Citations

Full opinion text

MEMORANDUM & ORDER MATSUMOTO, District Judge. Plaintiffs in this action consist of the president of a labor organization, the Tile Setters and Tile Finishers Subordinate Union of New York and New Jersey of the International Union of Bricklayers and Allied Craftsman, in his official capacity (“Local 7” or “Union”), and trustees of the funds through which fringe benefits are provided to participants who are members of Local 7, in their official capacities (“Funds”). Defendants are Speedwell Design, BFK Enterprises, LLC, (“Speedwell”) and its president and sole owner, Barry Kolsky. Speedwell is in the business of providing interior construction work. Plaintiffs Union and Funds commenced this action against defendants, alleging that Speedwell failed to' pay wages and make contributions to the funds pursuant to two sets of collective bargaining agreements entered into between the parties in 1997 and in 2001. Plaintiff Union alleges in its complaint that defendants’ failure to pay union wages is in violation of § 301 of the Labor Management Relations Act, as amended, 29 U.S.C. § 185(a) (LMRA), and seeks unpaid wages, plus interest, from 1997 through the present. Plaintiff Funds claim that defendants’ failure to contribute to benefit funds for covered work is in violation of the Employee Retirement Income Security Act of 1974, as amended, 29 U.S.C §§ 1001 et seq. (ERISA), and seek unpaid contributions, plus interest and liquidated damages, from 1997 through the present. In their answer, defendants assert state law tortious inference counter-claims against the Funds and a claim for violation of § 8(b)(4)(ii)(B) of the National Labor Relations Act (NLRA), 29 U.S.C. § 158(b)(4)(ii)(B), against the Union. Pending before the court are the following motions for summary judgment: 1) Defendants’ motion for summary judgment that the 2001 Agreements are not collective bargaining agreements but single-project agreements, and are invalid for fraud in the execution; 2) Defendants’ motion for summary judgment that the plaintiff Union failed to exhaust contractual remedies contained in the 2001 Agreements, is barred from bringing suit by the statute of limitations, and lacks associational standing to bring a claim on behalf of its members; 3) Defendants’ motion for summary judgment that they are not obligated to make contributions to the funds; 4) Plaintiff Local Funds’ motion for summary judgment, joined by the International Funds and the Union, that the auditor’s findings are dispositive of damages for the period between February 20, 2001 and May 31, 2003; 5) Plaintiff Union’s motion for summary judgment dismissing defendants’ counter-claim pursuant to § 8(b)(4)(ii)(B) of the NLRA; 6) Plaintiff International Funds’ motion for summary judgment that the defendants’ tortious interference counter-claim is preempted by ERISA; 7) Plaintiff Local Funds’ motion for summary judgment, joined by plaintiff International Funds, dismissing defendants’ tortious interference claims. For the following reasons, and upon consideration of the parties’ submissions, the motions before the court are granted in part and denied in part. I. Background The record before the court reflects the following summary of undisputed facts giving rise to the present action and the pending motions. The summary excludes any disputed issues of non-material fact and highlights any disputed issues of material fact. A. The Parties Local 7 is a labor organization as defined by the LMRA, 29 U.S.C. § 185, which represents tile setters and tile finishers throughout New York and New Jersey. (Union R. 56.1 Stmt. ¶ 1.) Pursuant to collective bargaining agreements with unions that merged to form plaintiff Local 7, union members participated in various employee benefit funds (together “the Funds” or “plaintiff Funds”). Relevant to this motion are the following plaintiff Funds: a) the Local 52 Pension Fund, the Local 52 Annuity Fund, and the Local 52 Health and Welfare Fund (together, the “Local 52 Funds”); b) the Local 77 Annuity Funds and the Local 77 Health and Welfare Fund (together, the “Local 77 Funds”); and c) the International Health & Welfare Fund (the “International Fund”). Following the filing of this lawsuit, the Local 52 Funds, and the Local 77 Funds merged into “Local Funds.” The plaintiffs in this action filed suit in their official capacities. To the extent that named plaintiffs suing in their official capacities no longer serve in a representative capacity of the Funds or Union, plaintiffs shall substitute new officials within fifteen days of the entry of this order. Fed. R.Civ.P. 25(c). James Bartalone is a trustee of the Local 52 Pension Fund and Bruce Del Turco is a management trustee of the Local Funds. (Del Turco Dep. 5-6, 11-12, 14-15.) Plaintiff Charles Hill was the President of Local 7 from 1993 until his retirement in 2007. (Hill Dep. 11-13.) The defendants in this lawsuit, Speedwell and Speedwell’s president and sole owner, Barry Kolsky (Kolsky Dep. 18-23), are engaged in the business of providing interior work, including tile work and flooring, to both residential and commercial customers in the New York, New Jersey and Connecticut metropolitan areas. (Am. Answer ¶ 111; Local Funds Ex. 1 at 50-53.) B. Additional Background Facts In addition to his role as a trustee of the Local 52 Pension Fund, Bartalone is a member of Local 7 and employed full-time by Local 7 as a business agent. (Bartalone Dep. 11-14.) The duties of business agents include organizing employees, monitoring jobs to ensure employers comply with the terms of their collective bargaining agreements, and obtaining employment for Local 7 members, who inform business agents when they are looking for work. (Bartalone Dep. 75-77; Larweth Dep. 17-19; Hill Dep. 17, 27.) Business agents reported to Charles Hill during his tenure as President of Local 7 from 1993 to 2007. (Bartalone Dep. 34-35; Hill Aff. ¶ 7.) One way in which Bartalone organized employees was by being contacted by subcontractors that had successfully bid union jobs, upon which he would provide subcontractors with a copy of the standard form agreement and discuss the terms of the agreement with the subcontractor. (Bartalone Dep. 18-19.) There were other times that Bartalone was informed that a job was a union job from a third party, such as a subcontractor who lost a bid, and when Bartalone visited the jobsite he would find that non-union labor was being used. (Bartalone Dep. 25.) In those situations, Bartalone would alert the employers to the problem and attempt to organize the workers. (Bartalone Dep. 25.) Bartalone used a pre-printed form agreement reached with the Tile Contractors Associations (TCA) — an association of employers — when acquiring new signatory employers. (Bartalone Dep. 18-19.) Speedwell is not and never was a member of TCA. (Hill Dep. 81.) Generally, according to Hill, when an independent employer, like Speedwell, signed the pre-printed CBAs, it would sign the last page after review of the pre-printed agreement, including the Rider, thereby agreeing to all terms contained in the document. (Hill Aff. ¶ 12.) A contractor that signed a CBA with Local 7 was required to use union labor exclusively when performing covered work, contribute to employee benefit plans timely and in an amount stated in the CBA, and deduct union dues and assessments from an employee’s paycheck as authorized by the employee and forward such sums to the union. (Hill Aff. ¶ 8.) “Covered work” is defined in the agreement by the geographic location of where the work is being performed and the type of work. (Hill Aff. ¶ 14.) Additionally, Local 7 would not allow its members to work alongside non-union employees, and employers who signed contracts with Local 7 were obligated to hire a workforce that consisted of 100 percent union labor. (Hill Aff. ¶ 15.) Non-party Belle Construction Company and Belle (BCC/Belle) is a general contractor that manages construction jobs in New Jersey. BCC/Belle is owned by James Kearney. BCC/Belle maintains a list of approved subcontractors to serve as bidders for its projects. (Kearney Dep. 44-45; MacDonald Dep. 8.) Arthur McCarthy and John Brucker are project managers for BCC/Belle. As project managers, McCarthy and Brucker review bids from subcontractors and select contractors based on price. (McCarthy Dep. 10-12, 27-29; Brucker Dep. 7,19-20, 24-26.) C. Events Giving Rise to the Present Action i. The Edgewater Project In 1997, Speedwell was awarded a bid for tile work at the Edgewater project, for which BCC/Belle was the general contractor and McCarthy was the project manager. (McCarthy Dep. 41-43, 56; Kolsky Dep. 100-101.) At the time that Speedwell was working on the Edgewater project, Local 7 business agents Bartalone and Uzzalino went to the jobsite. (Kolsky Dep. 104.) Kolsky was informed that Bartalone and Uzzalino were at the job site and drove to meet them there. (Kolsky Dep. 104.) When Kolsky arrived, he met Bartalone and Uzzalino in the parking lot outside of the building. (Kolsky Dep. 105.) The Local 7 agents told Kolsky that there were non-union members working at the Edgewater project, that it was a union job, and that Speedwell workers could not work at the job. (Kolsky Dep. 105-07.) Kolsky responded that it was his understanding that the job was “open shop”, ie. a mix of union and non-union labor was permitted, and, further, that he had a contract with the general contractor to fulfill. (Kolsky Dep. 106.) Kolsky suggested that the agents speak to the project manager. (Kolsky Dep. 106.) Kolsky told his workers to stop work until he had further information. (Kolsky Dep. 106.) After the Local 7 agents spoke to McCarthy, McCarthy told Kolsky that his workers could work because it was an open shop. McCarthy directed Kolsky to return the next day. (Kolsky Dep. 108.) When Kolsky returned the next day, McCarthy told him that the Local 7 agents were coming back and that Kolsky would have to work out the issue of his workers not being union members with them. (Kolsky Dep. 110.) When Bartalone and Uzzalino returned, they told Kolsky that if he wanted to continue working on the project he would have to purchase Union books and pay three months of dues. (Kolsky Dep. 111.) Kolsky agreed to do so and returned the next morning at which point he presented the dues to Bartalone and Uzzalino and “signed some papers.” (Kolsky Dep. 112.) After that meeting, Kolsky never heard from Bartalone or Uzzalino, or the Union, until years later. (Kolsky Dep. 113.) Kolsky proceeded to pay the wages he was originally paying, and did not contribute to the benefit funds. (Kolsky Dep. 114.) According to Local 7, the documents that Kolsky signed were collective bargaining agreements — one covering residential work performed by tile setters and one covering residential work performed by tile finishers. (Virginia Deck Exs. 2, 3; Kolsky Dep. Exs. 6, 7; Union R. 56.1 Resp. ¶ 90.) ii. The Waterview Project On December 28, 2000, Speedwell submitted a bid for a subcontract to install tile as part of a commercial construction project on Waterview Boulevard in Parsippany, New Jersey (“Waterview project”), which was managed by BCC/Belle. Speedwell was awarded the job. (Kolsky Dep. 121.) Prior to the start of the tile work at this job, Bartalone was informed through a third party that there was work being done at Waterview and went to the jobsite. (Bartalone Dep. 70.) He was informed by the supervisor on the job that it was completely union and that Speedwell was awarded the contract. (Bartalone Dep. 70.) Bartalone then testified that Kolsky called him soon after his visit and asked him for a team for the Waterview job. (Bartalone Dep. 70-71.) Bartalone called two workers for Kolsky. (Bartalone Dep. 74.) On the day the tile workers started, Bartalone went to the jobsite and met Kolsky to sign the agreement. (Bartalone Dep. 79-80.) When Bartalone arrived at the jobsite he saw that Kolsky had two non-union workers working, in addition to the two workers that Bartalone sent. (Bartalone Dep. 80.) Bartalone proceeded to tell Kolsky that Local 7 members do not work side-by-side with non-union workers and “with that, [Kolsky] signed up the two [other] gentlemen that were there.” (Bartalone Dep. 80.) Kolsky’s testimony differed significantly from Bartalone’s regarding the Waterview project. Kolsky testified that shortly after the tile work started in February 2001, Kolsky, who was in his office, received a phone call from the jobsite informing him that there were two Union representatives, one of whom was Bartalone, at the jobsite. (Kolsky Dep. 147.) Kolsky went to the jobsite to meet the Union representatives. (Kolsky Dep. 148.) Bartalone told Kolsky that the job was a “Union job and you have non-union guys on the job and you can’t work.” (Kolsky Dep. 149.) Bartalone and Kolsky negotiated an agreement that allowed Speedwell’s subcontractor’s workers in the union — “similar to what we did in Edgewater” — and that Kolsky would have to take an equal amount of workers out of the union hall and pay everyone union rate. (Kolsky Dep. 149-150.) Kolsky directed the workers to stop working for that day. On the following business day, Kolsky signed “another pile of papers that at that point [he] assume[d] was a project labor agreement for that job because [he] was signing more of the same kind of stuff that [he] had in the past” and wrote a check for the Union books, and his workers resumed work. (Kolsky Dep. 151-152.) This paperwork included two collective bargaining agreements, both of which covered commercial work, one for tile layers, the other for tile finishers. Kolsky signed the paperwork on Speedwell’s behalf. (Virginia Decl. Exs. 10, 11; Kolsky Dep. Exs. 10,11.) Kolsky and Bartalone testified that after signing the paperwork, Kolsky bought everyone coffee. (Kolsky Dep. 152.) Union worker Daniel Larweth, who was present at the time of these events, stated that “there was no tension” in the room and that “everybody was happy.” (Larweth Dep. 15, 25-27.) Larweth stated that when Bartalone arrived at the Waterview job that day “he wasn’t upset. He wasn’t screaming. He wasn’t yelling.” (Larweth Dep. 26-27.) The February 2001 agreements bear handwritten alterations. (Virginia Decl. Exs. 10, 11.) On the front cover page of the agreements, handwritten at the top is “Speedwell Design” and the number “1” was handwritten over the last digit in the phrase “From May 5,1997 to May 4 2000,” thus modifying the final date to May 4, 2001. Both Bartalone and Kolsky testified that these writings on the front cover page were not in their handwriting. (Kolsky Dep. 159, 161; Bartalone Dep. 218-219.) Hill testified that these cover-page alterations were in the Secretary/Treasurer’s handwriting, although he did not see him make the changes. (Hill Dep. 174-176.) On the signature page of the agreements, “May 2000 to May 2003” is handwritten at the top. Bartalone testified that he wrote “May 2000 to May 2003” on the top of the signature pages of the agreements. (Bartalone Dep. 90, 218.) Kolsky testified that his initials appear next to Bartalone’s handwritten dates at the top and that his signature appears on the last page of the agreements, and that Kolsky handwrote Speedwell’s name and address, and his name. (Kolsky Dep. 156-158,160-161.) Local 7 asserts, and defendants deny, that these agreements are two collective bargaining agreements — one covering all tile setters and apprentices employed by Speedwell and the other covering all tile finishers employed by Speedwell. (Virginia Decl. Exs. 10, 11: Kolsky Dep. Exs. 10, 11.) Neither agreement specifically referred to the Waterview project or any other particular project. (Local Funds R. 56.1 Stmt. ¶ 20.) Each agreement required that Speedwell make specified contributions to the benefits funds for each hour of covered tile work. (Virginia Decl. Ex. 10, Art. Ill, XVII-XX, Rider & Ex. 11, Art. II, XII-XIII.) Pursuant to the agreements, Speedwell made contributions to the Funds for work performed on the Waterview Project in February, March and April 2001. (Kolsky Dep. 183-87.) iii. Grand Commons Project During the Waterview project, Kolsky mentioned to Larweth that he might need help on another small job in the fall, the Grand Commons project, unrelated to Waterview. (Kolsky Dep. 188-89.) Speedwell performed work on the Grand Commons project in September 2001. (Kolsky Dep. 191-195.) Kolsky called Larweth and requested his assistance on the Grand Commons project. (Larweth Dep. 33.) Larweth requested permission to work on the project from Bartalone, who approved him. (Larweth Dep. 33.) Larweth understood the job to be all union contractors. (Larweth Dep. 33.) Speedwell made benefit contributions for the work performed by Local 7 members on this project and certified to the International Pension Fund that its contributions related to work performed that month “under the current applicable provisions of the collective bargaining agreement and the provisions of the applicable trust agreements.” (Kolsky Dep. 193-195; Virginia Decl. Exs. 22-23.) Speedwell and Local 7 did not enter into an additional agreement with reference to the Grand Common job. (Local Funds R. 56.1 Stmt. ¶ 27.) Following the Grand Commons job, Plaintiff Funds continued sending remittance forms to Speedwell and Speedwell continued to submit remittance reports to the International Pension Fund for every month from October 2001 through December 2002, all of which certify that no work was performed, and, therefore, no contribution need be made. (Virginia Decl. Exs. 24-26.) The parties dispute whether no covered work was performed and if the Funds ever contacted Speedwell regarding this issue. (See Speedwell R. 56.1 Stmt. ¶ 122; Int. Funds R. 56.1 Resp. ¶ 122.) iv. Hudson Point Project In 2002, BCC/Belle served as general contractor on a project known as Hudson Point. The project was an “open-shop” project and managed by McCarthy. (Kearney Dep. 51-52; McCarthy Dep. 74.) McCarthy selected Speedwell to do the tile, painting and carpeting work. (McCarthy Dep. 65, 68-69, 72; Bartalone Dep. 99.) Speedwell began performing tile work in May 2002. (McCarthy Dep. 79.) Speedwell subcontracted its tile work to Unlimited Tile for the installation. (Velikiy Dep. 59-62; Bartalone Dep. 99.) After receiving a phone call from a union contractor about the identity of the tile contractor to whom the Hudson Point bid was awarded, Bartalone went to the Hudson Point jobsite. (Bartalone Dep. 91-92, 95, 97.) When he arrived, Bartalone approached an individual who told him who was doing the tile work and “that was the extent of the conversation.” (Bartalone Dep. 97.) Timur Velikiy, of Unlimited Tile, testified that he spoke to Bartalone when Bartalone visited Hudson Point. Velikiy testified that Bartalone told Velikiy that Unlimited Tile was not supposed to be working at Hudson Point. (Velikiy Dep. 145-147.) Velikiy testified that he “was threatened physically and mentally” and that Bartalone was a “bully.” (Velikiy Dep. 145-147.) Bartalone testified that after he spoke with an unnamed individual (perhaps Velikiy) at Hudson Point he went to McCarthy’s office, in the basement of the jobsite. McCarthy told Bartalone that Speedwell was doing tile work, and Bartalone stated that Speedwell’s use of non-union labor was a problem because of the contract between Speedwell and Local 7. (Bartalone Dep. 92-93, 98-100.) According to McCarthy, he told Bartalone that the job was “open shop” and that he should take the problem to Kolsky. (McCarthy Dep. 98-100.) Bartalone testified that McCarthy said he would call Kolsky. (Bartalone Dep. 100.) McCarthy testified that Bartalone stated “you’re going to get a picket line.” (McCarthy Dep. 99.) Based on the record before the court, Bartalone did not testify that he made such statement to McCarthy, or deny that he did so. (Bartalone Dep. 98-101.) The parties dispute the characterization of Bartalone’s statement, as testified to by McCarthy, that they would get a picket line. (See Speedwell R. 56.1 Stmt. ¶ 131; Union R. 56.1 Resp. ¶ 131.) The parties also dispute whether Bartalone ever met with Kolsky regarding the Hudson Point project. (See Bartalone Dep. 129; Kolsky Dep. 240-41, 243.) The day after Bartalone’s conversation with McCarthy, the painters’ union put up a picket line. The painters’ union took down its picket line after an agreement was reached whereby the union members would work side-by-side with non-union workers. (Bartalone Dep. 112-116, 122-25.) McCarthy then attempted to resolve the issue between Local 7 and Speedwell. (Bartalone Dep. 113-114; McCarthy Dep. 111-114.) McCarthy testified that Bartalone stated that “he’s not solving the problem. He’s going to put them [Speedwell] out of business.” (McCarthy Dep. 114.) This message was relayed to Kolsky by McCarthy. (McCarthy Dep. 117-119; Kolsky Dep. 461.) On the record before the court, Bartalone did not testify that he made this statement or deny that he did so. Bartalone testified that he told McCarthy that he “[did]n’t work that way,” referring to the deal struck between the painters’ union and McCarthy in which the painters’ union workers would work side-by-side with non-union workers. (Bartalone Dep. 113.) Speedwell continued to perform at Hudson Point with a subcontractor, Unlimited Tile, which hired non-union workers. Neither Speedwell nor Unlimited Tile contributed to the Funds on behalf of those workers. (Local Funds R. 56.1 Stmt. ¶¶ 32-33.) There is no evidence that the plaintiff Union picketed the Hudson Point jobsite. v. TravelLodge Project BCC/Belle was the general contractor on the renovation of the TravelLodge Hotel in Livingston, New Jersey. (Kearney Dep. 51-52.) Brucker was the project manager for BCC/Belle and the project was open shop. (Brucker Dep. 30-31, 58.) In approximately September 2002, Speedwell began tile work at the TravelLodge project. (Brucker Dep. 46, 63; Kearney Dep. 51-53.) Bartalone visited the TravelLodge project and asked the supervisor which entity was doing the tile work, and the supervisor responded, Speedwell and Krisstone, another contractor. Bartalone testified that he told the BCC/Belle representative that Local 7 had a “problem” with the use of Speedwell for the tile work but did not elaborate as to why. (Bartalone Dep. 149-50.) The reason that Bartalone had a problem with Speedwell doing the work was because it was using non-union labor. (Bartalone Dep. 92.) The parties do not dispute that Speedwell was using non-union labor. (Local Funds R. 56.1 Stmt. ¶ 38.) Later, Bartalone revisited the jobsite because Krisstone notified him that “someone” was doing tile work at night. (Bartalone Dep. 150-153.) When Bartalone revisited the jobsite, he found that the entire job had been completed by Speedwell at night. (Bartalone Dep. 150-153.) Bartalone spoke to someone from BCC/Belle and advised him that Speedwell was a union contractor. (Bartalone Dep. 154.) Speedwell alleges that Bartalone threatened that Local 7 would disrupt the work at the TravelLodge site by engaging in a job action if BCC/Belle continued using Speedwell as a subcontractor. (Local Funds R. 56.1 Stmt. ¶ 39; Speedwell R. 56.1 Resp. [Local Funds] ¶ 39.) Bartalone testified that he did not threaten a job action or file a grievance. (Bartalone Dep. 155.) The parties dispute whether Bartalone’s statements to Brucker were threats. (Speedwell R. 56.1 Stmt. ¶ 191; Union R. 56.1 Resp. ¶ 191.) Speedwell was not awarded the next phase of the TravelLodge project. (Brucker Dep. 74.) Brucker testified that “if Jim Bartalone had not come to the project and the so-called disruption had not occurred,” Brucker would have “not absolutely, but possibly or probably, since he was already on the project” awarded the next phase of the project to Speedwell. (Brucker Dep. 74.) If another contractor had outbid Speedwell, Brucker would have given Speedwell an opportunity to revise its bid. (Brucker Dep. 75-76.) The parties dispute the value of this alleged lost opportunity. (Speedwell R. 56.1 Stmt. ¶ 196; Local Funds R. 56.1 Resp. ¶ 196; Union R. 56.1 Resp. ¶ 196.) Furthermore, the tile work at the TravelLodge lobby was the sole work that BCC/Belle did not consider awarding to Speedwell. Thereafter, BCC/Belle awarded Speedwell work involving installation of granite counter-tops in the main lobby. (Brucker Dep. 205-07, 259-61.) Speedwell made no contributions to the Funds in connection with the TravelLodge Project. (Kolsky Dep. 308-314.) vi. Pursuit of Speedwell’s Alleged Contribution Delinquencies After the meeting with McCarthy at the Hudson Point Project jobsite in May 2002, Bartalone spoke with Hill, Local 7’s President, about the situation with Speedwell. (Bartalone Dep. 126.) Bartalone did not take any steps to ascertain if Speedwell had not paid contributions for several months, but Bartalone was aware that “Speedwell was doing tile work without paying contributions.” (Bartalone Dep. 167.) The parties dispute whether Bartalone and Hill had knowledge of delinquencies at that time. (See, Speedwell R. 56.1 Stmt. ¶ 185; Local Funds R. 56.1 Resp. ¶ 185.) Bartalone and/or Hill called Charles Virginia, collection counsel. (Bartalone Dep. 126-127; Hill Dep. 107-112.) Bartalone did not contact the labor lawyer because to him “it was a funds issue.” (Bartalone Dep. 127.) The parties dispute whether the matter was properly referred to collection counsel, pursuant to the Local Funds’ delinquency procedures. (Friedman Cert. Ex. 14.) At the time that Virginia was contacted, Bartalone was a trustee of the Local 52 Funds and Hill was not a trustee of the Local 52, Local 77 or the International Pension Fund (“IPF”); Hill was a member of the Collection Committee that served the Local 52 Funds, Local 77 Funds, and Local 88 Funds. (Bartalone Dep. 134-137; Hill Dep. 6-7.) Bartalone did not authorize Virginia to do anything on behalf of the International Funds. (Bartalone Dep. 134.) Neither Hill nor Bartalone contacted Del Turco, the International Funds, or the Local 77 Funds before contacting Virginia. (Bartalone Dep. 126-29; Hill Dep. 114; Del Turco Dep. 139-141; Marks Dep. 46-73.) The Local Funds have a collection policy pursuant to which legal counsel pursue delinquencies. (Friedman Ex. 14.) The process that governs collection does not require authorization from trustees to institute litigation. (Del Turco Aff. ¶ 8.) Virginia has been authorized to seek recovery for the IPF and his activities are monitored by IPF counsel to ensure compliance with the Central Collection Unit (“CCU”) procedures. (Stuper Decl. ¶ 20.) On occasion, the collection attorney is authorized to take action before exhausting CCU procedures. (Stuper Decl. ¶ 37.) After being contacted by Bartalone and/or Hill, Virginia wrote a letter to Speedwell dated May 23, 2002, on behalf of Local 52 Funds, the Local 77 Funds, and the International Funds, asserting that Speedwell had not made benefit contributions to the funds “for many months in violation of your collective bargaining agreements.” (Friedman Cert. Ex. 15.) Del Turco was unaware that Virginia sent this letter. (Del Turco Dep. 139-141.) The parties dispute whether Speedwell was actually delinquent at the time the letter was sent. (See Speedwell R. 56.1 Stmt. ¶ 175; Local Funds R. 56.1 Resp. ¶ 175.) The 2001 agreements do not provide a remedy if the Funds do not follow their own collection procedures. On June 27, 2002 Virginia wrote a letter to BCC/Belle on behalf of Plaintiff Funds which stated “We respectfully request that BCC/Belle withhold any and all monies due Speedwell and contact us to discuss the possibility of a joint checking arrangement.” (Virginia Decl. Ex. 13.) Virginia spoke with Marks, a CCU investigator employed by the International Union (affiliated with the International Fund), called BCC/Belle and left a voice-mail concerning Speedwell. On October 2, 2002, Marks sent a letter to BCC/Belle concerning Speedwell on behalf of the IPF. (Marks Dep. 60-61.) The letter requested that BCC/Belle withhold monies it would normally pay to Speedwell pursuant to tile subcontracts. (Virginia Decl. Ex. 16.) Marks has no affiliation with Local 7, but included Local 7 in his letter as a result of his conversation with Virginia. (Marks Dep. 67-71.) The parties dispute whether Marks reviewed documents or conducted any investigation to ascertain whether Speedwell was required to make benefit contributions, or if he relied solely on Virginia’s recitations. (Speedwell R. 56.1 Stmt. ¶ 205-206; Int. Fund R. 56.1 Resp. ¶ 205-206.) D. Plaintiffs’ Alleged Damages The Local Funds retained Marshall & Moss in the fall of 2005 to conduct an audit of Speedwell for the period between February 20, 2001 and May 31, 2003 to ascertain a measure of damages. (Moss Dep., 116, 119-20, 170, 173, 187-88.) Marshall & Moss began work on the audit by December 2005. (Virginia Decl. Ex. 34.) The objective of the audit was to ascertain whether and to what extent Speedwell’s payments to its subcontractors circumvented obligations to the Local Funds. (Moss Dep. 189-195.) This required first estimating the amount of hours of covered work, and then multiplying those hours by the applicable contribution rate. Speedwell used subcontractors to perform most of its tile installation and neither Speedwell nor the subcontractor maintained records of the number of hours worked. (Velikiy Dep. 29-30; Moss Dep. 118.) As a result, to estimate the number of hours worked, the audit required Marshall & Moss to first estimate the labor costs for covered work based on subcontractor invoices and then estimate the number of unreported hours by dividing the labor costs with an hourly wage rate. With regard to the Speedwell audit, Marshall & Moss examined disbursements and invoices to determine if an employer was hiding “covered work” and would exclude subcontractors whose employees were covered by collective bargaining agreements. (Moss Dep. 63-69.) Although Moss did not check to see if Speedwell’s subcontractors had collective bargaining agreements, Unlimited Tile, a Speedwell subcontractor, was not a party to a collective bargaining agreement. (Velikiy Dep. 59; Moss Dep. 196-197.) Marshall & Moss then reduced subcontractor invoices by amounts attributable to materials, and attributed the remaining amount to labor covered by the agreements with Local 7. (Moss Dep. 63-66.) Invoices that did not specifically parse out materials were attributed solely to labor. (Moss Dep. 63-66.) By including the entire non-material portion of an invoice in the calculation of unreported hours, Marshall & Moss did not account for a subcontractor’s profit, insurance, bonding, or other expenses. (Speedwell R. 56.1 Stmt. ¶ 276.) There is no evidence that Speedwell contractors had insurance, bonding, or other expenses. (Local Funds R. 56.1 Resp. ¶ 276.) Unlimited Tile, provided some materials on its jobs, and built a profit margin of between twenty and thirty percent into its invoices. (Speedwell R. 56.1 Stmt. ¶¶ 277-278.) Marshall & Moss included in its calculations of unreported hours “rip-up” work, which is not covered work. (Speedwell R. 56.1 Stmt. ¶ 281.) In calculating the hours from the invoices of subcontractors, Marshall & Moss used different wage rates for tile setters and tile finishers. (Speedwell R. 56.1 Stmt. ¶ 285.) To calculate the contributions owed, Marshall & Moss used standard rate tables provided by the Local Funds to apply to unreported hours without considering that a particular collective bargaining agreement between Local 7 and a given employer contained different rates. There is a dispute as to whether the rate tables used in the audit are consistent with those established in the agreements. (Speedwell R. 56.1 Stmt. ¶ 260; Union R. 56.1 Resp. ¶ 260.) The audit calculated that Speedwell was delinquent on a total of 29 funds. (Virginia Deck Ex. 20, 21.) Additionally Marshall & Moss charged ten percent interest and liquidated damages of twenty percent as permitted by ERISA on all deficiencies. Some of the funds covered by the Speedwell audit are not ERISA-covered funds. (Moss Dep. 150-52.) E. Speedwell’s Alleged Damages Speedwell seeks to collect lost profits in the amount of $1,929,120.60, alleging that it would have been awarded contracts by BCC/Belle but for the alleged unlawful conduct of the plaintiffs at the Hudson Point and TravelLodge sites, respectively in May 2002 and September 2002. Prior to 2006, BCC/Belle’s president and owner, James Kearney, did not instruct anyone at BCC/Belle to refrain from awarding work to Speedwell and did not recall any project managers informing him that Speedwell was not being awarded work because of Union problems. (Kearney Dep. 20.) Additionally, McCarthy never refrained from soliciting bids from Speedwell due to the labor dispute at Hudson Point. Despite not awarding the contract to Speedwell for additional phases of the TravelLodge project, Brucker recommended Speedwell to MacDonald, a fellow BCC/Belle project manager. (MacDonald Dep. 27-29.) Speedwell’s calculation of damages is based on eight projects that it bid on but that it was not awarded. On one of these projects, BCC/Belle was not the general contractor and did not have responsibility for soliciting bids or awarding contracts. On another one of the projects, Speedwell declined to submit a bid. (Union Notice of Mot. Ex. 15.) Additionally, Speedwell’s bids on other projects were higher than other contractors to whom the jobs were awarded. (Union R. 56.1 Stmt. ¶¶ 43-51.) Ultimately, Kearney testified that he decided to remove Speedwell from the list of bidders in 2006 because of the time, money, and inconvenience this litigation had imposed on BCC/Belle, a non-party. (Kearney Dep. 69.) II. Summary Judgment Standard A court may grant summary judgment only “if the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that the moving party is entitled to a judgment as a matter of law.” Fed.R.Civ.P. 56(c). “[T]he mere existence of some alleged factual dispute between the parties will not defeat an otherwise properly supported motion for summary judgment; the requirement is that there be no genuine issue of material fact.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247-48, 106 S.Ct. 2505, 91 L.Ed.2d 202 (1986) (emphasis in original). “A fact is ‘material’ for these purposes when it ‘might affect the outcome of the suit under the governing law.’ ” Jeffreys v. City of New York, 426 F.3d 549, 553 (2d Cir.2005). “An issue of fact is ‘genuine’ if ‘the evidence is such that a reasonable jury could return a verdict for the nonmoving party.’ ” Id. Moreover, no genuine issue of material fact exists “unless there is sufficient evidence favoring the nonmoving party for a jury to return a verdict for that party. If the evidence is merely colorable, ... or is not significantly probative, ... summary judgment may be granted.” Anderson, 477 U.S. at 249-50, 106 S.Ct. 2505 (internal citations omitted). In deciding a motion for summary judgment, the court’s function is not to resolve disputed issues of fact, but only to determine whether there is a genuine issue to be tried. Anderson, 477 U.S. at 249, 106 S.Ct. 2505. The moving party carries the burden of demonstrating the absence of a genuine issue of material fact. Celotex Corp. v. Catrett, 477 U.S. 317, 323, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986). The court must construe the facts in the light most favorable to the nonmoving party and all reasonable inferences and ambiguities must be resolved against the moving party. Flanigan v. Gen. Elec. Co., 242 F.3d 78, 83 (2d Cir.2001). Nevertheless, the nonmoving party cannot rest on “mere allegations or denials” but must instead “set forth specific facts showing there is a genuine issue for trial.” Fed.R.Civ.P. 56(e); see also Harlen Assocs. v. Incorporated Vill. of MineOla, 273 F.3d 494, 499 (2d Cir.2001) (“[M]ere speculation and conjecture is [sic] insufficient to preclude the granting of the motion.”); Nat’l Westminster Bank USA v. Ross, 676 F.Supp. 48, 51 (S.D.N.Y.1987) (“Speculation, conclusory allegations, and mere denials are not enough to raise genuine issues of fact.”). Nor can the nonmoving party rest only on the pleadings. Celotex, 477 U.S. at 324, 106 S.Ct. 2548 (stating that Fed.R.Civ.P. 56(e) “requires the non-moving party to go beyond the pleadings”); Davis v. New York, 316 F.3d 93, 100 (2d Cir.2002). Instead, each statement of material fact by the movant or opponent must be followed by citation to evidence which would be admissible, as required by Fed.R.Civ.P. 56(e) and Local Civil Rule 56.1(d). When cross-motions for summary judgment are made the standard is the same as that for individual motions for summary judgment. See Morales v. Quintel Entm’t, Inc., 249 F.Bd 115, 121 (2d Cir.2001). Each motion must be considered independently of the other and, when evaluating each, the court must consider the facts in the light most favorable to the non-moving party. Id. III. Defendants’ Summary Judgment Motions to Dismiss Plaintiffs Union’s and Funds’ Claims A. Defendants’ Argument that Speedwell is not Liable to the Union or Funds because the Contract is Void Generally, “[a] party is bound by a contract it has signed,” Hetchkop v. Woodlawn at Grassmere, Inc., 116 F.3d 28, 34 (2d Cir.1997), “regardless of his or her failure to read and understand its terms.” Ecoline, Inc. v. Local Union No. 12, 271 Fed.Appx. 70, 72 (2d Cir.2008). Kolsky’s signature appears on the final page of the 2001 Setters and Helpers Agreements. Regardless, defendants argue that the 2001 agreements are not valid collective bargaining agreements because 1) the contracts signed by Kolsky are ambiguous and the intent of the parties demonstrates that these agreements were project agreements, not collective bargaining agreements; and 2) the agreements are void because Local 7 procured Kolsky’s signature through fraud in the execution. Consequently, the defendants argue that the contracts do not bind them to pay union-scale wages or contribute to benefits funds and that summary judgment should be granted in their favor. i. Ambiguity of the Contracts Defendants argue that the agreements signed by Kolsky are ambiguous, were only for the Waterview job, and did not bind Speedwell beyond that job. Defendants assert that the court may thus consider the intent of the parties to determine whether the agreements are single project agreements. Plaintiff Funds’ cross-motion for summary judgment asserts that the contracts unambiguously require Speedwell to contribute to the Funds. Whether a contract is ambiguous is a question of law. Haber v. St. Paul Guardian Ins. Co., 137 F.3d 691, 695 (2d Cir.1998). Unless the court gleans some ambiguity from looking at the face of the contract, it will not look beyond the contract’s four corners. Am. Home Prods. Corp. v. Liberty Mut. Ins. Co., 748 F.2d 760, 765 (2d Cir.1984); see also Rosenblatt v. Christie, Manson & Woods Ltd., 195 Fed.Appx. 11, 12 (2d Cir.2006). A contract provision is ambiguous “ ‘when it is reasonably susceptible to more than one reading.’ ” Haber, 137 F.3d at 695. The court gives unambiguous contract terms their plain meaning. Krumme v. WestPoint Stevens Inc., 238 F.3d 133, 139 (2d Cir.2000); see also Rosenblatt, 195 Fed.Appx. at 12. In this instance, the court looks to the face of the contracts to determine whether they were ambiguous as to their application beyond the Waterview project. Both the Tile Setters and Tile Finishers agreements make reference to the union as the “collective bargaining agents” for the employees. Nothing in the agreements indicates that they were job specific. The agreements never mention the Water-view project, or even generieally refer to a specific job, by stating, for example, “the job” or “the project.” Additionally, the terms of the contracts contemplate their application to multiple jobs for which the employer might need labor. Without reference to a specific job, the terms of the agreements govern an on-going relationship between the employer and Local 7 and provide the guidelines for notifying the union of the employer’s jobs before starting a particular job and requesting workers from the union. These terms would not be necessary if the contract only applied to the Waterview project, which was already in progress. Additionally, the Tile Setters contract states “If and when the employer shall perform any work of the type covered by this agreement ....” (emphasis added). The use of “if and when” does not suggest any intention to exclude the Waterview project, which was already in progress at the time the agreement, but also indicates the contract’s application to future jobs. Additionally, the defendants have not directed the court to terms which may support the conclusion that the contracts’ application is ambiguous. Instead, the defendants urge that Kolsky’s intent to be bound to the contracts only for the Water-view project creates a disputed issue as to the validity of the contract. However, the court will not look at evidence of intent unless it determines that the contracts are ambiguous. The court holds they are not. Furthermore, there is nothing in the record indicating that Kolsky intended to limit the agreements to the Waterview project at the time he signed the agreements or expressed as much to Local 7. Kolsky’s undisclosed intent is not a material issue. Robbins v. Lynch, 836 F.2d 330, 332 (7th Cir.1988). Accordingly, the court denies defendants’ motion for summary judgment' on the grounds that the contracts are ambiguous and limited to the Waterview project. Additionally, the Plaintiff Funds’ motion for summary judgment that the contracts unambiguously require Speedwell to contribute to the benefit funds is granted. Article III of the Tile Setters Agreement and Article III of the Tile Finishers Agreement set forth Speedwell’s obligation to contribute to certain benefit funds. The extent of this obligation is discussed in Part IV.A, infra, with regard to the parties’ cross-motions for summary judgment on the issue of liability. ii. Fraud in the Execution Defendants argue that summary judgment should be granted in their favor because the agreements are void for fraud in the execution. The court notes that the defendants’ Answer failed to plead this defense with the particularity required by Rule 9(b) of the Federal Rule of Civil Procedure. Nevertheless, the court considers defendants’ assertion of this defense in their motion for summary judgment a constructive amendment to their Answer. See Anthony v. City of New York, 339 F.3d 129, 138 n. 5 (2d Cir.2003) (“Although affirmative defenses ... must be pleaded in response to a pleading, see Fed.R.Civ.P. 8(c), the district court may, in its discretion, construe a motion for summary judgment as a motion pursuant to Fed.R.Civ.P. 15(a) for leave to amend the defendant’s answer.”). “Fraud in the execution occurs where there is a ‘misrepresentation as to the character or essential terms of a proposed contract,’ and a party signs without knowing or having a ‘reasonable opportunity to know of its character or essential terms.’ ” Hetchkop, 116 F.3d at 32 (citations omitted). In order to prevail on such a defense, a party is not absolved of “the basic responsibility ... to review a document before signing it” and must show “excusable ignorance of the contents of the writing signed.” Id. at 32, 34 (internal quotations omitted). Proving excusable ignorance “requires a showing that the party satisfied its basic responsibility of reading what it signed.” Bricklayers and Allied Craftworkers Local 2, et al. v. C.G. Yantch, Inc. et al., 316 F.Supp.2d 130, 147 (N.D.N.Y.2003). Examples of fraud in the execution include a party’s substitution of one type of document for another, and the substitution of a new document of the same kind as the one previously read and agreed to by the other party, but containing materially different terms. Hetchkop, 116 F.3d at 32. Defendants’ argument that Kolsky’s signature was procured with fraud does not rely on Kolsky’s testimony that he read and signed agreements that were materially different than the agreements at issue. Instead, defendants rely primarily on Hill’s testimony that the handwriting on the cover of the agreements was made by the union’s Secretary/Treasurer after the parties signed the agreements. However, the alterations on the cover page are not “essential terms” of the contract. These alterations simply indicate that the agreement is with Speedwell and extends the agreement until 2001, the start date of the contract between Speedwell and Local 7. Without this page, the signature page— signed by Kolsky — would supply this information, namely, the parties to the agreement and its temporal term. Defendants also point to the fact that there are two “Article XXVIIs” as evidence that “casts serious doubt as to whether that document represents the papers actually signed by Speedwell on the Waterview jobsite.” (Def. Mem./Opp. [Local Funds] at 16.) Even if defendants could and did establish, rather than speculate, that these Articles were added after Kolsky’s signature, this fact would not support a claim of fraud in the execution. The defendants have not presented evidence in the record indicating that Local 7 misrepresented the terms contained in these articles to Kolsky. Additionally, there is nothing in the record to suggest that the terms contained in either one or both of the articles substituted any essential term that Kolsky thought he was agreeing to but, in fact, was not. Furthermore, even assuming that a material inconsistency exists between the document Kolsky signed and the added notations, defendants have not presented any facts in the record supporting an inference of “excusable ignorance.” Kolsky did not testify that he read the agreements that he signed at the Waterview project, and thus has not established what his understanding of the agreements was or what the purported misrepresentation was. Indeed, his testimony easily lends itself to the inference that he did not, in fact, read the papers. Kolsky merely stated that he “assumed” that the papers he signed in 2001 were of the same kind he signed in 1997. Defendants have not articulated any basis or provided any evidence in the record to support a reasonable inference that Kolsky did not have the opportunity to read the documents prior to signing them. The undisputed facts regarding the circumstances surrounding the signing of the agreement do not establish that Kolsky was deprived of the opportunity to review the documents, given that Kolsky is a college graduate who has worked for Speedwell since 1982 and had time to buy everyone coffee immediately after the agreement was signed. “If, as to the issue on which summary judgment is sought, there is any evidence in the record from which a reasonable inference could be drawn in favor of the opposing party, summary judgment is improper.” Hetchkop, 116 F.3d at 33. Because the only reasonable conclusion that could be drawn based on the record before the court is that the contract was not fraudulently executed, defendant’s motion for summary judgment on this basis is denied. Furthermore, unless, within fifteen days of entry of this order, defendants can supplement the record before the court with admissible evidence produced during discovery, which was closed oh December 30, 2007 (Minute Entry 9/20/07), that raises a genuine issue of material fact that the contract was executed without fraud, summary judgment will be entered in favor of the non-moving parties. “[Djistrict courts are widely acknowledged to possess the power to enter summary judgments sua sponte, so long as the losing party was on notice that she had to come forward with all of her evidence.” Celotex, 477 U.S. at 326, 106 S.Ct. 2548. A district court’s independent raising and granting of summary judgment in favor of the nonmoving party is “ ‘an accepted method of expediting litigation’.” Ramsey v. Coughlin, 94 F.3d 71, 74 (2d Cir.1996) (citing Coach Leatherware Co. v. AnnTaylor, Inc., 933 F.2d 162, 167 (2d Cir.1991)). Further, although the district court must take care “to determine that the party against whom summary judgment is rendered has had a full and fair opportunity to meet the proposition that there is no genuine issue of material fact to be tried,” Ramsey, 94 F.3d at 73-74, a court need not give notice of its intention to enter summary judgment against the moving party. Coach, 933 F.2d at 167. Here, discovery closed prior to the filing of parties’ motions for summary judgment and the court finds that the facts are fully developed so that the defendants will suffer no procedural prejudice. While the court is mindful that defendants’ proof on their motion for summary judgment did not necessarily include all evidence that might be presented at trial, “prejudice is greatly diminished [because] the court’s sua sponte determination is based on issues identical to those raised by the moving party.” Id. at 167. Defendants, “had every incentive to put forward any compelling evidence in support of their summary judgment motion since the law prevents] the district court from drawing favorable inferences on their behalf.” Id. at 167-68. Furthermore, defendants are in the best position to establish the elements of their fraud in the execution defense and are hereby being granted a “full and fair opportunity to meet the proposition that there is no genuine issue of material fact to be tried.” Ramsey, 94 F.3d at 73-74. “Absent some indication that the moving party might otherwise bring forward evidence that would affect the court’s summary judgment determination,” the court will grant summary judgment in favor of plaintiffs. Coach, 933 F.2d at 167. B. Defendants’ Argument that the Union Lacks Associational Standing Defendants argue that the Union lacks standing to recover unpaid wages allegedly owed to its members for tile contracts performed by Speedwell because it lacks associational standing. The Supreme Court in Hunt v. Washington State Apple Adver. Comm’n, 432 U.S. 333, 343, 97 S.Ct. 2434, 53 L.Ed.2d 383 (1977), articulated the following three prong test that an organization must meet to have standing to sue on behalf of its members: “(a) [the organization’s] members would otherwise have standing to sue in their own right; (b) the interests [the organization] seeks to protect are germane to the organization’s purpose; and (c) neither the claim asserted nor the relief requested requires the participation of individual members in the lawsuit.” Id. at 343, 97 S.Ct. 2434. Defendants argue that the Union does not meet the third prong of the associational standing test provided in Hunt. According to the defendants, because the calculation of individual members’ wages would necessarily require the participation of individuals, the union cannot meet this prong, and, therefore, lacks associational standing. (Def. Mem./Opp. [Union] at 12-14.) As the plaintiff Union correctly points out, the Supreme Court has held that “there is every reason to recognize the union’s standing to vindicate employee rights under a contract the union obtained” and “there is no merit to the contention that a union may not sue to recover wages or vacation pay claimed by its members pursuant to the terms of a collective bargaining contract.” Int'l Union v. Hoosier Cardinal Corp., 383 U.S. 696, 699, 86 S.Ct. 1107, 16 L.Ed.2d 192 (1966). Moreover, the language of § 301 of the LMRA makes clear that a union has such standing. It states, “[a]ny ... labor organization may sue ... in behalf of the employees whom it represents in the courts of the United States.” 29 U.S.C. § 185(b). Congress’ specific grant of union standing renders the third prong of the Hunt associational standing test inapplicable. See United Food and Commercial Workers Union Local 751 v. Brown Group, Inc., 517 U.S. 544, 555-56, 116 S.Ct. 1529, 134 L.Ed.2d 758 (1996). The defendants’ motion for summary judgment that the union lacks associational standing is denied. C. Defendants’ Argument that the Union’s Claims are Barred by the Statute of Limitations Relying on DelCostello v. Int'l Bhd. of Teamsters, 462 U.S. 151, 171, 103 S.Ct. 2281, 76 L.Ed.2d 476 (1983), defendants contend that the plaintiff Union’s claims, which allege violations of § 301 of the LMRA, are barred by the six-month statute of limitations for bringing unfair labor practice claims pursuant to § 10(b) of the NLRA. Defendants assert that plaintiff Local 7 did not take any action to enforce the collective bargaining agreements until one year after the alleged incidents giving rise to the claim and, therefore, the action should be dismissed as time-barred. Plaintiff Union argues that the Supreme Court’s decision in Hoosier Cardinal Corp., 383 U.S. 696, 86 S.Ct. 1107, 16 L.Ed.2d 192 (1966), is controlling because its claim is a straightforward breach of contract suit under § 301 of the LMRA and the six-year statute of limitations, borrowed from New York contract law, governs the action. Int. Union v. Hoosier Cardinal Corp., 383 U.S. 696, 86 S.Ct. 1107, 16 L.Ed.2d 192 (1966). Section 301 of the LMRA does not provide a statute of limitations. When Congress creates a federal cause of action, but does not expressly provide an applicable statute of limitations, it is assumed that Congress intended the courts to adopt the limitations period of an analogous cause of action. Monarch Long Beach Corp. v. Soft Drink Workers, et al., 762 F.2d 228, 230 (2d Cir.1985). The Supreme Court first articulated this principle in the context of labor law, and § 301 of the LMRA, in Hoosier, 383 U.S. 696, 704 n. 7, 86 S.Ct. 1107, 16 L.Ed.2d 192 (1966). In Hoosier, the plaintiff union filed an action against an employer to recover vacation pay claimed by its members pursuant to the terms of a collective bargaining agreement. Id. at 698, 86 S.Ct. 1107. The Court stated that “the timeliness of a § 301 suit ... is to be determined, as a matter of federal law, by reference to the appropriate state statute of limitations.” Id. at-704-705, 86 S.Ct. 1107. The Supreme Court expressly held that the statute of limitations for state law contract claims governs claims for violations of § 301 of the LMRA that are “essentially [ ] action[s] for damages caused by an alleged breach of an employer’s obligation embodied in a collective bargaining agreement.” Id. at 704 n. 7, 86 S.Ct. 1107. Because the allegations in Hoosier involved both written and oral contracts, the Court held that the longer state statute of limitations period for oral contracts applied in that case. Id. at 706-07, 86 S.Ct. 1107. In DelCostello, the plaintiffs, all employees, alleged that the employer’s work assignments violated the collective bargaining agreement, and the union violated the duty of fair representation by the way in which it handled the plaintiffs’ grievances. 462 U.S. at 157, 103 S.Ct. 2281. The Court first determined that there was no adequate analogy to the hybrid suit provided by state law, and, thus, turned to federal law to find an appropriate statute of limitations. Id. at 162-163, 103 S.Ct. 2281. The Court found that a claim for a breach of the duty of fair representation against the union was analogous to an unfair labor practices claim against an employer. Id. at 170, 103 S.Ct. 2281. Section 10(b) of the NLRA establishes a six-month statute of limitations period for submitting charges of unfair labor practices to the NLRB. Id. at 169, 103 S.Ct. 2281. The Court thus held that the six-month statute of limitations provided by § 10(b) was applicable. Id. at 170, 103 S.Ct. 2281. Because the LMRA § 301 claim was “inextricably interdependent” with the breach of the duty of fair representation claim, and required the plaintiff to prove the same facts against each defendant, the six-month statute of limitations was applied to the § 301 claim. Id. at 164, 170, 103 S.Ct. 2281. The DelCostello Court instructed that courts should not hesitate to turn away from state law when “a rule from elsewhere in federal law clearly provides a closer analogy than available state statutes, and when federal policies at stake and the practicalities of litigation make that rule a significantly more appropriate vehicle for interstitial lawmaking.” Del-Costello, 462 U.S. at 172, 103 S.Ct. 2281. The DelCostello court noted that its decision was not intended to be “a departure from prior practice in borrowing limitations periods for federal causes of action, in labor law or elsewhere.” Id. at 171, 103 S.Ct. 2281. Supreme Court jurisprudence after DelCostello, on the applicable statute of limitations in a § 301 suit has not squarely addressed the circumstances of this case. Following DelCostello, the Second Circuit defined a “hybrid claim” as a claim in which “an employee has a cause of action against both the employer and the union, where the two claims are inextricably linked, and where the case to be proved is the same against both.” McKee v. Transco Prods., Inc., 874 F.2d 83, 86 (2d Cir.1989). Additionally, the Circuit made clear that “[pjlaintiffs cannot circumvent the six-month limitations period for hybrid actions by choosing to sue only their employer.” Id. The Second Circuit has found DelCostello ’s reasoning controlling in certain circumstances, particularly when an employee is asserting a claim against an employer or union. See, e.g., Phelan v. Local 305, 973 F.2d 1050, 1060-61 (2d Cir.1992); McKee, 874 F.2d at 86. Additionally, when a case involves multiple employee plaintiffs asserting a violation of § 8(a)(5) of the NLRA, and a labor union asserting a violation of LMRA § 301, the Second Circuit has applied the six-month statute of limitations to both claims based on DelCostello. UAW v. R.E. Dietz Co., 996 F.2d 592, 595 n. 2 (2d Cir.1993). In UAW, both of the plaintiffs’ claims were based on the employer’s failure to pay vacation benefits, albeit for different periods of time. The court distinguished its approach from the view that the union’s claim was a straight contract dispute and stated that it would make no sense to apply different limitations periods to claims for the same benefits. Id. The court, however, “did not decide whether the contract statute of limitations would apply to a union’s claim that did not so directly parallel the employees’ claim, for example, a claim to compel contributions to a pension fund.” Id. The Circuit has noted, however, that DelCostello should be narrowly construed and, when appropriate, continues to refer to state law for an analogue from which to determine a limitations period. Monarch, 762 F.2d at 231. For example, in O’Hare v. Gen. Marine Transp. Corp., the court held that the six-year statute of limitations, borrowed from New York contract law, was applicable in a § 301 claim asserted by various benefits funds to recover trust fund payments due pursuant to a collective bargaining agreement. 740 F.2d 160, 163 (2d Cir.1984). In O’Hare, the court stated that DelCostello “cannot reasonably be expanded to all § 301 claims that involve facts which might also have established an unfair labor practice charge.” Id. at 168. Additionally, the Circuit looked to state law for a limitations period in Monarch, 762 F.2d at 231. In Monarch, a retailer and wholesaler filed an unfair labor practices charge against a union, pursuant to LMRA § 303. Id. at 229. The Circuit held that the concerns guiding the Supreme Court’s decision in DelCostello were not present in a violation of LMRA § 303 claim. Id. at 231. The case before the court is distinguished from DelCostello and Second Circuit authority applying that decision because it does not involve a c