Citations

Full opinion text

MEMORANDUM OPINION

PROCTOR, District Judge.

The court has before it the Motion for Summary Judgment filed on behalf of Defendants United States Department of the Army, Anniston Army Depot, Army Chemical Materials Agency (provisional), and the United States Department of Defense (collectively “Federal Defendants”) (Doc. # 55) and the Motion for Summary Judgment filed on behalf of Defendant Westinghouse Government Environmental Services Co., Inc. (“Westinghouse”) (Doc. # 63). The motions have been fully briefed, and the court heard oral argument on February 15, 2005.

This case concerns the operations of the chemical weapons incinerator in Anniston, Alabama formally designated as the Anni-ston Chemical Demilitarization Facility (“ANCDF”). Plaintiffs contend in this case that the Federal Defendants and their co-permittee and outside contractor, Westinghouse, are currently violating certain portions of Alabama’s hazardous waste laws in their operation of the incinerator. Plaintiffs seek, among other relief, an injunction to shut the incinerator down entirely.

For the reasons outlined below, the court finds that Defendants’ motions for summary judgment are due to be granted because there are no disputed issues of material fact and Defendants have demonstrated that they are entitled to judgment as a matter of law.

I. Legal Standards for Evaluating a Summary Judgment Motion

Under Federal Rule of Civil Procedure 56(c), summary judgment is proper “if the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that the moving party is entitled to judgment as a matter of law.” Celotex Corp. v. Catrett, 477 U.S. 317, 322, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986). The party asking for summary judgment always bears the initial responsibility of informing the court of the basis for its motion and identifying those portions of the pleadings or filings which it believes demonstrate the absence of a genuine issue of material fact. See id. at 323, 106 S.Ct. 2548. Once the moving party has met his burden, Rule 56(e) requires the non-moving party to go beyond the pleadings and by his own affidavits, or by the depositions, answers to interrogatories, and admissions on file, designate specific facts showing that there is a genuine issue for trial. See id. at 324, 106 S.Ct. 2548.

The substantive law will identify which facts are material and which are irrelevant. See Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248, 106 S.Ct. 2505, 91 L.Ed.2d 202 (1986). All reasonable doubts about the facts and all justifiable inferences are resolved in favor- of the non-movant. See Fitzpatrick v. City of Atlanta, 2 F.3d 1112, 1115 (11th Cir.1993). A dispute is genuine “if the evidence is such that a reasonable jury could return a verdict for the nonmoving party.” Anderson, 477 U.S. at 248, 106 S.Ct. 2505. If the evidence -is merely colorable, or is not significantly probative, summary judgment may be granted. See id. at 249, 106 S.Ct. 2505.

II. Relevant Undisputed Facts

Congress enacted the Resource Conservation and Recovery Act (“RCRA”), 42 U.S.C. §§ 6901-6992k, to address problems associated with the management and disposal of wastes. RCRA establishes a “cradle-to-grave system” for regulating the disposal of solid and hazardous waste. United States v. ILCO, Inc., 996 F.2d 1126, 1130 (11th Cir.1993). RCRA contemplates a federal-state partnership to implement its provisions wherein a state may receive authorization from,the United States Environmental Protection Agency (“EPA”) for its hazardous waste management program. 42 U.S.C. §§ 6921-6939b. A state’s EPA-approved program under RCRA operates “in lieu of the federal program,” and the state may issue and enforce permits, which in turn have the same effect as RCRA permits issued by the EPA. 42 U.S.C. § 6926(b).

A. Alabama’s Hazardous Waste Management Program

In 1978, the Alabama legislature enacted the Alabama Hazardous Waste Management and Minimization Act (“AHWMMA”), Ala.Code §§ 22-30-1 to - 24. Under that authority, the state promulgated a hazardous waste management regulatory program designed to ensure that hazardous wastes are managed in a manner that protects human health and the environment and minimizes the generation and land disposal of these wastes. In 1987, EPA authorized Alabama’s hazardous waste management program, thereby authorizing Alabama to issue and enforce permits for the storage treatment and disposal of hazardous waste. Each owner and operator of a hazardous waste treatment, storage, or disposal facility must obtain a permit. In Alabama, this is referred to as a hazardous waste operation plan and these activities are administered by the Alabama Department of Environmental Management (“ADEM”). Alabama’s RCRA regulatory requirements establish specific performance standards, operating requirements, waste identification and analysis standards, and monitoring and inspection requirements. (ADEM Admin. Code R. 335 — 14—5—.15(4)).

ADEM has established a lengthy and detailed process that must be followed for an owner or operator to obtain a RCRA permit. A facility seeking to obtain approval of a permit must submit a permit application prior to construction. (ADEM Admin. Code R. 335-14-8-.02). ADEM evaluates the application (prior to construction) to ensure that there will be compliance with applicable technical standards. (ADEM Admin. Code R. 335-14-8-.08). If ADEM determines, upon receipt of a complete application, that a facility permit is due to be approved, ADEM then prepares a draft approval and accompanying statement of basis (i.e., a fact sheet), publishes the draft approval, and provides for a public hearing. (ADEM Admin. Code R. 335-14-8-.08). At the conclusion of the public comment period, ADEM issues a decision approving or denying the permit. (ADEM Admin. Code R. 335-14-8-.08(12)).

Hazardous waste incinerators must meet general requirements applicable to all hazardous waste treatment, storage or disposal facilities, as well as certain specific requirements and permitting procedures. All of these requirements are intended to ensure that the operation of the incinerator will protect human health and the environment. (Ala.Code § 22-30-6 and ADEM Admin. Code R. 335-14-8-.03(a) & (b)).

The Alabama Administrative Code provides an opportunity for individuals to raise concerns at any time about the operation of a facility. Specifically, the Code provides that “[p]ermits may be modified, revoked and reissued, or terminated either at the request of an interested party (including the permittee) or upon [ADEM’s] initiative.” (ADEM Admin. Code R. 335-14-8-.08(3)(a)). Among the appropriate reasons for modification or revocation of a permit is that ADEM has received information that “was not available at the time of permit issuance ... and would have justified the application of different permit conditions.” (ADEM Admin. Code R. 335 — 14—8—.04(2)(a) (2)).

Additionally, ADEM decisions approving an operation plan or modifications to a plan are subject to review before the Alabama Environmental Management Commission (“the Commission”). (ADEM Admin. Code R. 335-2-1-.01 to .30). Any individual who is “aggrieved” by the issuance, modification, denial, or repeal of a permit can request a hearing before the Commission. (ADEM Admin. Code R. 335-2-1-.03). Challenges to plan approvals are designated as contested case proceedings under the Alabama Administrative Procedures Act (“APAA”). Ala.Code § 41-22-3(3). Such proceedings provide the opportunity to present expert and fact witness testimony, to cross-examine witnesses, and to present written briefs and oral argument. (E.g., ADEM Admin. Code R. 335-2-1-.10). A party wishing to challenge ADEM’s approval order entered after a contested case proceeding before the Commission may file an appeal with the Alabama circuit court in the appropriate county. Ala.Code § 42-22-20(b). The circuit court reviews the Commission’s decision on the administrative record to determine whether the decision is supported by substantial evidence. Ala.Code § 42-22-20(k).

B. ANCDF’s Permit

The chemical weapons stored at the An-niston Army Depot are regulated as characteristic wastes, and residues from the management of chemical weapons are regulated as hazardous waste if the residues exhibit a hazardous waste characteristic. (ADEM Admin Code R. 335-14-2-.04; Hardy Depo. at 57-58; Doc. # 57, Ex. 1). Accordingly, the operator of ANCDF was required to obtain a hazardous waste facility permit from ADEM prior to commencing operation.

On June 19,1997, after a lengthy permit process which involved numerous exchanges and meetings between the permit-tees and ADEM and a public notice and comment period, (Hardy Depo. at 9-22), ADEM issued a hazardous waste facility permit to Defendants for operation of ANCDF. That permit contains provisions specifying the inspection, monitoring, contingency plan, and waste sampling requirements applicable to the facility. (Doc. # 57, Ex. 1). ADEM used the permit conditions established for the Army’s Tooele, Utah Chemical Demilitarization Facility (“TOCDF”) as a model to develop the permit conditions for ANCDF. (Hardy Depo. at 15). Although ANCDF is broadly based on the design of TOCDF, numerous changes were made in the design of ANCDF to reflect the experience gained in operation of TOCDF and other facilities. (Doc. # 64, Ex. 22 at 28, 29, 32, 122-25, 129-30, 223-25, 234-35). Moreover, the mix of materials to be processed at the TOCDF and ANCDF is different and the facilities have different managers and operators. (7d).

Before it began agent operations, ANCDF also had to undergo a series of trial burns. The first set of trial burns did not involve chemical agents, but rather surrogate compounds that tested the facility’s ability to operate properly and to destroy chemical agents. (Hardy Depo. at 27-29). During these surrogate trial burns, the facility’s emissions were monitored to determine that emissions from the facility do not pose a threat to human health or the environment. (Garrett Decl. ¶ 32). Before the facility could move to the next stage, which is a trial burn involving actual chemical agent containing munitions, ADEM had to approve ANCDF’s report on the surrogate trial burns and ANCDF’s agent trial burn plan. (Hardy Depo. at 29-39). Surrogate trial burns were completed in 2002, and ANCDF submitted the results to ADEM. (Garrett Decl. ¶ 33). ANCDF also submitted an agent trial burn plan to ADEM as a modification of the permit. ADEM approved the agent trial burn plan as a major modification of the permit on July 30, 2003. (Doc. # 57, Ex. 4). As of December 2003, ANCDF was processing munitions containing the nerve agent GB. (Garrett Dec. ¶ 39).

Gerald Hardy is Chief of the Land Division, the ADEM division responsible for the ANCDF permit. (Hardy Depo. at 8) Hardy is the person at ADEM who is most knowledgeable about the permitting process for the incinerator. (Hardy Depo. at 49-50). Although Hardy is somewhat removed from the day-to-day oversight of ANCDF and the permit, (Hardy Depo. at 10), he supervises the staff that has done the detail review of ANCDF from 1990 to the present. (Doc. # 62, Ex. 4, at 50). Timothy K. Garrett is the Army’s Site Project Manager for ANCDF. (Garrett Depo. at 7).

C. Administrative Hearing Challenging ADEM’s Issuance of the Permit

As noted earlier, applicable Alabama law allows ADEM’s permit decisions, including modifications to permits, to be challenged by any person or association in an eviden-tiary administrative hearing before a Hearing Officer designated by the Commission. (Ala.Code § 22-22A-7). On July 2, 1997, two of the Plaintiffs in the current case, Families Concerned About Nerve Gas Incineration (“Families”) and Serving Alabama’s Future Environment, Inc., (“SAFE”) filed a request with the Commission challenging ADEM’s issuance of the original permit. After the longest hearing proceedings in the history of the Commission, including the taking of extensive testimony from both sides, the Hearing Officer submitted to the Commission 662 pages of findings of fact and conclusions of law, along with the recommendation that the permit be approved as issued. On June 20, 2000, the Commission adopted the Hearing Officer’s 662-page report in full.

The Hearing Officer concluded that, in compliance with regulatory requirements, Defendants appropriately identified all of the various hazardous wastes that the munitions could contain including the products from incineration, decontamination, and age — and that this information was specified in the lists of hazardous wastes that were included in the permit application at Tables C-l-13, -14 and -15. (Doc. # 62, Ex. 1, Recommendation of Hearing Officer at 537, 619 Finding 7). The Hearing Officer also concluded that the identification of hazardous wastes which would be, or are likely to be, present for treatment at the facility could be conducted in compliance with Aabama’á RCRA rules either by sampling and analysis or by applying the generator’s knowledge of the materials for the processes that generated the wastes. (Doc. # 62, Ex. 1, Recommendation of Hearing Officer at 621, Conclusion of Law 1, citing ADEM Admin. Code R. 335-14-2-.02(l)(a)2.(ii)).

The Army conducted a study of chemical agent degradation compounds, and this information was included in the permit application. (Recommendation of Hearing Officer at 538). The Hearing Officer found that the permit application properly identified the following individual hazardous wastes: (1) arsenic (Doc. # 62, Ex. 2, Transcript of Administrative Hearing at 2140; see also ADEM Admin. Code R. 335-14-2-03(5) Table 1); (2) mercury (Transcript of Administrative Hearing at 2140; see also ADEM Admin. Code R. 335-14-2-03(5) Table 1); (3) Low pH (highly acidic) wastes (Transcript of Administrative Hearing at 2140; see also ADEM Admin. Code R. 335-14-2-.03(5) Table 1); and (4) Lewisite (an arsenic based agent) (Recommendation of Hearing Officer at 507-08).

In issuing the hazardous waste permit for ANCDF, ADEM had determined that the Defendants had used generator knowledge to adequately characterize the chemical weapon agents and chemical weapon-containing munitions to be processed in the facility. (Hardy Depo. at 39-40; Doc. # 57, Ex. 8 at 2-3). At the administrative hearing, evidence was presented to show that the nature of the chemical weapons would make the sampling of each container too dangerous for the benefit that might be derived, particularly given that the generator had knowledge of the materials likely to be present in the chemical weapons. (Transcript of Administrative Hearing at 3928). Based on that testimony, the Commission adopted the Hearing Officer’s determination that ADEM has the discretion under ADEM Admin. Code R. 335-14-8-.02(l)(c) to approve the Army’s use of “generator knowledge” and relevant information to characterize the waste without sampling each individual weapon or munition. (Recommendation of Hearing Officer at 539; at 619-20 ¶¶ 6-10; at 621-22, Conclusions of Law 1, 4 & 5).

The Hearing Officer and the Commission also concluded that Defendants properly characterized their hazardous waste according to the applicable regulations and also properly disclosed this characterization in the permit application. (Recommendation of Hearing Officer at 539-40; at 617-20; at 622, Conclusions of Law 2-5). The Commission, through its Hearing Officer, determined that the facts presented during the hearing supported a decision by ADEM that the initial permit application was complete as required by ADEM Admin. Code Ch. 335-14-8. (Recommendation of Hearing Officer at 622, Conclusions of Law 2-5).

D. State Court Appeal of Administrative Findings

Families and SAFE, the Petitioners in the Administrative Hearing, appealed the Commission’s June 20, 2000 decision to the Circuit Court of Montgomery County, Alabama. The Circuit Court affirmed the issuance of the permit, and those Plaintiffs appealed to the Alabama Court of Civil Appeals. In a lengthy opinion that discussed the evidence in the Hearing Officer’s Recommendation supporting the Commission’s decision, the Court of Civil Appeals affirmed the permit in its entirety. Families Concerned About Nerve Gas Incineration v. ADEM, 826 So.2d 857 (Ala. Civ.App.2002). The Court of Civil Appeals quoted the Hearing Officer’s findings that the contingency plan submitted in the permit application met all applicable requirements and concluded that those findings were fully supported by the record. Families, 826 So.2d at 872.

At the same time that the Montgomery County Circuit Court considered the permit appeal, it also considered a separate declaratory judgment action filed by Coosa River Basin Initiative, Inc. (“CRBI”), another of the Plaintiffs in the present case. The Circuit Court issued an opinion in CRBI that conflicted with the court’s opinion in the permit appeal. The separate CRBI decision was appealed to the Alabama Supreme Court, primarily over the Circuit Court’s holding that one provision of the permit constituted a rule and, thus, violated the rule-making procedures required by Alabama’s Administrative Procedures Act. The Supreme Court reversed the Circuit Court. Noting that the identical issue had been thoroughly analyzed by the Court of Civil Appeals in Families, the Supreme Court found that the holding in Families as to that issue was dispositive and that the permit’s provision was not a “rule” requiring notice and comment. Ala. Dep’t of Envtl. Mgmt. v. Coosa River Basin Initiative, Inc., 826 So.2d 111, 116 (2002).

III. This Court Has Subject Matter Jurisdiction Over Plaintiffs’ Claims

By order dated February 17, 2005, the court ordered the parties to address whether or not this court has subject matter jurisdiction over Plaintiffs’ alleged violations of state law, taking into account the following comments by the Eleventh Circuit in Parker v. Scrap Metal Processors, Inc., 386 F.3d 993 (11th Cir.2004):

In so concluding, we note that the RCRA’s citizen-suit provision contains language very similar to that contained in the CWA’s citizen-suit provision. See 42 U.S.C. § 6972(a)(1)(A) (conferring jurisdiction over citizen suits alleging a “violation of any permit, standard, regulation, condition, requirement, prohibition, or order which has become effective pursuant to this chapter”). We express no opinion as to whether the language in the RCRA grants federal courts jurisdiction over citizen suits alleging a violation of an EPA-approved state law under the RCRA. The issue under the RCRA is more complicated than under the CWA because a state’s EPA-approved program under the RCRA operates “in lieu of the federal program.” 42 U.S.C. § 6926(b); compare Ashoff v. City of Ukiah, 130 F.3d 409, 411 (9th Cir.1997) (holding that the RCRA authorizes jurisdiction over citizen suits based on the federal minimum standards, but not over state standards that exceed the federal mínimums), with City of Heath v. Ashland Oil, Inc., 834 F.Supp. 971, 979 (S.D.Ohio 1993) (determining that a “citizen suit is not available in an authorized state for an alleged violation of a federal provision superseded by state law” and noting that “there is a clear position among several courts that an (sic) RCRA citizen suit is not available to enforce a state authorized program”), and Chemical Weapons Working, Group, Inc. v. United States Dep’t of the Army, 990 F.Supp. 1316, 1319 (D.Utah 1997) (holding that once the EPA authorized Utah to administer the provisions of the RCRA, “the federal statute was no longer applicable,” and allowing suit only for alleged violations of state law). EPA-approved state programs under the CWA do not operate “in lieu” of the federal CWA program.

Parker, 386 F.3d at 1006 n. 13 (emphasis added). The court notes that the EPA, the federal agency primarily responsible for implementing RCRA, has articulated its view that citizen suit jurisdiction under RCRA is available to address violations of state RCRA requirements in authorized states. 49 Fed.Reg. 48,300, 48,304 (Dec. 12, 1984); 45 Fed.Reg. 85,016, 85,020-85,-021 (Dec. 24, 1980); see Lutz v. Chromatex, Inc., 725 F.Supp. 258, 261-62 (M.D.Pa.1989).

Although the Eleventh Circuit has raised a substantial question regarding whether this court has jurisdiction over citizen suits alleging a violation of an EPA-approved state law under RCRA, the parties believe that the court has jurisdiction in this case, and the court concludes that is the better view. Nonetheless, it is a close call given that a state’s EPA-approved program under RCRA operates “in lieu of the federal program.”

IV. Summary Judgment Is Due to Be Granted Because Plaintiffs Have Not Presented Sufficient Evidence of a Violation under 42 U.S.C. § 6972(a)(1)(A)

The remaining counts of Plaintiffs’ Second Amended Complaint allege that Defendants are in violation of various provisions of Alabama hazardous waste regulations. These claims are asserted pursuant to RCRA section 7002(a)(1)(A), 42 U.S.C. § 6972(a)(1)(A), which provides that a citizen suit may be brought against any person who is alleged to be “in violation” of any permit, standard, regulation, condition, requirement, prohibition or order which has become effective pursuant to RCRA.

In Count 1, Plaintiffs claim that Defendants are in violation of Alabama regulations that require the operator of a hazardous waste treatment facility to have a contingency plan (Ala. Admin. Code R. 335-14-5-.04), to inspect the facility in accordance with a written schedule (Ala. Admin. Code R. 335-14-5-02(6)), and to design, construct, operate and maintain the facility to minimize the possibility of fire, explosion, or any unplanned release of hazardous waste to the environment (Ala. Admin. Code R. 335-14-5-.03(2)). In Count 2, Plaintiffs claim that Defendants are in violation of Alabama regulations that require the operator of a hazardous waste facility to obtain an analysis of a representative sample of the wastes before they are treated (Ala. Admin. Code R. 335-14-5-02(4)) and to provide an analysis of the waste in the permit application or trial burn plan (Ala. Admin. Code R. 335-14-5-15(2)).

It is undisputed that ANCDF has been issued a RCRA permit by the State of Alabama that specifically implements the inspection, monitoring, contingency plan, and sampling provisions of the Alabama regulations that form the basis of Plaintiffs’ remaining allegations. In essence, the permit contains specific conditions (hereinafter “permit conditions”) that address the general requirements of the Alabama regulations on which Plaintiffs rely. Plaintiffs do not dispute that all of the regulatory provisions on which their claims are based were addressed in the permitting process and are implemented by specific permit conditions. (Hardy Depo. at 44-49).

It is important to note that Plaintiffs’ Second Amended Complaint alleges only that Defendants have violated Alabama regulatory provisions. The Second Amended Complaint does not allege that Defendants are in violation of the permit itself. Nonetheless, Plaintiffs’ claims have “morphed” through the summary judgment process to include that allegation, which they approach from two angles. First, Plaintiffs argue that Defendants have violated the permit by failing to comply with the regulations because the general mandates of the Alabama regulations have been incorporated into the permit by reference and/or by restating the substantive requirements. As explained below, the court finds that this argument is contrary to Alabama’s “permit shield” provision.

Plaintiffs’ opposition to summary judgment also articulates an alternative basis for their claim that Defendants are in violation of their permit. Plaintiffs now claim that “new facts,” which arose after the permitting process was complete, demonstrate ongoing permit violations by Defendants. Even assuming that this claim is properly in the case, the court finds this argument equally unpersuasive, as outlined in Section IV.D., infra. First, however, the court will discuss the permit shield and its effect on Plaintiffs’ arguments.

A. The Permit Shield Narrows the Relevant Question Before the Court

Alabama RCRA regulations contain a “permit shield” provision which provides that compliance with a state hazardous waste permit constitutes compliance with the requirements of RCRA. Ala. Admin. Code R. 335-14-8.01(4)(a). Under the permit shield, if all of Defendants’ ANCDF activities are authorized by, and in compliance with, the permit, Defendants are in full compliance with RCRA as a matter of law and are entitled to summary judgment.

As noted earlier, Plaintiffs do not dispute that the Alabama regulations on which their claims are based are addressed and implemented through the permit conditions set forth in ANCDF’s permit. Rather, Plaintiffs maintain that they can enforce the underlying regulations directly, even if the permitting authority has determined that the permittee is in compliance with the permit. Plaintiffs’ argument is dependent upon a finding that the Alabama permit shield provision is ineffective, and they offer the following reasons why this court should not apply the permit shield: (1) the holding in Shell Oil Co. v. EPA, 950 F.2d 741 (D.C.Cir.1991), renders permit shield provisions applicable only to EPA and state enforcement actions, not citizen suits; and (2) the Alabama permit shield conflicts with, and therefore is trumped by, federal law because it serves to bar federal RCRA citizen suits.

The court finds that both of Plaintiffs’ arguments are fundamentally flawed. Plaintiffs’ reliance on Shell Oil for the proposition that the applicability of permit shield provisions is limited to enforcement actions is misplaced. The D.C. Circuit specifically noted that the federal permit shield provision is applicable to citizen suits and does effectively “narrow the opportunities for citizen suits.” Shell Oil, 950 F.2d at 761-65; see also Chemical Weapons Working Group, Inc. v. United States Dept. of the Army, 111 F.3d 1485, 1492 & n. 5 (10th Cir.1997) (rejecting claims made by some of the Plaintiffs in this case that the citizen suit provision authorizes suits for permitted activity). Nonetheless, that “narrowing” of citizen suit availability is not a complete bar to citizen suits, as Plaintiffs allege. Rather, RCRA creates the cause of action for citizens to remedy violations, while the permit shield regulation defines what constitutes a RCRA violation. Even under the permit shield, citizen suits are certainly readily available to remedy violations of a permit and other such scenarios. However, when a permittee is acting in compliance with a permit, which was duly crafted by the authorized state entity to ensure compliance with RCRA requirements, the permit shield provision protects that permittee from allegations that it is still violating RCRA. Such an interpretation of the permit shield provision is consistent with RCRA’s intent for a federal-state partnership to regulate the disposal of solid and hazardous waste. Accordingly, the court finds that the Alabama permit shield does not conflict with RCRA and therefore operates in full force in this case.

Having determined that Plaintiffs’ claims are governed by the Alabama permit shield provision (that provides that compliance with a permit constitutes compliance with the regulations), the only relevant question for the court to determine is whether the hazardous waste activities being conducted at ANCDF are authorized by, and in compliance with, the permit. As explained below, the court finds the answer to be in the affirmative and therefore grants summary judgment for Defendants.

B. All of the Alleged Regulatory Violations of Count I Are Addressed and/or Authorized by the Permit

In Count 1, Plaintiffs allege that Defendants have violated three general provisions of Alabama’s regulations regarding contingency plans, facility inspections and design of the facility. (Second Amended Complaint ¶¶ 29-31). As outlined below, each of these provisions is addressed in detail in the ANCDF permit.

1.Contingency plan

Ala. Admin. Code R. 335-14-5-.04 requires that each hazardous waste facility have a contingency plan that describes how the facility operator will respond to an emergency situation such as fire, explosion, or unplanned release of hazardous waste. This requirement is implemented in condition II.H of the permit which requires the facility to follow the procedures contained in the Contingency Plan submitted to ADEM as part of the application and incorporated by ADEM into the permit. (Doc. # 57, Ex. 1, at 27). The permit also requires the facility to perform a staged shutdown of the facility in the event of fire or unplanned release and prohibits the facility from resuming operations until ADEM has been notified of the event and ADEM has given the facility approval to resume operations. (Doc. # 57, Ex. 1, at 27 (Permit conditions II.H.2, II.H.3); Ex. 6 at 2).

2. Facility inspection

Ala. Admin. Code R. 335-14-5-.02(6) requires that the operator of a hazardous waste facility inspect the facility in accordance with a written schedule. This provision is implemented by section II.E of the permit, which provides that the facility will comply with the relevant provisions of the Alabama regulations and with the specific Inspection Procedures and Schedules incorporated into the permit. (Doc. # 57, Ex. 1, at 25-26 (Permit condition II.E.l)).

3. Design of Facility

Ala. Admin. Code 335-14-5-03(2) requires that the facility be designed, constructed, operated, and maintained to minimize the possibility of fire, explosion, or any unplanned release of hazardous waste to the environment. This provision is incorporated into the permit through permit condition II.A.l, and the permit also requires that the facility be constructed in accordance with the drawings approved by ADEM. (Doc. # 57, Ex. 1, at 24 (Permit condition II.A.2)). Moreover, the permit contains extensive provisions detailing how the facility must be operated and maintained in order to minimize the possibility of fire, explosion or unplanned release. (Doc. # 57, Ex. 1, at 26, 96-152 (Permit conditions II.F (Training Plan) and II.G (Preparedness and Prevention), Permit Module VI (General Conditions for the Incinerators))).

With respect to the design of ANCDF, Plaintiffs contend that “the chemical warfare agent monitoring systems in use at the Army chemical weapons incineration sites are unreliable and have known defects.” (Doc. # 65). Plaintiffs maintain that Defendants should have altered the design or operation of ANCDF so as to prevent the following problems that TOCDF has experienced: (1) incinerator ACAMS agent monitor stack alarms; (2) releases to the environment of chemical agent and agent incineration wastes from non-stack locations (fugitive releases); (3) chemical agent releases to the environment from the incinerator stack; (4) gelling and gumming of agent in the agent feed guns; and (5) incidents in which workers have been exposed to chemical warfare agent at levels causing signs and symptoms of exposure.

Defendants point out that the TOCDF operational history was fully considered by ADEM in making its decision on the ANCDF permit. (Doc. # 57, Ex. 7, Department of the Army Memorandum October 12, 2000, Enclosure 4 to Minutes of December 7, 2000 ANCDF/ADEM meeting). Moreover, while the facility at TOCDF is similar to ANCDF, there are also significant differences in the design, construction, and operation of the two facilities, reflecting the fact that they were constructed at different times, are operated by different people, and have different mixes of munitions and other materials to be processed. (Doc. # 64, Ex. 22 at 28, 29, 32, 122-25, 129-30, 223-25, 234-35). Therefore, as noted by the court in footnote 3, supra, the fact that an incident may have occurred at TOCDF is simply not evidence that Defendants are in violation- of their permit or regulatory obligations at ANCDF.

4. Monitoring of Emissions

Plaintiffs also allege that Defendants are not adequately monitoring emissions from the facility that might be released, but that have not been identified. (Second Amended Complaint ¶ 37). Plaintiffs claim that the fact that these unidentified compounds are not monitored means that the facility poses a threat to human health or the environment. (Second Amended Complaint ¶¶ 32-38). The issue of what compounds should be monitored in the facility’s emissions (and when) and what action should be taken as a result of any ex-ceedances has been specifically addressed in the permit. (Hardy Depo. at 32-37, 46-48). The permit contains specific emission limitations and monitoring requirements for each of the facility’s incineration units during the shakedown, trial burn and post-trial burn periods as well as during normal operation. (Doc. # 57, Ex. 1, at 102-79 (Permit conditions VI.B.l.ii-vii and VII.B.2.ii-vii (emission standards for the Liquid Incinerator), VI.B.4 and VII.B.5 (monitoring requirements for Liquid Incinerator), VI.C.l.ii-vii and VII. C.2.ii-vii (emission standards for the Metal Parts Furnace), VI.C.4 and VII.C.5 (monitoring requirements for the Metal Parts Furnace), VI.D.l.ii-vii and VII.D.2.ii-vii (emission standards for the Deactivation Furnace), VI.D.4 and VII.D.5 (monitoring requirements for the Deactivation Furnace))).

Moreover, the evidence shows that Plaintiffs’ monitoring concerns were raised and specifically addressed in the permitting process. Once again, Plaintiffs’ claims are based on events that occurred at TOCDF, e.g., ACAMS monitor alarms at TOCDF have been triggered by substances other than chemical agent. (Second Amended Complaint ¶¶ 32-33). Information concerning the alarms at TOCDF was submitted to ADEM during the permitting process. (Doc. # 57, Ex. 7). Among the information submitted to ADEM was an analysis of the false alarms at TOCDF, which determined that the alarms were caused by various interfering substances (many of which were identified) and that the problem was exacerbated by the sensitivity of the monitors. (Doc. #57, Ex. 7, at 14-16, 18). Thus, at the time the ANCDF permit was issued and then modified to allow agent operations, ADEM was fully aware that agent alarms had occurred at TOCDF, and that not all of the interfering substances had been identified. Armed with that information, ADEM constructed ANCDF’s permit accordingly.

The court finds that the determination of which contingency plans, facility inspections, facility design, and emissions monitoring are required to protect human health and the environment is delegated to ADEM, was specifically addressed in the permitting process, is governed by specific provisions in the facility’s permit, and has been affirmed by the Alabama courts.

C. All of the Alleged Regulatory Violations of Count II Are Addressed and/or Authorized by the Permit

In Count 2, Plaintiffs challenge the adequacy of Defendants’ analysis of the materials to be processed in the ANCDF. Specifically, Plaintiffs allege that Defendants are in violation of Ala. Admin Code R. 335-14-5-15(2), which requires that a person seeking a permit for a hazardous waste incinerator submit a trial burn plan that includes an analysis of the wastes to be burned, and Ala. Admin Code R. 335-14-5-02(4), which requires the permittee to obtain an analysis of a representative sample of the wastes before they are treated. The Alabama regulations provide that the sampling requirement of Ala. Admin Code R. 335-14-5-02(4)(a) is satisfied by following a waste sampling plan incorporated into the permit. Ala. Admin Code R. 335-14-5-02(4)(b).

Plaintiffs argue that Defendants are violating the above regulations because neither ADEM nor Defendants have performed actual chemical analyses of the chemical agent and weapons waste to be incinerated at ANCDF, but have relied instead on the analysis done at TOCDF and the Army’s knowledge as waste generator of the chemical warfare agent manufacturing process. To the contrary, the undisputed evidence demonstrates that Alabama’s characterization requirements were specifically addressed in the ANCDF permit and that ADEM was fully aware of the Army’s reliance on results from TOCDF. Moreover, Plaintiffs’ argument ignores the undisputed fact that regulations expressly permit a generator to use its knowledge of its waste to characterize it in lieu of testing. (Doc. # 57, Ex. 2 at 39 — 40).

1. General Characterization and Sampling

In its permit application, the Army explained that the chemical agent-containing materials to be processed at ANCDF were products that had been manufactured to the Army’s specifications and carefully controlled since manufacture. (Hardy Depo. at 39-40; Doc. # 57, Ex. 1, at Att. 2 at 1-2). The Army has extensive documentation of the manufacturing process for the materials to be processed at ANCDF. (Id.). The Army also has information from the sampling of munitions that occurred at TOCDF and the facility at Johnson Atoll. (Id.). Thus, the Army represented to ADEM that the materials to be incinerated at ANCDF have been well-characterized and that no further physical or chemical analysis was necessary. (Id.). The permit contains a waste analysis plan that specifies how the facility is to sample and analyze residues and other wastes to be generated during operation of the facility. (Doc. # 57, Ex. 1, at Att. 2).

Based on that information, ADEM developed estimates of the maximum amounts of metals and other constituents likely to be present in the munitions at ANCDF, and the emissions from incineration of materials containing these maximum amounts were tested during the required trial burns. (Hardy Depo. at 32-38; Doc. # 57, Ex. 8, at 2-7, 19, 21-24). The resulting emissions were then analyzed through a risk assessment to determine if they presented a risk to human health and the environment. (Id.).

Accordingly, in issuing the permit, ADEM determined that the Army’s characterization of the agent-containing materials was adequate. (Doc. # 57, Ex. 8, at 2-3). Plaintiffs challenged that determination administratively, and their claim was rejected by the Hearing Officer and the determination upheld by the Supreme Court of Alabama. Families Concerned About Nerve Gas Incineration v. Alabama Dep’t of Envtl. Mgmt, Envtl. Mgmt. Comm’n Docket No. 97-17, Administrative Hearing Officer Findings of Fact, Conclusions of Law and Recommendations, at 270; Alabama Dep’t of Envtl. Mgmt., et al., v. Coosa River Basin Initiative, Inc., 826 So.2d 111 (Ala.2002). As noted above, ADEM also specifically included in the permit a waste analysis plan to characterize the residues from the incineration process and other wastes that will be generated during the incineration process.

There is no basis for Plaintiffs’ contention that Defendants do not know what levels of constituents are present in the munitions at ANCDF.

2. Formulation of a Plan to Combat Potential Analysis Problems Experienced at TOCDF

The undisputed evidence indicates that ADEM did not blindly adopt the protocol used at TOCDF, as Plaintiffs seem to suggest. In fact, ADEM not only carefully considered any analysis problems encountered by TOCDF when formulating ANCDF’s permit, but it also approved specific plans to deal with those potential issues. For example, after Defendants informed ADEM that certain manufacturing lots of the nerve agent GB had been stabi-Iized at TOCDF with a material that made the agent prone to gelling over time (Doc. # 57, Ex. 8, at Att. 1 at 3, Att. 2 at 3), a specific plan was developed and approved by ADEM to safely process munitions containing gelled agent at ANCDF. (Hardy Depo. at 40-43; Doc. # 57, Ex. 8 at 1-2, 17).

The court finds that ADEM has determined that the conditions contained in ANCDF’s permit are adequate to protect human health and the environment. Ala. Admin. Code R. 335-14-8-.03(a), (b); Doc. # 57, Ex. 8, at 22-23. Plaintiffs have had ample opportunity to challenge ADEM’s action on the permit through the state administrative and judicial process, including review by the highest state courts in Alabama. This court will not revisit that issue. Accordingly, the court finds that the question of whether the munitions to be processed at ANCDF have been adequately characterized and analyzed was thoroughly addressed in the permitting process and sanctioned by ADEM.

D. Plaintiffs’ Alleged “New Evidence” Is Not Sufficient to Show That Defendants Have Failed to Comply with the Permit

In response to the Defendants’ argument that all of Plaintiffs’ claims were considered by ADEM during the permitting process and addressed by the permit, Plaintiffs argue that “new” facts, which arose after the permitting process was complete, demonstrate ongoing permit violations at ANCDF. As noted earlier, this claim was not pled by Plaintiffs in the Second Amended Complaint. Plaintiffs have alleged only violations of Alabama regulations, not violations of the permit itself. Moreover, Plaintiffs’ reliance on “new evidence” is fundamentally flawed because any fact that occurred too late to be considered in the permitting process also occurred too late to form the basis for the claims articulated in Plaintiffs’ July 10, 2003 Second Amended Complaint. Although the ANCDF permit was initially granted in 1997, that permit only allowed construction of the facility. Hazardous waste operations at the facility did not, and could not, begin until the permit was modified to approve the facility’s agent trial burn plan. That final approval of the permit did not occur until July 30, 2003. (Doc. # 57, Ex. 4). Thus, any new facts that arose after the July 30, 2003 approval of the permit for hazardous waste operations occurred at least 20 days after Plaintiffs’ Second Amended Complaint was filed and cannot form the basis for Plaintiffs’ claims in this case.

Ironically, although Plaintiffs’ complaint warns of the “imminent harm” that could result from Defendants’ activities at ANCDF, not a single one of the Plaintiffs challenged the most recent permit decision by ADEM in July-August 2003 — the modification which allowed trial burns of actual agent (and which is the modification under which current operations are governed). A decision by ADEM to modify a permit is subject to challenge by any affected person in the same manner as the initial permit decision. Ala.Code § 22-22A-7(c) (1975). Each time the permit has undergone a major modification, the public has been given notice and an opportunity to comment prior to ADEM approval of the modification. Nonetheless, Plaintiffs did not pursue administrative review, nor bring to ADEM’s attention, any of their “new” evidence concerns.

At oral argument, Plaintiffs indicated that they chose to pursue a citizen suit against Defendants rather than approaching ADEM about the most recent “evidence” of potential violations. Plaintiffs characterized the issue of violations at ANCDF as an enforcement decision by ADEM (Tr. at 145), suggesting at least by inference that ADEM has simply chosen not to pursue recent violations at ANCDF. Hardy’s deposition testimony refutes Plaintiffs’ effort to make this appear to be an exercise of enforcement discretion involving actual violations that ADEM has ignored. Hardy testified that there were no violations of the regulatory provisions that Plaintiffs seek to enforce in this case, not that ADEM had decided not to pursue possible violations. Moreover, the fact that ADEM recently issued a “Notice of Violation” to.ANCDF — albeit unrelated to Plaintiffs’ claims in this case, as outlined in Section IV.E., infra — deflates Plaintiffs’ inference, of non-enforcement by ADEM.

In any event, the court finds that Plaintiffs have failed to present evidence to establish that Defendants are violating the ANCDF permit. At the February 15, 2005 oral argument, Plaintiffs articulated the following “new” evidence which they allege demonstrates a permit violation: (1) there have been, or will be, agent releases from the heated discharge conveyor bin area (Tr. at 93-98; 102-104; 107-124); (2) combustion óf agent on the' DFS feed chute has occurred and that agent material builds up on the chute (Tr. at 28); (3) Defendants failed to anticipate high levels of mercury and other metals in the waste, and failed to sample or test the munitions (Tr. at 16-18; 21-25; 71-78; 80-82; 126-38; 141-47); and (4) Defendants have failed to anticipate the presence of gelled or solidified agent wastes in some of the munitions and did not test the munitions or waste to determine the extent of the problem (Tr. atl6-18; 21-25; 28; 138-47). The court will address each claim in turn.

1. Agent Releases from the Heated Discharge Conveyor Bin Area

Plaintiffs allege that the detection of low levels of agent in the heated discharge conveyer bin enclosure demonstrates that Defendants are not taking sufficient action to prevent the release of hazardous waste. (Doc. # 75, at 4 (relying on Garrett Depo. at 164-165; Love Depo. at 82-101); Tr. at 89-90). Plaintiffs have inferred that agent detection in the DFS heated discharge conveyor bin enclosure area means that chemical agent has been released into the environment. (Doc. # 65, at 2-3). Plaintiffs’ argument fails for two reasons. First, Plaintiffs’ Second Amended Complaint does not contain this claim. Second, Plaintiffs’ only “evidence” of a release is their belief that, because chemical agent has been detected twice in an enclosed room that is part of the protected area inspected daily, a release can or has occurred every time the door to the bin is opened for daily inspection. (Tr. at 95, 97).

Detection of agent in the bin enclosure is not a permit violation. Rather, the permit requires that ANCDF monitor the area and adhere to its procedures to minimize the risk of a release which could threaten human health or the environment. (Doc. #57, Ex. 1, at 24 of 241'(Permit Condition II.A.1)). The evidence indicates that the heated discharge conveyer bin is in an area where air flow is controlled and constantly monitored for the presence of agent. (Garrett Depo. at 162-64; Love Depo'., at 76-89). Plaintiffs specifically admitted to the Court that the Plaintiffs do not know of any release of agent from this bin at ANCDF “to date” (Tr. at 96, 102, 104), and there is no evidence that the presence of agent in the bin enclosure caused a release of agent into a non-controlled area or resulted in a permit violation or Alabama RCRA violation related to waste characterization and the Contingency Plan.

To the contrary, the evidence demonstrates that Defendants are complying with the permit and that the detection of chemical agent in the bin enclosure was investigated and addressed. (Doc. # 64, Ex. 23 at 82-91; Ex. 22 at 171-75, 223-24). In May 2004, ADEM modified the permit to implement specific procedures for ANCDF to follow when chemical agent is detected in the DFS bin enclosure during both future agent trial burns and normal operations. (Permit Modification 17, conditions VI.D.3.x-xi (revised pages 28-29 of Module VI), conditions VII.D.4.ix-x (revised pages 25-26 of Module VII)). The permit modification also required that the facility be modified so that agent feed to the DFS is immediately stopped if the alarm in the DFS bin enclosure area is triggered. (Permit Modification 2 to 3 (noting modifications to Module VI, Table 6-11 and Module VII, Table 7-6)).

The fact that agent was detected on two occasions in the conveyer bin enclosure area at levels below the allowable discharge provides no basis to question ADEM’s determination that ANCDF’s permit is adequate to satisfy regulatory requirements.

2. Combustion of Agent on the DFS Feed Chute

Plaintiffs next allege the following regarding the deactivation furnace system (“DFS”) feed chute (the location at which munitions are fed into the furnace): (1) a recent jamming of the feed chute at ANCDF signals a potential problem because the jamming of the feed chute at TOCDF was one of the contributing factors to the TOCDF May 2000 agent stack release (Doc. # 64, Ex. 16 at 2-4, Ex. 20); (2) “ANCDF is prematurely incinerating munitions in the DFS feed chute.... Emissions from this process are not controlled or properly regulated” (Doc. # 65, at 2, relying on Garrett Depo. at 37); and (3) ANCDF has experienced accumulations of ash, fiberglass pieces and pieces of munition bodies in the DFS feed chute kicker plate area (Garrett Depo. at 33-34), which Plaintiffs claim is a regulatory or permit violation. (Tr. at 28). Plaintiffs’ arguments are not relevant to their claims in this case that ANCDF is not adequately monitoring for compounds other than chemical agent and that wastes were not adequately characterized. Plaintiffs provide no explanation of how the operation of the DFS is related to those claims.

Moreover, even assuming these events are relevant to Plaintiffs’ claims, they do not demonstrate that ANCDF is in violation of its permit. The design, performance standards, and operating requirements for the DFS are set forth in the permit. The permit specifically allows combustion to incur in the DFS (Doc. # 57, Ex. 1 at 153), and the feed chute is part of that system. (Garrett Depo., at 48-53). ANCDF was designed so that any gases generated during combustion in the feed chute are directed into the furnace and the air pollution control system. (Doc. # 64, Ex. 22 at 45^46). Ash accumulates at the point where munitions are fed into the DFS incinerator because there is a great change in temperature. (Garrett Depo., at 37-39). There is no evidence that this causes emissions from ANCDF, or that it results in any violation of the permit or regulations alleged in this case. Moreover, both the design of the feed chute and adjustments to that design made in response to problems that had occurred at TOCDF were specifically addressed in the permitting process. (Doc. # 57, Ex. 8 at 34).

3. High Levels of Mercury and Other Metals in the Waste and Failure to Sample or Test Munitions

Plaintiffs also argue that there is a “problem with mercury emissions” from ANCDF, because Defendants do not continually sample for mercury emissions. (Doc. # 65, at 3; Doc. # 75, at 2). Plaintiffs point out that mercury has been detected in GB and mustard agent at ANCDF (Garrett Depo. at 182, 185), and they allege that Defendants “don’t know how much mercury is in the waste, they don’t know how much mercury comes out of the stack, and they don’t have any reliable method of capturing the mercury.” (Doc. # 75, at 2).

Contrary to Plaintiffs’ argument, mercury was specifically identified as a waste expected to be present in incineration through the listing of waste Code D009 in the permit application. (Doc. # 62, Ex. 1, at 2140; ADEM Admin. Code R. 335-14-2-.03(5) Table 1). Moreover, the permit does not require ANCDF to conduct continual sampling for mercury. (Hardy Depo., at 62-70). Rather, the permit required ANCDF to sample waste for mercury in the surrogate trial burns and to operate the facility within the established parameters. (Love Depo., at 150-51). There is no dispute that potential metal emissions from the facility, including mercury, were tested during the surrogate trial burn and analyzed through risk assessment. (Hardy Depo. at 43-44; Doc. # 57, Ex. 8, at 5; Love Depo., at 150-51). Plaintiffs offer no evidence that mercury or other metal emissions exceed what is allowed by the permit.

Although Plaintiffs point out that no regulation prevents Defendants from sampling for mercury, this argument carries no weight. That sampling is not prohibited does not meant that Defendants have an obligation to sample. Moreover, Plaintiffs’ argument ignores the option to use generator knowledge (rather than sampling) — an option that the Hearing Officer ultimately recommended in view of the danger presented if each munition were tested:

Regarding waste sampling, no regulation mandates sampling as the sole means of waste identification and determination. (Although the Plaintiffs’ allege that the Army and Westinghouse have not sampled and analyzed all wastes, they cite no regulation requiring such action). In the administrative proceeding, it was established that sampling is one of two methods a generator of hazardous waste may use in making a waste determination, with the alternative being that the generator (here the Army) can apply its knowledge of the materials or the processes that generated the wastes.

(Doc. # 62, Ex. 1 at 621, Conclusion of Law 1, citing ADEM Admin. Code R. 335-14-2-.02(l)(a)2.(ii)). ADEM approved not tapping and sampling the munitions to avoid the risk to workers and the public. (Hardy Depo., at 39-40). Plaintiffs simply disagree with the permit provisions and the decision of the Commission to adopt the Hearing Officer’s Recommendations in this regard. But Plaintiffs’ disagreement does not even hint at a permit violation and further, their mere disagreement cuts no ice at all in light of the permit shield provision.

4. Failure to anticipate gelled or solidified agent wastes in munitions

Finally, Plaintiffs point out that, during operations at TOCDF, some of the munitions contained gelled agent while bulk agent lots contained higher levels of contaminants than initially projected. (Second Amended Complaint ¶ 41). As noted before, this information was provided to ADEM during the permitting process and ADEM specifically determined that the munitions to be processed at ANCDF had been adequately characterized. (Hardy Depo. at 39-40; Doc. # 57, Ex. 8, at 2-3, 8-17).

ADEM was informed in October 2000 that the munitions to be processed at ANCDF could contain gelled or crystalline agent. (Doc. # 57, Ex. 8, at 8). This fact was considered in detail by ADEM before it allowed both the surrogate trial burn and the agent trial burn. (Doc. # 57, Ex. 6 at Att. at 3, Att. 2 at. 2, 12; Doc. # 57, Ex. 8 at 1-2, 8-21). In fact, ANCDF was required to conduct a separate trial burn specifically tailored to address the issue of weapons that could not be drained because of the presence of gelled or crystallized agent. (Doc. # 64, Ex. 22 at 276-78; Garrett Dec., at ¶¶ 38, 39; Doc. # 57, Ex. 8 at 6). Furthermore, the waste analysis plan submitted to ADEM, and incorporated into the permit, stated that “[t]he ANAD inventory of munitions contains chemical agents in three forms (liquid, gelled, or crystallized), due to stabilization chemicals added to specific lots during production or storage.” (Doc. # 57, Ex. 1, Attachment 2, at 1-2). The undisputed evidence shows that ADEM, with knowledge that the munitions to be processed at ANCDF could contain gelled or crystalline agent, specifically determined that any additional information that might be gained from physical testing of the munitions at ANCDF would not be worth the risk of a release associated with sampling these weapons. (Hardy Depo. at 39-40). Accordingly, Plaintiffs have not shown that Defendants are in violation of the permit by failing to anticipate or manage gelled or solidified agent wastes.

E. The August 26, 2004 Notice of Violation Is Not Probative of Plaintiffs’ Claims

At the February 15 hearing, Plaintiffs also referred to an August 26, 2004 Notice of Violation (“NOV”) issued by ADEM to ANCDF. (Doc. # 87, Ex. 3). The NOV identified nine violations of the ANCDF permit that were either observed by ADEM inspectors or reported to ADEM by ANCDF during the period April 4, 2004 to June 22, 2004. Defendants have offered the NOV as summary judgment evidence and do not object to the admission of the NOV. (Doc. # 87, Ex. 3). Therefore the court will consider it as part of the summary judgment record.

Defendants argue that the NOV is not relevant to Plaintiffs’ claims in this case because events that occurred in 2004 cannot establish that ANCDF was in violation of the permit when the complaint was filed in 2002 or amended in 2003. Defendants also maintain that the issues raised in the NOV are in the process of being resolved by an administrative order on consent that currently is being considered for public comment. (Doc. # 87, Ex. 4; see also http://www. a dem. state, al. us/ PublicN ot-ice/Jan/AO/ lUSArmy.htm).

Plaintiffs argue that the NOV proves that ADEM has concluded that Defendants are not in full compliance with either the permit requirements or the applicable regulations. Nonetheless, Plaintiffs admit that the August 2004 NOV “does not address most of the violations alleged in the Plaintiffs’ second amended complaint.... Item 9 concerns Plaintiffs’ claim regarding the regulatory and permit violation of failure to prevent and minimize releases from the DFS HDC bin in substance, although it cites only to one specific permit requirement regarding the waste feed cut off procedure.” (Doc. # 88).

The court finds that the August 2004 NOV is not relevant to, nor probative of, Plaintiffs’ claims in this case. Plaintiffs admit that only one of the items identified in the NOV bears any relationship at all to their claims-Item No. 9 which addresses ANCDF’s report to ADEM that, as of July 29, 2004, the ACAMS monitoring device in the deactivation furnace system heated discharge conveyer bin enclosure was not being managed as an automatic waste feed cutoff as required by the permit modification of May 25, 2004. This item is not probative of Plaintiffs’ claim that Defendants are in violation of their permit obligation to prevent and minimize releases from the DFS heated discharge conveyor bin. That the ACAMS monitoring device in the DFS was not being managed as an automatic waste feed cutoff does not prove that Defendants have released, or failed to prevent the release of, hazardous waste into the environment. The permit imposes specific operational requirements to minimize releases from the bin enclosure, including a requirement to cease waste feed if there is an alarm from the ACAMS. (Doc. # 87, Ex. 2, at 28-29 of Module VI, 25-26 of Module VII). There is no evidence that Defendants have not complied with those requirements. The August 2004 NOV is not sufficient to demonstrate a permit violation related to Plaintiffs’ claims in this case.

Accordingly, for all of the reasons articulated above, the court finds that summary judgment for Defendants is due to be granted on the merits of Plaintiffs’ claims. The undisputed evidence demonstrates that all of the regulatory provisions on which Plaintiffs rely, and the concerns which Plaintiffs have articulated, were addressed by the permitting process. Moreover, there is no evidence that Defendants have violated the permit conditions as set forth by ADEM. Because Plaintiffs’ claims are governed by the Alabama permit shield provision (that provides that compliance with a permit constitutes compliance with the regulations), summary judgment is due to be granted because all of the hazardous waste activities being conducted at ANCDF are authorized by, and in compliance with, the permit.

V. Summary Judgment Is Due to Be Granted Because Plaintiffs’ Claims Are Impermissible Collateral Challenges to the Permit

Alternatively, the court finds that summary judgment is due to be granted because Plaintiffs’ claims constitute a collateral challenge to the permit, which falls outside of the court’s jurisdiction and regardless, is subject to res judicata.

It is clear from Plaintiffs’ opposition to summary judgment that Plaintiffs seek to collaterally attack ADEM’s decisions about how to implement Alabama’s regulations through specific conditions in the permit. As noted throughout this opinion, ANCDF’s permit addresses all of the regulatory provisions that Plaintiffs allege have been violated and sets forth specific conditions to ensure ANCDF complies with those regulations. All of the Plaintiffs’ evidence concerning events or potent