portion of the ferry and the siren located on the ferry was only capable of manual activation. Once the ferry reached the mainland side of the waterway and the operator was in the process of loading and unloading vehicles the siren was inoperative. The ferry landing areas, both on the island side and on the mainland side, were illuminated during periods of darkness with vapor mercury street lamps, such as are found in cities, designed primarily to assist in the loading and unloading of the ferry. These vapor arc lamps, the lights on the ferry, and the advance warning lights, are visible to a boater from the time he enters the Intracoastal Waterway from Winyah Bay. 37. Regardless of the various changes made at the ferry after the year 1974, the ferry remained a serious threat to life and property and continued to be the cause of numerous accidents on the waterway. The various signs located five hundred (500) feet North and South of the ferry crossing were confusing and misleading and failed to meet all of the guidelines for signs recognized and approved by the Highway Department and other persons with expertise in this area, including Coast Guard personnel. The signs were positioned in the waterway in such a manner that once the boater passed the signs it was impossible to read the message contained on the signs. In addition, the recognized engineering principle of one (1) sign to one (1) location was violated in that three (3) signs were placed in one (1) location. The signs did very little to apprise a boater unfamiliar with the area of the danger located at the crossing area. The danger itself, the steel cable stretched across the waterway, was insufficiently marked and in no way lighted and both the markings, consisting of the “trailing stop signs” and the cable itself were not capable of being seen in the nighttime. In addition and more importantly, the revolving lights and the strobe light on the ferry itself served to attract a boater’s attention to the ferry and away from the advance warning signs and the cable. The messages contained at the advance warning sites, when grouped together as they were, five hundred (500) feet North and South of the ferry crossing, were misleading and confusing. The top sign indicated that the boater should travel 5 m.p.h. The middle sign indicated to the boater that there was a cable ferry operated ahead and that he should stop his boat on red but did not indicate where he should stop. The bottom sign indicated that there was a cable across the waterway when the ferry was in operation. This sign failed to tell the boater that when the ferry was on the mainland side and in the process of loading or unloading vehicles that it was still in operation although it was no longer traversing the waterway. It would appear to a boater in the nighttime after his attention had been attracted to the ferry by its flashing lights that a ferry located hard on the bank on the mainland side in the process of loading or un1 loading vehicles was no longer in operation and that the cable alluded to in the signs was no longer across the waterway. The various colors used on the three (3) signs at each of the four (4) sign locations and the messages contained on the signs competed against one another for a boater’s attention. In addition, the black lettering on the red background on the middle sign was not capable of being seen as easily as other portions of the sign by a boater in the nighttime. Although it is undisputed that the cable was a hazard and a danger to a boater using the waterway, none of the signs at any of the locations used the word “danger” when the use of such a word would have given a boater a clearer indication as to what existed in the waterway just five hundred (500) feet from the sign. It is an accepted principle in the posting of signs that the greater the danger the greater the responsibility to mark the danger. There was nothing in the South Island area that would allow a boater at night, who was unfamiliar with the area, to visibly or otherwise ascertain the existence of a steel cable stretched across the waterway, inasmuch as the cable was in no way marked so as to be visible in the nighttime. C. Accident And Injuries 38. The deceased, Faust, and two of his friends, Bennett and Muldrow left Florence, South Carolina, during the morning part of December 11, 1977, for the purpose of fishing in Winyah Bay located near Georgetown, South Carolina. The three (3) men arrived in the City of Georgetown just before noon and after purchasing bait and getting directions to a landing they launched their craft, which was an eighteen (18) foot West-Bend inboard/outboard motorboat owned by Faust, shortly after noon. The boat was launched from a public boat landing located in the City of Georgetown. All of the men were unfamiliar with the Winyah Bay area. Faust and Bennett had been in the area once before; however, their fishing on that occasion was done from an abandoned bridge. None of the men had ever done any boating in salt water. Shortly after leaving the landing the men came upon a disabled boat occupied by Henry H. Hendricks (hereinafter referred to as “Hendricks”), a resident of the Georgetown area. There was a conversation concerning the trouble with his boat and then a later conversation concerning fishing conditions in the area. After a short period of time Hendricks agreed to join the men in their boat and to take them to an area where they might be able to catch some fish. The men then traveled to an area near Debordieu Beach and fished during the afternoon. After completing the fishing they then went to an area to gather oysters and then went back to crab pots owned by Hendricks and removed some crabs. As darkness approached they headed back to the area where Hendricks had left his boat and thereafter Faust towed the Hendricks boat to an area known as Campbell’s Landing. Since darkness was fast approaching and the boaters were unfamiliar with the area they asked Hendricks for directions back to the landing. The men did not specify which landing they were seeking and inasmuch as the South Island landing was a popular public boat landing and since they had initially come from that direction, Hendricks incorrectly assumed that they had put in from South Island landing. He gave them directions back to South Island landing which was located in an area near Campbell’s Landing. 39. Shortly after leaving Campbell’s Landing, at approximately 6:10 P.M., the boat being piloted by Faust, exited from Winyah Bay as per the instructions of Hendricks and headed South down the Intracoastal Waterway, more particularly, the Estherville-Minim Creek Canal. It was in this canal that the South Island Ferry was located. Once reaching the Intracoastal Waterway the boat was driven by Faust at a speed between 15 and 25 m.p.h. Faust was positioned such that he was sitting on his feet with his head above the windshield. Immediately to his side was Bennett who was standing so that his head was also above the windshield. Muldrow was seated facing backwards in a seat located just behind Faust. The boat traveled in the middle of the waterway as it approached the area in which the cable ferry was located. As the Faust boat approached the cable ferry, the ferry was hard on the mainland side and the operator was in the process of unloading an automobile at the time of the accident. The guide cable was taut and spanned the complete width of the canal which was approximately three hundred (300) feet. The lights were in operation on the ferry itself and the sign locations five hundred (500) feet North and South of the cable crossing were illuminated. The sirens at the sign locations were activated; however, they were incapable of being heard from a boat traveling at the speed the Faust boat was traveling. The siren on the ferry, which was previously sounded by the operator during the crossing, was no longer operational since the ferry had completed the crossing and the operator had exited the operator’s cabin and was removing a chain to allow an automobile to leave the ferry. Although the operator ran from his position on the mainland to the ferry cabin in order to manually sound the siren located on the ferry, the testimony is that the sounding of the siren and the collision itself were simultaneous. The tide at the time was rising and would have been high at approximately 9:30 P.M. The weather was cold and it was dark and clear at the time of the collision. Regardless of the speed of the Faust boat, and the testimony concerning the speed varying from 15 m.p.h. to 25 m.p.h., the occupants of the boat would only have had a matter of seconds within which to read, interpret, comprehend, and obey the messages located on the advance sign locations. After passing the sign locations, the collision with the cable would have occurred within a matter of seconds. 39. The passenger, Muldrow, seated facing the rear of the boat, did not see any of the advanced signs nor did he see the ferry nor hear any sirens until the time of the collision. The passenger, Bennett, saw what he describes as a blur of light which occurred just prior to the collision. The speed of the boat did not vary nor did the boat veer from its course down the center of the waterway from the time it entered the waterway until the time it struck the cable. There is no evidence that Faust ever saw the cable stretched taut across the waterway behind the ferry. 40. At the time of the impact the bow of the boat passed under the cable which would have been an approximate height of four (4) feet. The cable struck the windshield of the boat and Bennett, who had been standing next to Faust, was thrown from the boat. Faust was hurled backwards and down onto the bottom of the boat suffering severe neck and head injuries resulting in his immediate death. Muldrow was thrown about in the boat. 41. Faust endured no pain and suffering prior to death. At the time of his death on December 11, 1977, Faust was forty (40) years of age and had an additional 34.05 years of life expectancy and a work-life expectancy of 23.05 years. He was survived by four (4) dependents, his wife, age 37 at the time of his death, and three minor children, ages 5V2, 8V2 and IIV2 at the time of his death. Faust enjoyed a loving family relationship with his wife and children. He was graduated from Voorhees College, South Carolina State College and received additional training from Denmark Technical Education Center, Florence-Darlington Technical Education Center and Francis Marion College. At the time of his death he held a Master’s degree in the field of teaching and had been employed by the Florence Public School District One as a teacher for a number of years. At the trial of this matter the plaintiff, Faust, and the defendant, United States of America, both presented economic experts as to the financial losses incurred as a result of the death of Faust. Both experts testified from a series of charts, graphs and work figures that they had compiled and these were received by the Court and have been examined in detail. Both of the experts confined their testimony and findings to the loss of financial contributions and home services resulting from the death of Faust. I find that the approach and figures used by the plaintiff’s expert witness, namely, Dr. Oliver G. Wood, Jr., is a more practical approach to the problem and adopt his findings as to the economic loss suffered by the Faust family. The Court would note that the discount rate and the method of computing the present value of the total financial loss used by Dr. Oliver G. Wood, Jr. has been used and accepted by the United States District Courts. Doyle v. United States, 441 F.Supp. 701 (D.S.C.1977). Faust, who was age 40 at the time of his death, had an additional work-life expectancy of 23.05 years. Dr. Oliver G. Wood, Jr., Ph.D., an actuarial expert, has opined that the before trial loss in gross earnings which includes the period from the date of the death until the trial is $64,404. Upon reducing his earning capacity to adjust for his contribution to the retirement system, taxes and personal consumption, the before trial loss in net earnings is $34,-752. The opinion of the expert was that the present value of the after-trial loss and net earning capacity, as well as retirement income, is $194,360. This figure includes adjustment for retirement contributions, taxes and personal consumption. Furthermore, Faust spent a minimum of ten (10) hours per week providing numerous domestic services for his family, including but not limited to: caring for the lawn, upkeep on the house, repairing and maintaining the family automobile and home appliances, providing transportation for the children, and financial management for family affairs. Valuing these services at the federal minimum wage rate plus the employer Social Security payments in the after-trial period results in a pre-trial loss in family services amounting to $6,091. Similarly, the computation for the after-trial loss of family services computed to $52,-643. The total before and after-trial loss by virtue of loss of earning capacity and family services reduced to their present value as computed from the figures set forth above totals $287,846. In addition, Faust’s combined funeral expenses representing an out-of-pocket expense to the Faust family totals $2,481.00, bringing the total economic loss to $290,327. Faust was a devoted and loving father and husband. He returned to his home promptly after completion of his workday at the high school and upon reaching home spent his time with his wife and in particular the three young children in the home. The wife and children were included on weekend activities which, among other things, consisted of visits to various family members located within the state. He was active in his church with his family and served in a number of capacities dealing with church work. He also conducted family devotions in the home which among other things consisted of a frequent reading from the Bible. He assisted his children with their homework, played games with them, took them on family picnics and outings, took them fishing and counseled with them concerning their everyday problems. A majority of his non-working time was spent with his wife and children and a great deal of that time was spent nurturing, training, educating and guiding his three (3) young children. As a result of his wrongful death, they have been deprived of these services. I am of the opinion that the children are entitled to recover for this loss. In evaluating these services, they do not lend themselves to mathematical exactness. It is, however, my opinion that One Thousand Five Hundred and NO/100 ($1,500.00) Dollars per year per child until each child reaches age twenty-five (25) should be recovered for each surviving child for this loss. This item, calculated for all three (3) children, is Fifty-Eight Thousand Seven Hundred Forty-Two and NO/lOO ($58,-742.00) Dollars. During the entire course of the marriage Faust provided his wife and children with love and affection, and in addition, provided care, attention, companionship, comfort and protection for them. The deprivation of these “society” benefits by his wrongful death has resulted in a grave loss to her and the three (3) children. Faust and his wife were a close and loving couple and the marriage had never been subject to any periods of separation and at the present time Mrs. Faust is unmarried and has been so since the date of her husband’s death. In my opinion each child is entitled to an award which I find to be Thirty Thousand and NO/100 ($30,000.00) Dollars per child for a total of Ninety Thousand and NO/100 ($90,000.00) Dollars for the three (3) children, for this loss of companionship; and I am of the opinion that the widow, Alean Hester Faust, is entitled to an award of Sixty Thousand and NO/100 ($60,000.00) Dollars for such loss. Therefore, plaintiff is entitled to recover, both on her behalf as widow and on behalf of her children, the sum of One Hundred Fifty Thousand and NO/100 ($150,000.00) Dollars. 42. At and prior to the collision between the Faust boat and the taut cable, the plaintiff Curtis L. Muldrow was seated in the rear of the boat facing aft behind the driver. On impact Muldrow was rendered unconscious. After the boat passed under the cable and began circling in the waterway, Muldrow regained consciousness, staggered to the front of the boat and turned the throttle off. Some boatsmen in another boat came alongside and carried him to the landing on the mainland side where he stayed in the cab of a truck to keep warm until the ambulance arrived in about a half hour. He and his injured companion, Thomas Bennett, were transported by ambulance to the Georgetown Memorial Hospital for treatment of their injuries. Later that evening, following x-rays, Muldrow was released and returned to his home in Florence. On December 12, 1977, he awoke in pain and was examined by his physician, S. A. Greenberg, M.D., who diagnosed his injuries as a cerebral concussion, multiple contusions of the head and shoulders, cervical and thoracic sprain, a subconjunctival hemorrhage of the right eye, depressive reaction, with post-concussion syndrome. The following day he was admitted to the Florence General Hospital for x-rays, physiotherapy and treatment and released on December 19, 1977. He continued under Dr. Green-berg’s care on follow-up visits for headaches and pain and distress in the cervical and lower back until March 30, 1978. Due to persistent headaches he was referred for neurological evaluation of the post-traumatic headaches to Dr. S. C. Soni, M.D., at the Medical University of South Carolina Hospital, Charleston, South Carolina, on April 5, 1978, and received a negative neurological report. On May 3, 1978, due to persistent headaches and pain in the cervical area of his spinal column, he was examined and xrayed by an orthopedic specialist, A. Cecil Bozard, M.D., Florence, South Carolina, which disclosed a displaced fracture of the tip of the spinous process of the second cervical vertebra. A home traction device was prescribed, along with a Jackson pillow to support the weight of his head and neck during sleep. He was seen on follow-up visits and discharged on May 11, 1978, as being incapable of returning to work, and having the potentiality of permanent cervical disc injury. A lumbar corset or support was prescribed for his lower back distress. On August 28, 1980, he was evaluated orthopedically by Edward E. Kimbrough, M.D. of the Moore Clinic, in Columbia, South Carolina. X-rays revealed an old displaced avulsion fracture of the tip of the spinous process of C-2 vertebra and a spondylolysis of the 5th lumbar vertebra. Due to continued symptoms of neck pain and some low back pain, Muldrow was rated at having a 20% permanent impairment of the cervical spine and a 10% impairment of the lumbar spine as a result of injuries sustained in the accident. On November 13,1981, Muldrow was given an up-to-date orthopedic evaluation by Harry C. Taylor, M.D., Georgetown, South Carolina, who rated Muldrow as having sustained a 20% permanent disability of the cervical spine and a 25% permanent disability of the lumbar sacral spine, in view of current symptoms despite the lapse of time. At the time of the accident Muldrow was 26 years old, was working as a debit insurance agent with Interstate Life Insurance Company, Florence, South Carolina, and earning $1,200 a month, base pay plus commission. He was unable to return to work until January, 1978; however, upon his return he could not perform his debit work which required driving a car and getting in and out of the vehicle. He continued his work in the office with no loss of pay, until he resigned in March, 1978, because of his inability to do the work due to headaches and dizziness; thereafter, he sought relief from his physician. Prior to entering the life insurance business, Muldrow was a mechanic by trade. He attempted to return to work as an automobile mechanic, but could not do so on account of his injuries. Since November of 1978 he has been working parttime as a mechanic and truck driver making $400 a month. In addition, he is unable to resume his previously enjoyed athletic activities. His medical expenses, exclusive of his hospitalization in the Florence Memorial Hospital, the amount of which no evidence was presented, amounted to $340. Muldrow sustained painful injuries in the accident consisting of a cerebral concussion, multiple bruises and contusions, cervical and thoracic sprains, conjunctival hemorrhage of the right eye, a fracture of the spinous process of C-2 vertebra, a severe lumbo sacral sprain and right sciatic neuritis. The cervical and lumbar symptoms have persisted and he has sustained a 20% permanent partial disability of the cervical spine and a 25% permanent partial disability of the lumbo sacral spine, which has affected his ability to perform heavy work or the usual duties of an automobile mechanic such as lifting, working under motor vehicles, or other physical motions, as he was able to do prior to the accident without difficulty. I find that he is entitled to be properly compensated for his pain, suffering, damages and permanent partial disability, before and after trial, and taking into consideration future pain and suffering and discomfort, and reducing that amount to its present cash value by use of a discount rate of five (5%) percent, which this court feels is reasonable and fair, in the sum of Eighteen Thousand and NO/100 ($18,000.00) Dollars. 43. At and prior to the collision between the motorboat and the taut cable, the plaintiff Thomas Bennett, age 34, was standing in the front of the boat behind the windshield facing forward and to the left of the driver. On impact the windshield was shattered and Bennett was struck in the chest by the cable and was thrown overboard. Some boatsmen in another boat rescued him when he came to the surface and he was carried to the landing on the mainland side of the waterway, where he stayed in the cab of a truck to keep warm until an ambulance arrived in about a half hour. He and his companion, Curtis L. Muldrow, were transported by ambulance to the Georgetown Memorial Hospital for treatment of their injuries. Later that evening following x-rays, Bennett was released and returned to his home in Florence, South Carolina. On December 12,1977, he awoke in great pain and was examined by his physician, R. L. Skinner, Jr., M.D., who diagnosed his injuries as contusions of the anterior chest wall and a costocondral separation of his chest or rib cage below his neck. He was prescribed drugs for pain and was unable to return to work until January 15, 1978, due to his injuries. At the time of the accident he was performing heavy work, which required the use of his arms, shoulders and back and strain on his chest and rib cage at the Electro-Motive Plant in Florence, where he grossed $500 a month on the day shift. At the time of the accident he was also working and performing heavy labor at the La-Z-Boy Chair plant in Florence, where he grossed $500 a month on the night shift. He continued under the care of Dr. Skinner until January 11, 1978, when he was discharged without any disabling symptoms. His medical expenses for treatment at Georgetown Memorial Hospital, $77.00, x-rays at McLeod Memorial Hospital, $41.00, amounted to $170.00. On November 13, 1981, Bennett was examined by Harry C. Taylor, M.D., Georgetown, South Carolina, at which current examination Dr. Taylor found that he had fully recovered from his injuries with no disability or permanent impairment. Bennett sustained a painful injury of his separated rib cage, which temporarily disabled him for a period of five weeks from engaging in his customary or normal activities and performing his job and loss of wages for that period of time. I find that he is entitled to be properly compensated for his pain, suffering, damages and temporary total disability in the sum of Five Thousand and NO/100 ($5,000.00) Dollars as a result of the accident. D. Responsibility and Fault 44. During its years of operation, the South Island Ferry has been subject to statutes, rules, regulations and guidelines set forth by the United States of America and the State of South Carolina. These have been implemented by various agencies of the United States of America and the State of South Carolina. The degree of involvement by these two entities has varied from time to time but since the year 1974 both have become active in their involvement with the South Island Ferry and in particular with the safety aspects surrounding the operation of the ferry. • Both entities have had full knowledge of the many accidents involved at the ferry crossing site and all were particularly aware of the 1974 accident which resulted in the death of Fulton. Both the Highway Department and the United States of America were sued in the United States Federal District Court concerning the Fulton death. The Highway Department has been actively engaged in the operation of the South Island Ferry since the incorporation of that ferry site into the South Carolina Highway system in the year 1940. The Highway Department during the years 1971 to 1975 investigated at least seven accidents involving collisions between boat and the cable and forwarded copies of their reports to the Coast Guard, an agency of the United States of America. The Highway Department by letter of November 21,1974, shortly after the Fulton death, was put on notice of the Coast Guard’s concern for the hazards presented by the cable and were advised that the cable should be modified so as to be lowered from both sides of the waterway and that four (4) additional signs with legends clearly indicating the danger of the cable should be erected. Neither of these directives were complied with by the Highway Department nor was there any effort as requested by the Coast Guard to lower the guide cable’s position above the waterway so as to cause less likelihood of injuries to individuals. At the completion of the trial of the case involving the death of Fulton, the Chief Highway Commissioner received a letter dated April 1,1977, from the Honorable Sol Blatt, Jr., trier of the facts in the matter involving the death of Fulton, who advised that even after the additional safety features had been added the ferry crossing constituted a dangerous hazard and was likely to result in further death and injury. In replying to this letter, the Chief Highway Commissioner set forth' a number of alternatives available to the Highway Department and among those was the decision to “continue operation of the present ferry, with the resulting liability that might be involved.” After the Corps decided that it had an area of responsibility in this matter the Highway Department was advised on October 14, 1977, that corrective measures had to be taken or the Corps would close the ferry down. Again nothing was done by the Highway Department until an additional accident took place on October 23, 1977. Five (5) days after that accident the Highway Department was advised to minimize its crossings as directed by a telegram of the Corps forwarded to the Chief Highway Commissioner. Nothing was done to comply with this directive by the Highway Department. Although the Highway Department indicated during the latter part of the year 1977- that warning boats would be placed in the area with public address systems to be used to warn approaching boaters of the danger, nothing was done in this regard prior to December 11,1977. There were some changes made by the Highway Department to add extra signs concerning the presence and danger of the ferry crossing and there were some additional sirens and flashing lights added at the signs posted five hundred (500) feet North and South of the cable crossing and while these may have been some improvements lessening the dangers existing at the site, they were obviously insufficient. The signs as they existed on December 11,1977, were confusing and misleading. The signs did not comply with the five (5) elements recognized by engineers in this field necessary to adequately mark a hazard or danger. These elements were recognized as the controlling elements in this area by the expert witness offered at trial by the Coast Guard. In addition, these elements are set forth in the South Carolina Highway Department manual used by their engineers for the designing, placement and erection of signs within the State of South Carolina. The signs were insufficient to meet the required need due to the danger that existed and incorrectly attracted the attention away from the real hazard, the cable stretched across the waterway. The signs were not simple in their meanings and were not designed to gain the respect of the reader. In addition, the signs were placed so that a boater did not have adequate time within which to respond to the message printed on the signs. In addition, the messages on the signs were misleading and confusing and incapable of being adequately seen due to improper lettering, coloring and markings. Even though the Highway Department knew and had been advised on numerous occasions by the Corps and the Coast Guard that the cable itself was the hazard, they failed to properly mark the cable and their failure to do so, combined with their failure to properly mark the area, clearly shows a callous disregard for human life. The continuing failure of the Highway Department to remove the cable after approximately forty (40) accidents involving the ferry and individuals between the year 1965 and 1975, including the death of Fulton in 1974, shows a clear indication of its failure to take sufficient steps to remove what was described by the Honorable Sol Blatt, Jr. as “the most dangerous hazard to navigation that can be imagined.” The Highway Department could have merely lowered the cable as directed by the Coast Guard which would have probably prevented the death of Faust and the injuries to Bennett and Muldrow. Similarly, had they put into operation the use of the boats with the public address warning systems as they stated they had done to the Corps, the likelihood of Faust’s death and the injuries to Bennett and Muldrow would have been substantially diminished. The Highway Department in its efforts to mark the site in lieu of marking the hazard itself, i.e. the cable, only added confusion to the matter. The lights as they were placed at the sign locations and atop the ferry competed with one another for attention and the lights on the ferry drew a boater’s attention to that vessel and away from the warning signs and the hazard itself, the cable. The number and placement of the lights resulted in what has been described as a “maze” of lights. The Highway Department on a number of occasions was directed by the Corps to revise the operational hours of the ferry and to put a limitation on the use of the ferry. The Corps first directed on October 28,1977, that the operation of the ferry was to be restricted to the compelling needs of the South Island residents and those county, state and federal government personnel whose presence on the island was necessary for the performance of their duties. This directive was not heeded by the Highway Department. On November 22, 1977, the Corps directed the Highway Department to schedule minimal operation of the ferry to serve the needs of the South Island residents only. This was not done by the Highway Department. Either of these restrictive uses of the ferry would have resulted in the waterway being blocked for shorter periods of time. At the time of the death of Faust and the injuries to Bennett and Muldrow, the ferry was being used by anyone who presented himself to the operator and, in fact, there were non-residents on the island at the time of the collision who had been hunting on the island and who were waiting to return to the mainland side. The Highway Department had full knowledge of the danger that existed and it appears that it had adequate funding and know-how to solve the problem. This is evidenced by the fact that a self-propelled non-cable ferry was designed, built, and put into operation within five (5) months after the initial inquiry about such a craft was made by the Highway Department during the latter part of December, 1977. It is also of importance that the money used to fund the self-propelled ferry was available and on hand during the budget year of 1977 and a special appropriation was not necessary in order to fund this change. The failure of the Highway Department to have implemented any plans prior to the death of Faust and injuries to Bennett and Muldrow for removing the cable and the continued failure of the Highway Department to follow directives issued to it by the United States of America concerning the safety of the cable crossing and the ultimate removal of the cable was negligence and contributed to the proximate cause of the death of Faust and the injuries to Bennett and Muldrow. 45. Although the United States of America had nothing to do with the ownership or maintenance of the ferry itself, this entity was certainly charged by law with various responsibilities and duties concerning the cable ferry inasmuch as it operated in the navigable waterways of the United States of America. It is evident by their actions and conduct that the United States of America knew of the ferry’s existence and of the hazards to navigation that it presented. 46. The Coast Guard personnel used the ferry on a regular basis. Coast Guard personnel as early as 1974 had corresponded with the Highway Department and directed that various safety measures be taken concerning the ferry and were specific in what action was to be taken. The recommendations, however, of the Coast Guard were clearly insufficient to mark the hazard that existed and nothing was done by the Coast Guard to follow up on the 1974 directives to establish whether or not these matters had been complied with by the Highway Department. Even internal memorandums from the Commander of the Seventh Coast Guard District to the local office located in Charleston concerning the implementation of directives to the Highway Department set forth as early as 1974 were ignored by the Coast Guard. Although the Coast Guard was aware as early as 1974 that the only solution to this problem was a complete removal of the cable itself, the ferry was continuously allowed to be operated without proper marking of the cable hazard. Even though the Coast Guard received numerous accident reports concerning t