Citations
- 234 Cal. App. 4th 123
Full opinion text
Opinion
WILLHITE, J.
Defendant Southern California Edison Company (Edison) appeals from a judgment following a jury trial in which the jury found in favor of plaintiff Simona Wilson on her claims for intentional infliction of emotional distress (IIED), negligence, and nuisance, and awarded her $1,050,000 in compensatory damages and $3 million in punitive damages. All of her claims are based upon her allegation that Edison failed to properly supervise, secure, operate, maintain, or control the electrical substation next door to plaintiff’s house (the Topaz substation), allowing uncontrolled stray electrical currents to enter the home. Stray current (or stray voltage) is the unavoidable byproduct of grounding an electrical system.
The gas company found stray voltage on Wilson’s gas meter the year after she moved into the house, and again two years later. Edison paid for certain measures taken by the gas company, which virtually eliminated the voltage on the meter. After Wilson remodeled her master bathroom (four years after she moved into the house), she began to feel low levels of electricity in her shower because the shower had metal pipes and the drain was connected to the ground, which allowed the stray electricity to flow when someone touched the shower while in contact with the drain. Edison offered to replace all or a portion of the metal pipes with plastic, which would eliminate the voltage in her shower, but Wilson refused the offer and insisted that Edison eliminate all stray voltage on her property. She subsequently filed the instant lawsuit.
Edison contends that Wilson’s claims fall under the exclusive jurisdiction of the Public Utilities Commission (the commission or PUC), that no substantial evidence supports her claims, that the damages award is excessive, and that punitive damages were unjustified. We conclude that the PUC has not exercised its authority to adopt a policy regarding the issues in this lawsuit, and therefore it does not have exclusive jurisdiction over Wilson’s claims. But we also conclude that Wilson failed to present sufficient evidence to support her IIED and negligence claims, or to support an award of punitive damages. Finally, we conclude the verdict on the nuisance claim cannot stand because the trial court refused to give Edison’s proffered instruction regarding causation of Wilson’s physical symptoms, and therefore the jury relied upon irrelevant evidence when determining that claim. Accordingly, we reverse the judgment, order judgment entered in favor of Edison on the IIED and negligence claims, and remand to the trial court for a retrial on the nuisance claim.
BACKGROUND
A. Fundamentals of Electrical Distribution Systems and Electricity
Analysis of the facts and issues in this case requires a basic understanding of electricity and electrical distribution systems.
Electricity is produced at a generating plant. Because it is not economical to send electricity over long distances at low voltages, the electricity produced at the plant is stepped up through transformers to a very high voltage before it is sent out over transmission lines. A substation, such as Edison’s Topaz substation at issue in this case, receives the high voltage electricity from the generating plant and steps it down through transformers to 4,000 volts. It then sends the electricity over distribution lines out to the neighborhood power poles, where an additional transformer steps down the voltage to 240/120 volts before delivering the electricity to homes or businesses.
In order for electricity to flow, there must be a complete circuit. In other words, when electricity is sent out from a transformer to a “load” (i.e., something that is using electricity, such as a light or appliance), it must have a return path. Typically, electricity is sent over one conductor (wire), called the “hot,” and returns on another conductor called the “neutral.” The flow of electricity is referred to as “current” and is measured in amperes (or amps); voltage is the pressure that drives the current. The amount of current depends in part upon the amount of resistance in the circuit; e.g., a 100-watt lightbulb has less resistance than a 60-watt lightbulb, so there will be a larger current flowing through it (and therefore the bulb bums brighter).
For safety reasons, electrical systems usually are grounded. That means that at various points in the system, including at the substation, a connection is made from the neutral to the ground, i.e., the earth. Because the earth is conductive, it can provide a return path for the flow of electricity. Therefore, if, for example, an energized wire fell to the ground from the distribution lines, the earth would provide a path for the current to return to the substation, where a protective device would break the circuit. But the conductivity of the earth also can present a danger to someone who touches a source of electricity. If that person is in physical contact with the earth, electricity will flow from the electrical source, through his or her body, to the earth and on to the distribution system or substation, thus completing the circuit. The amount of current will depend on the resistance of the person’s body, the amount of contact area, and the amount of voltage present.
In a grounded electrical system, there will always be some current flowing back to the substation through the earth. This is referred to as neutral-to-earth voltage, or “NEV,” and it cannot be entirely eliminated. NEV is one cause of “stray voltage,” which is voltage of 10 volts or less appearing on objects that are not part of an electrical system, that can be simultaneously contacted by members of the general public. Metal objects, such as water pipes or gas lines, that are buried in or connected to the earth will conduct electricity, so if a person in a home touched a water pipe that was energized due to NEV while also touching the earth or another conductor at a different voltage, a circuit would be completed and current would run through that person’s body. This “touch potential” can be eliminated by replacing metal pipes with plastic pipes or installing isolators (such as a short section of plastic pipe) to stop the flow of electricity onto metal fixtures, or by connecting (or “bonding”) the two conductors to equalize the voltage between the two.
The physiological effects of current flowing through a person’s body depends upon the amount of the current. According to a leading reference, a woman who encounters a current of 0.3 milliamps (mA) would not feel anything. At 0.7mA, she would feel a slight tingling; that typically is the perception threshold. At 1.2mA, she would feel a shock, but it would not be painful and muscular control would not be lost. She would feel a painful shock at 6mA, but she would still have muscular control. The let-go threshold is at 10.5mA, and at 15mA, she would feel a severe shock, have muscular contractions, and her breathing could be difficult. Administration of currents on patients often is used by physicians to determine whether they have nerve damage; they typically administer currents of 20 to 50mA, and can administer up to 120mA
B. History of the Property
The house at issue in this case is located at 904 Knob Hill Drive in Redondo Beach, next door to Edison’s Topaz substation. Edison owned the house until 1999.
1. 1995 to 1997
In 1995, Edison rented the house to the Pantucci family. Before renting the house to the Pantuccis, a corporate real estate agent from Edison asked Edison’s facilities manager to take a look at the electrical system because a previous tenant had complained that she got a shock in the kitchen from the sink or refrigerator.
Edison hired an electrical contractor, Precision Electric, to go through the electrical panels and the house to make sure everything was in order. Precision Electric took voltage readings by the sink to the ground, and found no voltage. The contractor replaced a ground clamp and went through the entire house, but did not find any electrical problems. The contractor was called back to the house after another Edison agent touched the dishwasher door while standing in water (the dishwasher had leaked) and felt a shock. When Precision Electric checked the dishwasher, the water was gone, and there was no voltage between the dishwasher and a tack strip on the floor. The contractor told Edison the shock could have been caused by the power feed to the dishwasher being in water when the dishwasher leaked.
Soon after the Pantuccis moved into the house, they began to experience shocks in the bathtub, at the washing machine, in a kiddie pool in the backyard, and at other places around the house. The shocks were mild, and no one was hurt. The Pantuccis complained to Edison a couple of times, and Edison sent people several times to try to fix the problem, but it never got fixed.
In April 1997, Edison’s lease administrator, Tina Drebushenko (now Van Breukelen) e-mailed several Edison employees regarding some calls she recently received from Ms. Pantucci about shocks she received when touching faucets. Ms. Pantucci also told her that the family no longer used the bathtub. Drebushenko reported that “[t]his problem was supposed to have been corrected some time ago, but the tenants report that it never really was . . . they just put up with it and stopped calling.” She said that Ms. Pantucci told her that the shocks were getting stronger, so Precision Electric was sent to the house. The electrician who went there detected some stray voltage, and also believed there was faulty wiring somewhere in the electrical system. Precision Electric asked for an Edison troubleshooting team to meet it at the house the following week “to rule out any substation problems.” When Ms. Pantucci called the next day to report that the problem had gotten worse after Precision Electric left, Drebushenko contacted Precision Electric and the troubleshooting team to have them meet at the house that same day.
In her e-mail to her colleagues, Drebushenko emphasized that Edison needed to “get this matter resolved once and for all or determine if it can[’]t be solved.” She stated that she had submitted the property to be released for sale, but that Edison might want it as a buffer. She said that if Edison could sell the property, it would first have to fix the problem, but if the problem cannot be fixed, Edison should consider demolishing the structure.
The Pantuccis moved out a few months later, in September or October of 1997.
2. 1998
In January 1998, Mark Raidy was preparing the house for possible sale. He met with several Edison employees at the house to try to determine the source of the shocks and find a solution to fix the problem. They opened the main circuit breaker (i.e., shut off power to the house) and took readings. They found two amps flowing in file service drop (i.e., wire) from the backyard pole to the house. They took readings on the water pipe into the house and out to the sprinklers in the backyard, and found no current. They agreed that the other likely path for the current was the sewer pipe, and determined they should replace the sewer pipe with plastic. Once the sewer pipe was replaced, they would meet again, and have a troubleman there to perform a test.
They also found stray voltage inside the house. They took a reading, and found over five volts from the damp carpet/tack strip between the kitchen and dining area and the ground on a kitchen outlet. They agreed to do more troubleshooting at their next meeting. In an e-mail to the meeting participants, Raidy told them: “If we can solve these problems and feel comfortable that they won’t recur, we will proceed to market the home. If constant maintenance is needed to prevent the re-occurrence of the problem, we should probably retain the property so we can control the maintenance. If we can’t solve the problem, we should not allow the property to be inhabited.”
Sometime later, Edison found there was a problem on a distribution pole up the street from the house. When the problem was fixed, the stray voltage at the house stopped.
In June 1998, Raidy made a site visit at the house with Edison’s sales and leasing manager, Charles Kraushaar. Raidy told Kraushaar about the reports by prior tenants of shocks at the property. He said that Edison had determined that the source of the shocks was a faulty transformer on a distribution pole up the street; the transformer was replaced, which eliminated the problem. Kraushaar touched the faucet and showerheads that previously had produced shocks to verify there were no more shocks. Kraushaar had no concern about stray voltage at the site, and authorized the release of the property for sale.
3. 1999 to 2008
Edison sold the house to the Ozerans in 1999. Edison did not receive any reports of shocks at the house for the next five years. In 2004, the Ozerans complained to Edison that the tenants of the house were getting shocked in the laundry room in the garage, in the yard at the hose bibs, and in one of the bathrooms. Edison employee Matthew Norwalk was asked to investigate as part of a team that included people from Edison’s substation, field engineering, and power quality departments. Norwalk performed voltage measurements, and found voltages ranging from 11 to 15 volts inside and outside the house. The team investigated the design and integrity of all connections on the distribution system, wiring within the home, and connections and design of the substation, and performed modeling of substation grounding.
Thousands of hours were spent by members of the team and others, trying to determine the source of the problem. They deenergized and inspected each circuit at Topaz to see if there were issues with any of the circuits. Ultimately, they found and replaced some corroded connectors, and determined after a ground study that the grounding of the system could be improved. They concluded, based on modeling, that the voltage around the substation could be equalized to bring down the difference in voltage between the house’s ground and the water lines on the property by adding a common neutral.
The common neutral plan was implemented in February 2005. Afterwards, the Edison team performed voltage measurements at the house, and found the voltage had dropped to approximately 3.5 volts (without a resistor). Using a 1,000-ohm resistor to replicate the internal resistance of a human body, the Edison team determined that a voltage of 3.5 volts would not produce any harmful level of current (the level of current would be approximately 3.5mA). Norwalk spoke with the tenants of the house, and they were satisfied with the results. Edison received no more complaints of shocks or stray voltage until 2008.
C. Events Leading Up to Present Lawsuit
Wilson bought the property in March 2007 and moved in with her husband, Ryan Fisher, and son. She asked the previous owner whether there were any safety hazards in the home with respect to the substation next door, and was told there had been no problems. Neither she nor Fisher was aware of any voltage problem with the house until August 2008.
1. Voltage on the Gas Meter
When Fisher came home from work on August 22, 2008, he found tags from the gas company saying that it had found a dangerous condition; there was electricity (measured at 7 volts) detected at the gas meter. The tags indicated that the gas had been turned off, and Fisher was advised to call the electric company.
In response to Fisher’s call, Norwalk came to the house and took a voltage measurement on the gas pipe entering the property. He measured 1.8 volts without a resistor. Norwalk told the gas company that the source of the voltage appeared to be NEV, and that Edison would investigate to see if it could be further reduced. Edison tested the effect of removing the common neutral, and discovered that the voltage on the meter went down when they disconnected it but the voltage from the hose bib to the ground went up to 8 volts, so they restored the common neutral. Generally, when the source of voltage at a gas meter is NEV, the gas company will accept that voltage level. To verify that the source of the voltage was NEV, Edison placed a device on the gas meter to record the voltage to see if the voltage trended the load on the substation. Upon learning that Edison was monitoring the voltage, the gas company restored service to the house. Edison ultimately determined that the voltage changed in direct relationship to the loading of the substation, which confirmed that the source of the voltage was NEV.
The gas company notified Wilson again in April 2010 that it had detected electricity on the gas meter, although it did not turn off the gas at that time. The gas company also found voltage on the gas lines of other homes and facilities in the area. Representatives from the gas company had several meetings with representatives from Edison to try to find a way to address the problem. Ultimately, it was determined that the best way to eliminate voltages on the gas lines and meters was to install isolators on the gas service lines to the customers’ homes. Edison paid several thousand dollars for the installation of isolators, which was completed in 2012 and reduced the voltage on the gas meters to less than one volt.
2. Voltage in the Shower
In the meantime, in March 2011, Wilson remodeled her master bathroom. The construction was done to code by Wilson’s father, who was a contractor. As part of the remodel, Wilson replaced an elevated bathtub with a shower that had a metal drain in the concrete on the floor, so it had contact with the earth. After the remodel, Wilson began feeling a “tingling sensation” while she was showering, but she thought it was a pinched nerve. On the evening of April 19, Wilson told her boyfriend, Jason Stelle, that she was “feeling some kind of tingling” while showering. Stelle got in the shower to adjust the showerhead and “started feeling a tingling sensation as well.” After touching the showerhead a few more times, he realized that the sensation was not from his body, but was from the fixture. He touched it numerous times that evening and the next day to confirm there was a sensation before calling an electrician.
Wilson’s father and the electrician came to the house on April 20 and took voltage readings. They found voltage on the pipe leading to the showerhead. They started looking for the cause, eventually turning off all the power to the house, and found there still was voltage. The electrician and Stelle called Edison.
An Edison field technician came to the house a few days later and took voltage readings in the shower and other areas of the house. The technician told Stelle that there had been a history of problems with the house, and that there was not much he could do other than check to make sure it was not something that could be immediately fixed. He did not explain what the problems were. Another Edison representative came by later that day and did a similar walk-through and took voltage readings.
About a week later, Norwalk came to the house and met with Stelle. At Stelle’s request, Norwalk took voltage measurements at the master shower and at the gas meter. The voltage at the shower was 2.2 volts with a 500 ohm resistor and 2.4 volts without the resistor; the readings at the gas meter were 0.5 volts with the resistor and 1.7 without. Norwalk tried to explain the cause of the voltage; as Stelle understood Norwalk’s explanation, the substation was causing a voltage potential across the property that was within Edison’s standards, and Edison did not have plans to do anything about it. Stelle asked Norwalk to come back to the house on May 6 to meet with Wilson and explain it to her.
On May 6, Norwalk and two other Edison representatives (including Bill Stone, a claims representative) met at the house with Wilson, Stelle, Wilson’s father, and her electrician. Norwalk measured the voltage on the shower, and showed the group that it measured 2.4 volts without the resistor and 2.2 volts with the resistor. They then went to the gas meter, where Wilson’s electrician said he had measured 11 volts. The electrician had not used a resistor when taking that measurement. Using the electrician’s meter, with the probes exactly where he placed them, Norwalk added a resistor to see what the true value was. The voltage was reduced to nearly zero. Norwalk next took voltage readings in the hallway bathroom that was used by the children. He measured from the drain grate in the bathtub to the shower controls. Although he found some voltage without the resistor, the voltage bled to zero when the resistor was added.
The group returned to the kitchen, where Norwalk showed Wilson the data from the voltage monitor that had been placed on her gas meter. He showed her that the voltage was lower in the morning and higher at night, in direct relationship to the substation, and explained the same is probably true in her shower. He estimated that the voltage in the shower in the evening would be around 3 volts. He noted there was missing data from December 2010 to April 2011 because the data card on the monitor had filled up, but explained that the voltages recorded before the monitor stopped recording were almost exactly the same as those recorded after the data card was replaced.
What happened next is in dispute.
According to Wilson, Norwalk advised her to shower during offpeak hours when the stray voltage was lower and to modify her house to make it less conductive. He did not make any specific recommendations as to how to modify the house, nor did he offer to have Edison do any work on her house during that meeting. During her discussions with the group, Wilson told the Edison representatives that she wanted the stray voltage completely eliminated. When she tried to explain some symptoms she was having in her hands, Stone, the claims representative, turned toward her and yelled, “It’s just your nerves.” The meeting ended when Wilson asked for a copy of the simulation study on the stray voltage that Norwalk had told Stelle about during his prior meeting and copies of work orders showing what work had been done on the property before she bought it; Stone told her she needed to request those documents in writing.
According to Norwalk, he explained to Wilson at the meeting that the voltage in the shower could be mitigated through bonding, or by replacing a portion of the copper plumbing in the shower with a short piece of plastic piping. He told her that she could have her contractor perform the work, if that made her more comfortable, and she could submit the bill to Edison. Wilson told him that she did not want to expose her family to any more dust from construction. She became upset that Edison could not remove the voltage by doing something within the substation, and the meeting ended.
Wilson moved out of the house in September 2011, after an inspector she hired told her she should get out. The inspector was a building biologist whose expertise was in electromagnetic fields. She sold the home in January 2013.
3. Wilson’s Symptoms
After Wilson started feeling the electricity in the shower, she started throwing up all the time, and her body felt extremely weak. She started to have muscle fatigue and muscle spasms, and her hands were shaky. She could not hold a cup of coffee or type, and had constant numbness, pain, and tingling in her hands and feet. She had episodes in which her hands and feet turned red and were warm to the touch.
She went to a neurologist, Dr. Rederich, in May 2011. Dr. Rederich performed some simple tests on her, and diagnosed her with nerve damage. He prescribed pain medication, and told her the nerves would regenerate over time. When her symptoms got worse, Wilson returned to Dr. Rederich. He told her that he thought she might be developing secondary erythromelalgia, a rare condition for which there was no cure, and referred her to a specialist, Dr. Beydoun. Dr. Beydoun concluded she did not have secondary erythromelalgia or nerve damage, but he could not rule out the possibility that she had primary erythromelalgia, which is an inherited condition.
D. The Present Lawsuit
On September 11, 2011, Wilson, on her own behalf and as guardian ad litem for her children, filed a complaint for damages against Edison, the Boekers (who sold the house to her), and the Boekers’ real estate agents. We need not discuss in detail the proceedings below. Suffice to say that the case was tried before a jury on Wilson’s claims for TIED, negligence, and nuisance as alleged in the first amended complaint. All of those claims alleged, in essence, stray voltage generated by the Topaz substation entered into Wilson’s home, causing shocks to Wilson, and that Edison knew of the stray voltage from the substation, but failed to properly operate, maintain, or control the substation, and failed to maintain the safety of the residents living next to the substation. Wilson contended at trial that any level of stray voltage on the property was unacceptable, and Edison was liable for failing to eliminate it.
After an eight-day trial, the jury found in favor of Wilson on all three claims. The jury awarded Wilson $375,000 in past noneconomic damages and $175,000 in future noneconomic damages on her IIED and negligence claims, and $500,000 on her nuisance claim, and found Edison liable for punitive damages. Following a punitive damages phase, the jury awarded Wilson $3 million in punitive damages.
The trial court entered judgment, and Edison timely filed motions for judgment notwithstanding the verdict and a new trial. In the motion for judgment notwithstanding the verdict, Edison argued for the first time that all of Wilson’s claims were barred by Public Utilities Code section 1759. The trial court denied both motions, by minute order and by a signed order. Edison timely filed notices of appeal following entry of each order.
DISCUSSION
Edison contends that Wilson’s claims fall under the exclusive jurisdiction of the PUC, that no substantial evidence supports her claims, that the damages award is excessive, and that punitive damages were unjustified. We find that the PUC does not have exclusive jurisdiction over Wilson’s claims, but we agree there was insufficient evidence to support her IIED and negligence claims and that the punitive damages award was unjustified. Although we reject Edison’s contention that there was insufficient evidence to support the nuisance claim, we find the jury may have relied upon irrelevant evidence in considering that claim, and therefore the nuisance claim must be retried.
A. Exclusive Jurisdiction of the PUC
Section 1759, subdivision (a) provides: “No court of this state, except the Supreme Court and the court of appeal, to the extent specified in this article, shall have jurisdiction to review, reverse, correct, or annul any order or decision of the commission or to suspend or delay the execution or operation thereof, or to enjoin, restrain, or interfere with the commission in the performance of its official duties, as provided by law and the rules of court.” On appeal, Edison argues that Wilson’s claims are barred under section 1759 by the PUC’s exclusive jurisdiction over the design, siting, operation, and safety of Edison’s electrical distribution system. Wilson contends Edison waived this issue by failing to plead it as an affirmative defense in the answer or raise it by demurrer, and that, in any event, section 1759 does not apply in this case. We conclude that the issue is one of subject matter jurisdiction that cannot be waived, but that section 1759 does not bar the trial court from litigating Wilson’s claims.
1. Whether Section 1759 Applies Is an Issue of Subject Matter Jurisdiction That Cannot Be Waived
As noted, Edison did not argue that all of Wilson’s claims were barred by the PUC’s exclusive jurisdiction until it filed its posttrial motion for judgment notwithstanding the verdict. Wilson contends that Edison cannot raise exclusive jurisdiction on appeal because “[ejxclusivity is an affirmative defense . . . [that] must be pied in the defendant’s Answer — or it is waived.” (Citing Doney v. Tambouratgis (1979) 23 Cal.3d 91 [151 Cal.Rptr. 347, 587 P.2d 1160] (Doney).) Her reliance upon Doney is misplaced.
Doney, supra, 23 Cal.3d 91, and all but one of the other cases Wilson relies upon involve the exclusive remedy provision of the Workers’ Compensation Act (Lab. Code, § 3600 et seq.). That act provides, in relevant part, that “[w]here the conditions of compensation set forth in Section 3600 concur, the right to recover compensation is . . . the sole and exclusive remedy of the employee or his or her dependents against the employer” (Lab. Code, § 3602, subd. (a)), and that “[i]n all cases where the conditions of compensation set forth in Section 3600 do not concur, the liability of the employer shall be the same as if this division had not been enacted” (Lab. Code, § 3602, subd. (c)). The legal theory supporting this exclusive remedy provision “is a presumed ‘compensation bargain,’ pursuant to which the employer assumes liability for industrial personal injury or death without regard to fault in exchange for limitations on the amount of that liability. The employee is afforded relatively swift and certain payment of benefits to cure or relieve the effects of industrial injury without having to prove fault but, in exchange, gives up the wider range of damages potentially available in tort.” (Shoemaker v. Myers (1990) 52 Cal.3d 1, 16 [276 Cal.Rptr. 303, 801 P.2d 1054].)
As the Supreme Court explained in Doney, “a defendant in a civil action who claims to be one of that class of persons protected from an action at law by the provisions of the Workers’ Compensation Act bears the burden of pleading and proving, as an affirmative defense to the action, the existence of the conditions of compensation set forth in the statute which are necessary to its application. [Citations.] ‘The employee is pursuing a common law remedy which existed before the enactment of the statute and which continues to exist in cases not covered by the statute. It is incumbent upon the employer to prove that the Workmen’s Compensation Act is a bar to the employee’s ordinary remedy.’ [Citation.]” (Doney, supra, 23 Cal.3d at pp. 96-97, fn. omitted.)
The Supreme Court observed that finding a defendant waived the protection of the exclusive remedy provision by failing to raise it as an affirmative defense does not “result]] in the improper ‘conferral’ of subject matter jurisdiction by means of consent, waiver, or estoppel [citations] . . . [because] plaintiff was ‘pursuing a common law remedy which existed before the enactment of the statute and which continues to exist in cases not covered by the statute.’ [Citation.] The trial court clearly had subject matter jurisdiction over such an action unless and until it was properly demonstrated that the case was one ‘covered by the statute’ due to the presence therein of the conditions of compensation set forth in section 3600 of the Labor Code. . . . When, as in this case, no such demonstration has been made . . . , the court properly proceeds to exercise its existing jurisdiction to enforce the common law remedy.” (Doney, supra, 23 Cal.3d at pp. 98-99.)
In contrast to the workers’ compensation exclusive remedy provision, which is designed to protect the employer from tort liability that otherwise could be imposed in the absence of the workers’ compensation law, section 1759 is designed to protect the PUC’s constitutional and statutory authority to regulate utilities. As the Supreme Court explained in San Diego Gas & Electric Co. v. Superior Court (1996) 13 Cal.4th 893 [55 Cal.Rptr.2d 724, 920 P.2d 669] (Covalt), “ ‘[t]he commission is a state agency of constitutional origin with far-reaching duties, functions and powers. (Cal. Const., art. XII, §§ 1-6.) The Constitution confers broad authority on the commission to regulate utilities, including the power to fix rates, establish rules, hold various types of hearings, award reparation, and establish its own procedures. (Id., §§ 2, 4, 6.)” (Covalt, supra, 13 Cal.4th at pp. 914-915.) The Constitution also gives the Legislature plenary power to confer additional authority and jurisdiction upon the commission, which the Legislature did by enacting the Public Utilities Act (§ 201 et seq.). (Covalt, supra, 13 Cal.4th at p. 915.) “That law vests the commission with broad authority to ‘supervise and regulate every public utility in the State’ (§ 701) and grants the commission numerous specific powers for the purpose,” and “further authorized the commission to ‘do all things, whether specifically designated in [the Public Utilities Act] or in addition thereto, which are necessary and convenient’ in the exercise of its jurisdiction over public utilities. [Citation.]” (Covalt, supra, 13 Cal.4th at p. 915.)
In addition to the authority granted directly to the commission by the Constitution, “[t]he Constitution also confers plenary power on the Legislature to ‘establish the manner and scope of review of commission action in a court of record’ (Cal. Const., art. XII, § 5). Pursuant to this constitutional provision the Legislature enacted article 3 of chapter 9 of the Public Utilities Act, entitled ‘Judicial Review[,]’ . . . [which] prescribes a method of judicial review that is narrow in both ‘manner and scope,’ ” limiting review of a commission decision to an action filed directly in the Supreme Court by means of a petition for writ of review. (Covalt, supra, 13 Cal.4th at p. 915, citation omitted.) The court noted that “the Legislature then made it clear in section 1759 of the Public Utilities Act that no other court has jurisdiction either to review or suspend the commission’s decisions or to enjoin or otherwise ‘interfere’ with the commission’s performance of its duties . . . .” (Covalt, supra, 13 Cal.4th at p. 916.)
As this discussion makes clear, section 1759 is a statute involving subject matter jurisdiction, and divests trial courts of jurisdiction to entertain lawsuits that would interfere with the PUC’s regulation of utilities. Its application cannot be waived by the parties to the litigation. (See Harrington v. Superior Court (1924) 194 Cal. 185, 188 [228 P. 15] [“Jurisdiction of the subject matter cannot be given, enlarged or waived by the parties. . . . ‘[W]here the jurisdiction of the court as to the subject matter has been limited by the constitution or the statute the consent of parties cannot confer jurisdiction.’ ”].) Indeed, a judgment entered by a court without subject matter jurisdiction is void, and may be “ ‘attacked anywhere, directly or collaterally, by parties or by strangers.’ ” (Marlow v. Campbell (1992) 7 Cal.App.4th 921, 928 [9 Cal.Rptr.2d 516]; see Saffer v. JP Morgan Chase Bank, N.A. (2014) 225 Cal.App.4th 1239, 1246 [171 Cal.Rptr.3d 111] [“Subject matter jurisdiction may be raised for the first time on appeal. ... In addition, an alleged lack of subject matter jurisdiction must be addressed whenever it comes to a court’s attention.” (citation omitted)].) Therefore, Edison is not barred from asserting for the first time on appeal the trial court’s lack of jurisdiction under section 1759.
2. Section 1759 Does Not Bar Wilson’s Claims
Having concluded that section 1759 raises an issue of subject matter jurisdiction that is not waived by a party’s failure to raise it in its answer or a demurrer, we must determine whether that statute bars Wilson’s claims. For that we turn to Covalt, supra, 13 Cal.4th 893, in which the Supreme Court developed a three-part test to determine whether section 1759 applies.
a. The Covalt Test
In Covalt, supra, 13 Cal.4th 893, the Supreme Court was required to reconcile section 1759 with another provision of the Public Utilities Act, section 2106, that allowed private actions for damages against public utilities in certain circumstances. Section 2106 provides in relevant part that “[a]ny public utility which does, causes to be done, or permits any act, matter, or thing prohibited or declared unlawful, or which omits to do any act, matter, or thing required to be done, either by the Constitution, any law of this State, or any order or decision of the commission, shall be liable to the persons or corporations affected thereby for all loss, damages, or injury caused thereby or resulting therefrom.”
The court noted that in an earlier case in which it had been required to reconcile these two provisions for the first time, Waters v. Pacific Telephone Co. (1974) 12 Cal.3d 1 [114 Cal.Rptr. 753, 523 P.2d 1161] (Waters), it had “declared the primacy of section 1759 and the correspondingly limited role of section 2106. The [Waters] court held that ‘in order to resolve the potential conflict between sections 1759 and 2106, the latter section must be construed as limited to those situations in which an award of damages would not hinder or frustrate the commission’s declared supervisory and regulatory policies.’ ” (Covalt, supra, 13 Cal.4th at pp. 917-918, quoting Waters, supra, 12 Cal.3d at p. 4.) The Covalt court explained that, under the Waters rule, an action for damages under section 2106 “is barred by section 1759 not only when an award of damages would directly contravene a specific order or decision of the commission, i.e., when it would ‘reverse, correct, or annul’ that order or decision, but also when an award of damages would simply have the effect of undermining a general supervisory or regulatory policy of the commission, i.e., when it would ‘hinder’ or ‘frustrate’ or ‘interfere with’ or ‘obstruct’ that policy.” (Covalt, supra, 13 Cal.4th at p. 918.)
The Covalt court observed that “[t]he Waters rule may be further understood by considering examples of how it has been applied by our Courts of Appeal. When the bar raised against a private damages action has been a ruling of the commission on a single matter such as its approval of a tariff or a merger, the courts have tended to hold that the action would not ‘hinder’ a ‘policy’ of the commission within the meaning of Waters and hence may proceed. But when the relief sought would have interfered with a broad and continuing supervisory or regulatory program of the commission, the courts have found such a hindrance and barred the action under section 1759.” (Covalt, supra, 13 Cal.4th at pp. 918-919.)
The court then turned to the case before it, in which the plaintiffs filed an action for damages and injunctive relief against a utility, alleging the utility’s power lines that ran on land adjacent to the plaintiffs’ residence emitted “ ‘high and unreasonably dangerous levels of electromagnetic radiation onto plaintiffs’ property.’ ” (Covalt, supra, 13 Cal.4th at p. 911.) The court applied the Waters rule by answering three questions: “The first question is whether the commission has the authority to adopt a policy on (1) whether electric and magnetic fields arising from the powerlines of regulated utilities are a public health risk and (2) what action, if any, the utilities should take to minimize that risk” (id. at p. 923); “The next question is whether the commission has exercised the foregoing authority to adopt a policy on powerline electric and magnetic fields” (id. at p. 926); “The final question is whether the present superior court action would hinder or interfere with that policy within the meaning of Waters . . . and its progeny” (id. at p. 935).
As to the first question, the court found that “the commission has broad authority to determine whether the service or equipment of any public utility poses any danger to the health or safety of the public, and if so, to prescribe corrective measures and order them into effect.” (Covalt, supra, 13 Cal.4th at pp. 923-924.) It cited, among other things, section 761 of the Public Utilities Code, noting “that whenever the commission finds that the ‘equipment, appliances, facilities, or service of any public utility, or the methods of manufacture, distribution, transmission, storage, or supply employed by it’ are ‘unsafe,’ it shall prescribe the equipment, appliances, facilities, or service to be provided or used by the utility, and shall further prescribe ‘rules for the performance of any service or the furnishing of any commodity’ by such utility” (Covalt, supra, 13 Cal.4th at p. 924, quoting § 761); and section 762, noting that “whenever the commission finds that the equipment, apparatus, or facilities of any utility should be changed or improved, or new structures be erected, in order to promote the ‘security’ of its employees or the public, it shall order the utility to make such changes or erect such structures.” (Covalt, supra, 13 Cal.4th at p. 924; see § 762.)
As to the next question, the court noted that the Legislature initiated an inquiry into the potential health effects of electromagnetic fields (EMF) caused by electrical utility generating and transmission facilities, and directed the commission and the State Department of Health Services (DHS) to jointly conduct certain high-priority research projects and submit a report on the status of those research projects and recommendations, if any, for legislation to limit exposure to EMF. (Covalt, supra, 13 Cal.4th at p. 926.) The commission and DHS did so, and concluded that California should take no action at that time to regulate EMF around electric power facilities because such actions would be premature given current scientific understanding of the issue. (Id. at p. 927.) Subsequently, the commission issued a decision in a proceeding regarding the construction of a new transmission line by Edison, in which the commission ruled that although it would not adopt standards prescribing maximum allowable EMF levels or require any action to be taken to change EMF exposure levels along existing transmission lines, it would be prudent to avoid new exposure to EMF, and therefore it would require the utility to take certain steps to avoid unnecessarily exposing people to EMF. (Id. at p. 928.) A short time later, the commission reopened and enlarged its inquiry into the topic of EMF, and appointed an advisory panel, which issued a report to the commission recommending certain interim actions. (Id. at pp. 929-930.) The commission held public hearings on those recommendations and issued an interim opinion and order, and ultimately established an EMF policy for electric utility facilities and power lines. (Id. at pp. 930-931.) The court concluded that “[t]here is no doubt that the commission is still actively pursuing the broad policy inquiry into the potential health effects of powerline electric and magnetic fields . . .” (id. at p. 934), and that “the commission has exercised — and is still exercising — its constitutional and statutory authority to adopt a general policy on whether electric and magnetic fields arising from the powerlines of regulated utilities are a public health risk and what steps, if any, the utilities should take to minimize that risk” (id. at p. 935).
As to the final question, the court concluded that most of the plaintiffs’ claims failed to allege facts sufficient to state a cause of action, and the remaining claim, for nuisance, was barred by section 1759 because it would hinder or interfere with the commission’s policy. Addressing the nuisance claim, the court noted that to award damages for nuisance under a theory that EMF impaired the use and enjoyment of the property because the plaintiffs feared that EMF would cause them physical harm, the trier of fact would be required to find that a reasonable person viewing the matter objectively would experience a substantial fear that EMF cause physical harm and would deem the invasion so serious that it outweighs the social utility of the utility’s conduct. The court found that those findings would be inconsistent with the commission’s conclusion that the available evidence does not support a reasonable belief that the EMF in question present a substantial risk of physical harm and that regulated utilities need take no action to reduce EMF levels from existing power lines. (Covalt, supra, 13 Cal.4th at p. 939.)
b. Application of the Covalt Test
In applying the Covalt test to this case, Edison argues that (1) the PUC has broad authority “to regulate the design, siting, operation, and safety of electrical distribution systems”; (2) the PUC has exercised that authority by issuing regulations that “include detailed design, construction, operating, and safety specifications for every possible aspect of electric distribution systems (e.g., G.O. 95 [(construction of overhead systems)]; G.O. 128 [(construction of underground systems)]; G.O. 165 [(inspection requirements)]; G.O. 131-D [(planning and construction of electric generation, transmission and distribution facilities)]; G.O. 174 [(substations)] . . .)”; and (3) the jury award obstructs and interferes with the PUC’s regulations and policy by “imposing liability on Edison for stray voltage that results from Edison’s compliance with those regulations” and “effectively finding that Edison was required to do something — ‘completely eliminate[]’ stray voltage — that the PUC does not require.”
The PUC itself offered a similar analysis in an amicus curiae brief filed at the request of the trial court in two consolidated cases filed by Wilson’s neighbors against Edison based on allegations of stray voltage in the areas surrounding the Topaz substation.’ First, the PUC argued that the commission “has authority to adopt regulatory policies and programs regarding the design, construction, operation, and maintenance and safety of utility equipment and facilities.” Next, it argued that the commission exercised its authority by “adopting various regulatory policies and programs governing the design, construction, maintenance, operation, and safety of the equipment and facilities such as those at issue in this case,” noting that those policies and programs “are reflected in various Commission orders, decisions, rules, and regulations,” such as the rules and requirements set forth in general order (G.O.) 131-D, G.O. 95, and G.O. 128. In addition, the PUC noted that its “regulatory policies and programs in this area are continuing and ongoing,” citing the frequent amendments to G.O. 95 and the adoption in 2012 of G.O. 174, “containing ‘Rules for Electric Utility Substations.’ ” Finally, the PUC argued that court adjudication prior to a commission finding of wrongdoing “would interfere with the Commission’s authority to interpret and apply its own orders, decisions, rules and regulations regarding the design, construction, operation, maintenance and safety of utility equipment and facilities.” The commission noted that its “regulatory programs ensure, among other things, that regulated utilities will be subject to uniform requirements,” and that a trial court’s determination of the issues in the consolidated cases could “unintentionally result in new or inconsistent requirements regarding the design, construction, operation, maintenance, and safety of utility equipment and facilities.”
In contrast to Edison’s and the PUC’s analysis, Wilson in her respondent’s brief focuses only on the second question, and appears to argue that section 1759 applies only if “the PUC exercised its authority to specifically regulate the specific conduct for which the plaintiff sought civil damages.” She contends that because there is no regulation on stray voltage, Edison fails the Covalt test.
We disagree with Wilson’s assertion that section 1759 applies in this case only if the PUC has issued a specific regulation on stray voltage. In Covalt, the court observed that under the Waters rule, section 1759 barred an action for damages “not only when an award of damages would directly contravene a specific order or decision of the commission, . . . but also when an award of damages would simply have the effect of undermining a general supervisory or regulatory policy of the commission, i.e., when it would ‘hinder’ or ‘frustrate’ or ‘interfere with’ or ‘obstruct’ that policy.” (Covalt, supra, 13 Cal.4th at p. 918, italics added.) But we also disagree with Edison’s (and the PUC’s) assertion that the commission’s adoption of various policies governing the design, construction, maintenance, operation, and safety of electrical distribution facilities is sufficient to establish the PUC’s exclusive jurisdiction over the claims in this case.
As Wilson correctly points out, it is not sufficient that the PUC issued general regulations requiring that electrical distribution systems be operated and maintained in a manner to ensure safety and service, and setting forth certain design requirements. Indeed, the Supreme Court in Covalt cited with approval Pierce v. Pacific Gas & Electric Co. (1985) 166 Cal.App.3d 68 [212 Cal.Rptr. 283], in which the appellate court held that section 1759 did not bar the plaintiff’s action for damages caused by a defective transformer that exploded and sent 7,000 volts of electricity into house wiring designed to carry 120 volts. The Supreme Court noted the appellate court properly rejected “a contention that the superior court lacked jurisdiction under the Waters rule simply because a general regulation (Gen. Order No. 95) provides that electric supply systems shall be maintained in such a condition as to give ‘safe’ service and utilities shall ‘exercise due care to reduce to a minimum’ the hazards from overhead wires.” (Covalt, supra, 13 Cal.4th at p. 945.)
Edison, however, does not solely rely upon the general safety and design regulations issued by the PUC. As Edison explains, those regulations specifically address grounding, including grounding requirements for common neutral systems like the Topaz system. (G.O. 95, rules 21.4, 33.3, 58.2, 59.4.) Those regulations require that grounding be “effective” (G.O. 95, rule 21.4) and set forth detailed minimum requirements for ground conductors (G.O. 95, rules 33.3, 59.4). Because the PUC expressly requires that electrical distribution systems be grounded, and because (as even Wilson’s expert witness testified at trial) stray voltage is an inevitable byproduct of grounding, Edison argues that Wilson’s lawsuit — which imposes liability on Edison for damages resulting from this byproduct — contravenes the PUC’s grounding regulations because Edison cannot comply with those regulations while also satisfying Wilson’s demand that it completely eliminate stray voltage on her property.
Our review of the general orders Edison cites and the cases in which PUC exclusive jurisdiction was found lead us to conclude, however, that the Covalt test is not satisfied here.
First, although there is no doubt that the general orders require grounding of substations, it may be that Edison could comply with the regulations and still mitigate the stray voltage that results from grounding. Although that is an issue that is more appropriately submitted to the PUC under the primary jurisdiction doctrine (see Farmers Ins. Exchange v. Superior Court (1992) 2 Cal.4th 377, 390 [6 Cal.Rptr.2d 487, 826 P.2d 730] [when a claim is originally cognizable in the courts, primary jurisdiction “ ‘comes into play whenever enforcement of the claim requires the resolution of issues which, under a regulatory scheme, have been placed within the special competence of an administrative body; in such a case the judicial process is suspended pending referral of such issues to the administrative body for its views’ ”]), it does not mean that Wilson’s claims are barred under the Covalt test.
Second, when the PUC adopted G.O. 174, entitled “Rules for Electric Utility Substations,” the commission explained why it was needed: “The Commission’s current General Orders 95, 128, and 165 are already designed to promote safe operation of electric utility and communications infrastructure facilities, and provide minimum safety requirements which the utilities are to supplement with additional safety precautions when local conditions warrant. However, these General Orders do not give guidance as to how utilities operate and maintain their substations, and there are no specific regulations governing substation operation.” (Order Instituting Rulemaking to Implement Com. Regulations Relating to the Safety of Electric Utility Substations (Oct. 25, 2012) Cal. P.U.C. Dec. No. 12-10-029 [2012 Cal.P.U.C. Lexis 470, p. *2], italics added.) G.O. 174 does not, however, contain any such regulations. Instead, the general order requires each electric utility to establish and update an inspection program for its substations, maintain records of its inspections, and submit annual inspection program summaries and reports summarizing completed inspections to the utilities safety and reliability branch of the PUC. (G.O. 174, rules 30, 31, 32, 33, 40.) And although the PUC ordered the utilities to meet annually to share their newly developed practices and review their own practices in light of other utilities’ practices, with the expectation that “a ‘best practice’ will evolve that shows how to most effectively operate and safely control the electric systems in California . . . even as these practices continue to reflect the unique elements of each system” (Cal. P.U.C. Dec. No. 12-10-029, supra, 2012 Cal. P.U.C. Lexis 470 at p. *10), it is unclear whether this “best practice” will address stray voltage issues. Therefore, we cannot say with any certainty that litigation of Wilson’s claims would hinder or interfere with the PUC’s regulatory policy.
Finally, the purported exercise of authority that Edison relies upon is of a vastly different character than the kinds of exercise of authority found in cases in which courts applied the Waters rule and found that section 1759 bars the plaintiff’s action. In most of those cases, the PUC conducted (or was in the process of conducting) investigations into or adopted regulations on the specific issue alleged in the plaintiffs’ lawsuit. (See, e.g., Covalt, supra, 13 Cal.4th 893 [plaintiffs alleged damages due to defendant’s power lines emitting EMF radiation on plaintiffs’ property; PUC conducted research projects on and investigations into the potential health effects of EMF]; Sarale v. Pacific Gas & Electric Co. (2010) 189 Cal.App.4th 225 [117 Cal.Rptr.3d 24] [plaintiffs sought damages and injunctive relief based on a utility’s alleged excessive trimming of commercially productive walnut trees located under the utility’s power lines; the commission had adopted a regulation mandating minimum distances that must be maintained between conductors and vegetation, expressly declined to mandate the maximum limits of tree trimming, and left to the determination of the utility whether greater clearances were necessary under the circumstances to accomplish the purposes of the regulation]; Brian T. v. Pacific Bell (1989) 210 Cal.App.3d 894 [258 Cal.Rptr. 707] [plaintiffs sought damages and injunction to compel utility to restrict access of sexually explicit materials to adults through certain methods; commission had conducted investigation and hearings on how to restrict access and adopted a different method]; Schell v. Southern Cal. Edison Co. (1988) 204 Cal.App.3d 1039 [251 Cal.Rptr. 667] [owner of an RV park filed action alleging his RV park was entitled to residential baseline gas and electricity allocations; proceedings were pending before the commission on whether RV parks should come under a special rate schedule for provision of baseline service].)
In light of the absence of any indication that the PUC has investigated or regulated the issue of stray voltage, and without any evidence that stray voltage cannot be mitigated without violating the PUC’s regulation requiring grounding, we cannot say that Wilson’s lawsuit would interfere with or hinder any supervisory or regulatory policy of the PUC. Therefore, we hold that Wilson’s claims are not within the exclusive authority of the PUC under section 1759.
B. Sufficiency of the Evidence
In its appellant’s opening brief, Edison argued there was insufficient evidence to support Wilson’s claims, focusing on specific elements in each cause of action that Edison asserted Wilson failed to prove. Wilson did not respond directly to Edison’s arguments in her respondent’s brief, and did not address at all the elements of her claims. Instead she asserted that Edison ignored the evidence of Edison’s conduct before Wilson purchased her home, and gave too little weight to the experiences of previous tenants and the evidence of Wilson’s emotional distress. We have examined the evidence presented at trial and conclude that Wilson failed to present sufficient relevant evidence to establish the elements of her IIED and negligence claims. We cannot conclude there was insufficient evidence to support Wilson’s nuisance claim, since it requires the jury to balance the gravity of the harm from the interference with Wilson’s use and enjoyment of her property against the social utility of Edison’s conduct. Nevertheless, we hold that judgment with respect to that claim must be reversed and remanded for retrial because the jury considered evidence of Wilson’s physical injuries (which should not have been considered because there was no evidence those injuries were caused by her exposure to stray voltage) in balancing the harm against the social utility and finding in favor of Wilson.
1. TIED
Edison contends there was no substantial evidence that it engaged in any extreme or outrageous conduct directed at Wilson, and therefore Wilson could not recover on her TIED claim. We agree.
“The elements of the tort of intentional infliction of emotional distress are: ‘ “(1) extreme and outrageous conduct by the defendant with the intention of causing, or reckless disregard of the probability of causing, emotional distress; (2) the plaintiff’s suffering severe or extreme emotional distress; and (3) actual and proximate causation of the emotional distress by the defendant’s outrageous conduct. . . .” Conduct to be outrageous must be so extreme as to exceed all bounds of that usually tolerated in a civilized community.’ . . . [(J[] It is not enough that the conduct be intentional and outrageous. It must be conduct directed at the plaintiff, or occur in the presence of a plaintiff of whom the defendant is aware.” (Christensen v. Superior Court (1991) 54 Cal.3d 868, 903 [2 Cal.Rptr.2d 79, 820 P.2d 181], citation omitted (Christensen).)
Wilson’s theory at trial was that Edison had known for more than 20 years that there was stray voltage at the property Wilson purchased in 2007, that the level of stray voltage was dangerous, as evidenced by the physical injuries Wilson suffered, and that Edison’s decision to put the property on the market, its failure to eliminate the stray voltage, and its failure to warn Wilson caused Wilson extreme emotional distress due to her physical injuries and her fear of harm to herself and her children. Had the evidence at trial demonstrated that the level of stray voltage was dangerous and caused Wilson’s physical injuries, we might conclude the jury’s finding that Edison’s conduct was outrageous was supported by the evidence. But there was no such evidence.
To be sure, Wilson presented evidence of various physical ailments she suffered, as well as evidence that she did not begin to suffer those ailments until after she remodeled her master bathroom and began to feel electricity in the shower. Wilson did not, however, present any competent evidence showing that those physical ailments were caused by her exposure to the stray electricity at her house.
Although Wilson testified that a neurologist she went to in May 2011, Dr. Rederich, told her she had severed her nerve endings and that she might be developing secondary eryth