Citations
- 787 F. Supp. 2d 590
Full opinion text
Order
GRAY H. MILLER, District Judge.
Pending before the court is defendant New Tech Engineering, L.P.’s (“New Tech”) motion for summary judgment on its counterclaim and request for declaratory relief (Dkt. 16), plaintiff Energy XXI, GoM, LLC’s (“Energy XXI”) motion for leave to file its second supplemental and amended complaint (Dkt. 15), New Tech’s motion for summary judgment on Energy XXI’s affirmative claims (Dkt. 22), Energy XXI’s motion for a continuance, which is contained within its response (Dkt. 24) to New Tech’s motion for summary judgment on Energy XXI’s affirmative claims, and New Tech’s objection to Energy XXI’s summary judgment evidence, which is contained within its reply in support of its motion for summary judgment on Energy XXI’s affirmative claims (Dkt. 25). Having considered the motions, the various responses and replies relating to the motions, the supplemental briefing concerning the choice-of-law issue, and the applicable law, the court is of the opinion New Tech’s motion for summary judgment on its counterclaim (Dkt. 16) should be GRANTED IN PART AND DENIED IN PART, Energy XXI’s motion for leave to file a second amended complaint (Dkt. 15) should be GRANTED, New Tech’s motion for summary judgment on Energy XXI’s affirmative claims (Dkt. 22) should be DENIED, Energy XXI’s motion for a continuance (Dkt. 24) should be DENIED AS MOOT, and New Tech’s objection to Energy XXI’s summary judgment evidence (Dkt. 25) should be OVERRULED.
I. Background
Energy XXI owns and operates South Timbalier 21, No. 138 well (the “Gouda Well”), which is located off of the coast of Louisiana on the Outer Continental Shelf. Dkts. 15, 16. New Tech and Energy XXI are parties to a Master Service Agreement (“MSA”), which governs work ordered by Energy XXI and accepted by New Tech, including work on the Gouda Well. The MSA defines the rights, obligations, and liabilities of both parties. Dkt. 16, Exh. 3(MSA).
In January 2009, Energy XXI was performing a recompletion operation on the Gouda Well. Dkt. 16. The recompletion operation was being conducted from the Hercules 203, a jack-up drilling rig that was attached to the Outer Continental Shelf at the time of the incident. Dkt. 33. Tony Hines and Jim Simon were working at the Gouda Well as wellsite consultants, or “company men,” through New Tech, and they were responsible for overseeing the operation. Dkt. 15, Exh. 1.
On or about January 15, 2009, a workstring became stuck in the Gouda Well. Id. Energy XXI claims that the workstring became stuck because its procedures were not followed-namely, using reverse circulation of excess cement after cementing work is performed below the retainer. Id. Energy XXI claims that it spent 37 days attempting to recover the string before the recompletion project could be completed, resulting in an expenditure of approximately $9,000,000. Id.
Energy XXI filed a claim in this court against New Tech for negligence relating to the January 15, 2009 incident, and it later added claims for gross negligence and breach of the MSA. Dkts. 1, 8. New Tech filed a counterclaim for breach of the MSA, claiming that Energy XXI breached the MSA because it failed to indemnify and hold New Tech harmless for its work as required by the MSA. Dkt. 6. Additionally, New Tech seeks a declaratory judgment stating that Energy XXI is contractually obligated under the MSA to indemnify New Tech against damages arising from the incident giving rise to this claim. Id. Finally, New Tech requests an award of attorneys’ fees it has incurred as a result of this lawsuit. Id.
New Tech filed a motion for summary judgment on its counterclaim and request for declaratory relief requesting that all of Energy XXI’s claims be dismissed because they are subject to the indemnity clause. Dkt. 16. New Tech has also filed a motion for summary judgment on Energy XXI’s affirmative claims for relief. Dkt. 22. New Tech argues that it cannot be held vicariously liable for Hines’s alleged negligence or gross negligence because Hines was a borrowed servant of Energy XXI, and that it cannot be held liable for contract damages because Energy XXI cannot show that it is entitled to damages for breach of the MSA, which specifically limits the types of damages recoverable. Dkt. 22. Energy XXI claims that Hines was solely New Tech’s employee during the pertinent time period and that the section of the contract limiting liability does not apply. Dkt. 24. Alternatively, Energy XXI argues that if the court finds that the borrowed servant defense is applicable, it should not dismiss Energy XXI’s affirmative claims because Energy XXI and New Tech are dual employers. Id. In the second alternative, Energy XXI requests a continuance under Federal Rule of Civil Procedure 56. Id.
New Tech alleged its borrowed servant affirmative defense with respect to Hines in its answer, but Energy XXI claims that it believed this affirmative defense was mere surplusage. According to Energy XXI, the MSA indicates that Hines and Simon were New Tech’s employees and that New Tech was responsible for their actions, so it did not feel a need to add Hines or Simon as defendants. It therefore did not attempt to add them before the deadline to amend its complaint. Additionally, Energy XXI claims that it only recently became aware, through discovery, of the corporate identities associated with Hines and Simon. Energy XXI requests leave to amend its complaint so that it can add Hines, Simon, and their respective corporate identities, as defendants.
II. Summary Judgment Standard
Summary judgment is proper if “the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that the moving party is entitled to a judgment as a matter of law.” Fed. R.Civ.P. 56(c); see also Carrizales v. State Farm Lloyds, 518 F.3d 343, 345 (5th Cir. 2008). The mere existence of some alleged factual dispute between the parties will not defeat an otherwise properly supported motion for summary judgment; there must be an absence of any genuine issue of material fact. Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247-48, 106 S.Ct. 2505, 91 L.Ed.2d 202 (1986). An issue is “material” if its resolution could affect the outcome of the action. Burrell v. Dr. Pepper/Seven Up Bottling Grp., Inc., 482 F.3d 408, 411 (5th Cir.2007). “[A]nd a fact is genuinely in dispute only if a reasonable jury could return a verdict for the non-moving party.” Fordoche, Inc. v. Texaco, Inc., 463 F.3d 388, 392 (5th Cir.2006).
The moving party bears the initial burden of informing the court of all evidence demonstrating the absence of a genuine issue of material fact. Celotex Corp. v. Catrett, 477 U.S. 317, 323, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986). Only when the moving party has discharged this initial burden does the burden shift to the non-moving party to demonstrate that there is a genuine issue of material fact. Id. at 322, 106 S.Ct. 2548. If the moving party fails to meet this burden, then it is not entitled to a summary judgment, and no defense to the motion is required. Id. “For any matter on which the non-movant would bear the burden of proof at trial ..., the movant may merely point to the absence of evidence and thereby shift to the non-movant the burden of demonstrating by competent summary judgment proof that there is an issue of material fact warranting trial.” Transamerica Ins. Co. v. Avenell, 66 F.3d 715, 718-19 (5th Cir. 1995); see also Celotex, 477 U.S. at 323-25, 106 S.Ct. 2548. To prevent summary judgment, “the non-moving party must come forward with ‘specific facts showing that there is a genuine issue for trial.’ ” Matsushita Elec. Indus. Co., Ltd. v. Zenith Radio Corp., 475 U.S. 574, 587, 106 S.Ct. 1348, 89 L.Ed.2d 538 (1986) (quoting Fed.R.Civ.P. 56(e)).
When considering a motion for summary judgment, the court must view the evidence in the light most favorable to the non-movant and draw all justifiable inferences in favor of the non-movant. Envl. Conservation Org. v. City of Dallas, Tex., 529 F.3d 519, 524 (5th Cir.2008). The court must review all of the evidence in the record, but make no credibility determinations or weigh any evidence; disregard all evidence favorable to the moving party that the jury is not required to believe; and give credence to the evidence favoring the non-moving party as well as to the evidence supporting the moving party that is uncontradicted and unimpeached. Moore v. Willis Ind. Sch. Dist., 233 F.3d 871, 874 (5th Cir.2000). However, the nonmovant cannot avoid summary judgment simply by presenting “conelusory allegations and denials, speculation, improbable inferences, unsubstantiated assertions, and legalistic argumentation.” TIG Ins. Co. v. Sedgwick James of Wash., 276 F.3d 754, 759 (5th Cir.2002); Little v. Liquid Air Corp., 37 F.3d 1069, 1075 (5th Cir.1994) (en banc). By the same token, the moving party will not meet its burden of proof based on conclusory “bald assertions of ultimate facts.” Gossett v. Du-Ra-Kel Corp., 569 F.2d 869, 872 (5th Cir.1978); see also Galindo v. Precision Am. Corp., 754 F.2d 1212, 1221 (5th Cir.1985).
III. Analysis
The court will first address New Tech’s motion for summary judgment on its counterclaim for indemnification and request for declaratory relief. It will then consider New Tech’s motion for summary judgment on Energy XXI’s affirmative claims. The court will decide whether to grant Energy XXI’s motion for a continuance and motion to amend its complaint after determining whether summary judgment is warranted.
A. Motion for Summary Judgment on New Tech’s Counterclaim
New Tech claims that the MSA requires Energy XXI to defend, indemnify, and hold New Tech harmless for damage to Energy XXI’s property caused by Hines. Dkt. 16. Energy XXI argues that the indemnity clause does not apply to claims for gross negligence and breach of contract. The court therefore must interpret the clause to determine which party is correct. However, in order to properly interpret the clause, the court must first determine which law to apply.
1. Choice of Law
Under the Outer Continental Shelf Lands Act (“OCSLA”), federal courts sitting in admiralty apply state law as surrogate federal law in certain circumstances. In making the determination as to whether state law or maritime law should apply, courts consider the factors enunciated in Union Texas Petroleum Corp. v. PLT Engineering, Inc.: “(1) The controversy must arise on a situs covered by OCSLA (i.e. the subsoil seabed, or artificial structures permanently or temporarily attached thereto)”; “(2) Federal maritime law must not apply of its own force”; and “(3) The state law must not be inconsistent with Federal law.” 895 F.2d 1043, 1047 (5th Cir.1990).
a. OCSLA Situs. In a case involving a contractual dispute, courts in the Fifth Circuit use the “focus-of-contract test” to determine if the controversy arises on an OCSLA situs. Grand Isle Shipyard, Inc. v. Seacor Marine, LLC, 589 F.3d 778, 787 (5th Cir.2009). Under this test, a controversy arises on an OCSLA situs “if a majority of the work called for by the contract is on stationary platforms or other enumerated OCSLA situses.” Id. If “the contract consists of two parts, a blanket contract followed by later work orders, the two must be interpreted together in evaluating whether maritime or land law is applicable to the interpretation and enforceability of the contract’s provisions.” Davis & Sons v. Gulf Oil Corp., 919 F.2d 313, 315-17 (5th Cir.1990). “Generally, each work order is for a discrete, relatively short-term job. Unless a contrary intent is reflected by the master contract and the work order, in determining the situs in a contract case ..., courts should ordinarily look to the location where the work is to be performed pursuant to the specific work order rather than the long term blanket contract.” Grand Isle Shipyard, 589 F.3d at 787 n. 6.
Here, the recompletion operations were being conducted on a jack-up drilling rig that was attached to the Outer Continental Shelf. Dkt. 33. In the Fifth Circuit, a jack-up drilling rig that is jacked up is an OCSLA situs. See Demette v. Falcon Drilling Co., 280 F.3d 492, 498 (5th Cir.2002), overruled on other grounds, Grand Isle Shipyard, 589 F.3d at 788 (5th Cir.2009) (finding that a rig that was jacked up met the second category of OCSLA situses because it “was a device temporarily attached to the seabed, which was erected on the OCS for the purpose of drilling for oil”). Thus, the majority of the work for this job was being performed on an OCSLA situs.
b. Maritime Law. Under the second PLT factor, the court must determine whether the contract is a maritime contract. If it is a maritime contract, then the court should interpret the contract under federal maritime law. However, if it is not a maritime contract, the court must apply Louisiana law. See Hoda v. Rowan Cos., Inc., 419 F.3d 379, 380 (5th Cir.2005) (noting that Louisiana law is applicable if a contract is “non-maritime”). New Tech argues that the recompletion services at the Gouda Well were “inextricably intertwined with maritime activities” because they necessarily required the use of a vessel, and the jack-up drilling rig is a vessel. Dkt. 36. Energy XXI argues that the recompletion services are not maritime in nature because they could just as easily be performed at a land-based facility as at sea. Dkt. 35.
Courts in the Fifth Circuit use the test set forth in Davis & Sons, Inc. v. Gulf Oil Corp. to determine whether a contract is a maritime contract. Hoda, 419 F.3d at 381. “Under Davis, there are two parts to the inquiry — an examination of the ‘historical treatment in the jurisprudence’ and a six-factor ‘fact-specific inquiry.’ ” Id. (quoting Davis, 919 F.2d at 316). If the historical treatment is clear enough, courts need not engage in the fact-specific inquiry. Id. (citing Demette, 280 F.3d at 500).
The second part of the Davis test requires courts to weigh the following factors:
(1) what does the specific work order in effect at the time of injury provide?
(2) what work did the crew assigned under the work order actually do?
(3) was the crew assigned to work aboard a vessel in navigable waters?
(4) to what extent did the work being done relate to the mission of that vessel?
(5) what was the principal work of the injured worker? and
(6) what work was the injured worker actually doing at the time of injury?
Davis, 919 F.2d at 316 (formatting added); Hoda, 419 F.3d at 381 (quoting these factors). What constitutes a maritime contract is a case-by-case determination that “is not determinable by rubric.” Davis, 919 F.2d at 316. “The maritime or non-maritime status of the contract ultimately depends on its ‘nature and character,’ not on its place of execution or performance.” Hoda, 419 F.3d at 381 (quoting Davis, 919 F.2d at 316). “A specialty services contract related to oil and gas exploration takes on a salty flavor when the performance of the contract is more than incidentally related to the execution of the vessel’s mission.” Domingue v. Ocean Drilling & Exploration Co., 923 F.2d 393, 396 (5th Cir.1991).
i) Historical Jurisprudence. The court must first consider the historical jurisprudence relating to contracts for oil and gas exploration services occurring on vessels in the Gulf of Mexico. The parties have pointed to no cases specifically addressing whether a contract to provide a “company man” to oversee a recompletion operation on a jack-up drilling rig is a maritime contract. The cases that address whether a contract for specialty services relating to oil exploration is a maritime contract teach that neither the fact that the contract called for services to be performed on a jack-up drilling rig, which is a vessel, nor the fact that the services are traditionally non-maritime in nature, is determinative. For example, in Campbell v. Sonat Offshore Drilling, Inc., the Fifth Circuit determined that a contract between a casing service contractor and an oil company involving driving casing into the seabed on the Outer Continental Shelf, which is “inherently non-maritime in nature,” was a maritime contract because the work “was ‘inextricably intertwined with maritime activities since it required the use of a vessel[, a jack-up drilling rig,] and its crew.’ ” Campbell, 979 F.2d 1115, 1123 (5th Cir.1992), superseded, by statute on other grounds. The use of a jack-up drilling rig, however, does not always transform a contract for traditionally non-maritime services into a maritime contract. In Domingue v. Ocean Drilling & Exploration Co., for example, the Fifth Circuit determined that a contract for wireline services, which is also a non-maritime activity, was not a maritime contract because, while the work was performed on a jack-up drilling rig, the rig’s vessel status was “nothing more than incidental to its purpose here of serving as a work platform for the execution of this particular service contract.” 923 F.2d at 397. “The fact that the [jack-up drilling rig] is a vessel [did] not decisively affect the nature or character of the [contract].” Id.
The historical jurisprudence does not clearly dictate a specific outcome when considering the basic facts of this case. Thus, the court must weigh Davis factors to determine if the contract at issue is a maritime contract. The court only considers the first four factors because the last two factors of the Davis test inquire about the work of the “injured worker.” Here, there is no injured worker, so the last two factors are not relevant to the analysis.
ii) The First Two Davis Factors. There is no need to differentiate between the first two Davis factors in this case. Under the first Davis factor, the court must consider what work was required under the specific work order in effect at the time of the incident, and under the second factor, the court must consider what work the crew assigned under the order actually did. Here, the specific work order was for a “company man” to oversee the recompletion of a well. “ ‘[R]eeompletion’ is defined as ‘[r]edrilling the same well bore to reach a new reservoir after production from the original reservoir has been abandoned.’ ” Burns v. La. Land & Exploration Co., 870 F.2d 1016, 1021 (5th Cir.1989) (quoting Williams & Meyers, Manual of Oil and Gas Terms 160,163 (7th ed.1987)) (second alteration in original). This type of work is not maritime in nature, as it could as easily be performed at a land-based well as at sea. However, the company man who was provided for this project was tasked with overseeing the recompletion of a well using a jack-up drilling rig — a vessel- — offshore. The use of a vessel lends a salty flavor to this otherwise nonmaritime activity.
iii) The Third Davis Factor. The answer to the third Davis factor, was the crew assigned to work aboard a vessel in navigable waters, is yes. In the Fifth Circuit, a jack-up drilling rig is considered a vessel, and the rig was jacked up in the Gulf of Mexico. The third factor therefore weighs in favor of the application of maritime law.
iv) The Fourth Davis Factor. The fourth factor inquires into the extent to which the work done under the work order contributed to the mission of the vessel. New Tech, citing Hoda v. Rowan Companies, Inc., Campbell, Davis, Gilbert v. Offshore Production & Salvage, No. 95-122, 1997 WL 149959, 1997 U.S. Dist. LEXIS 3592 (E.D.La. Mar. 21, 1997), and Samson Contour Energy E & P, LLC v. Leam Drilling Systems, Inc., No. 10-00671, 2010 WL 5092966, 2010 Dist. LEXIS 129016 (S.D.Tex. Dec. 7, 2010) (Werlein, J.), argues that the primary purpose of the jack-up drilling rig was to perform the recompletion operation and that Hines’s work supervising the operation was an integral part of that mission. Energy XXI, relying on Domingue v. Ocean Drilling and Exploration Co., 923 F.2d 393 (5th Cir.1991) and Thurmond v. Delta Well Surveyors, 836 F.2d 952 (5th Cir.1988), claims that the recompletion operation could have been completed without the vessel and that Hines’s services were only incidentally related to the mission of the vessel.
In Hoda v. Rowan Companies, Inc., the plaintiff was injured when he tripped on a hose on the deck of a jack-up drilling rig at a wellhead on the Outer Continental Shelf. 419 F.3d at 381. He was torquing nuts on the blow-out preventer on the wellhead pursuant to the work order. Id. The MSA under which he worked covered “ ‘hydrostatic testing, hydraulic torque wrench service, nut splitters, casing cutting, pipeline/production and miscellaneous rental tool equipment.’ ” Id. (quoting the MSA). This work “did not require the use of the vessel, her personnel or equipment, but [the employer] would have had nothing to do had [the drilling company’s] personnel not used the rig’s equipment to set the blow-out preventers in place, align them, place the bolts on them, and place the nuts on the bolts for tightening .... Moreover, [the employer’s] work was sequenced with and delayed by [the drilling company] with gravel packing operations that [the drilling company] was separately undertaking on the well.” Id. The Fifth Circuit determined that the plaintiffs employer’s work was “ ‘inextricably intertwined’ with the activity of the rig,” and that the work was “ ‘an integral part of drilling, which is the primary purpose of the vessel.’ ” Id. at 383 (quoting Demette, 280 F.3d at 501).
Energy XXI attempts to distinguish Hoda by noting that the “linchpin of the decision in Hoda was that the activities being undertaken at the time of the incident could not be performed in the absence of a vessel.” Dkt. 35 (citing Hoda, 419 F.3d at 383) (emphasis in original). Energy XXI contends that the recompletion procedure in this case could have been completed without a vessel. Dkt. 35. New Tech takes issue with this characterization of the evidence, noting that the Gouda Well is in fact “in the middle of the Gulf of Mexico” and that the recompletion operation could not have taken place “without the use of the vessel and its crew.” Dkt. 36. New Tech points out that it “was not possible for Tony Hines to supervise and carry out the recompletion operation, which [Energy XXI] admits consists of operations thousands of feet below the ocean floor, without the [jack-up drilling rig’s] drilling equipment and its crew.” Id.
The court finds that, like the work in Hoda, Hines’s work as the “company man” was an integral part of the primary purpose of a vessel. His position was to supervise the recompletion operation, and the record demonstrates that the purpose of the vessel, which was positioned above the Gouda Well at the beginning of the recompletion operation, demobilized when the fishing operation was terminated in February 2009, and returned to the Gouda Well to perform the sidetrack operation, was to perform the recompletion operation. Dkt. 36; see also Dkt. 20, Exh. B-1 (Expert Report of Jeffrey R. Hughes) (noting that the rig “performed the work”). Moreover, Hines testified that the purpose of the rig was to perform the recompletion procedure. Dkt. 37, Exh. A at 205.
The other cases cited by New Tech lend support the court’s conclusion that Hines’s work contributed to the mission of that vessel. Dkt. 34. In Campbell, the contract at issue involved the provision of casing services. 979 F.2d at 1123. The crew used a jack-up drilling rig’s derrick and draw works to accomplish the vessel’s mission — “which was to drill oil and gas wells over navigable waters.” Id. The Fifth Circuit held that this work “was ‘inextricably intertwined with maritime activities since it required the use of a vessel and its crew.’ ” Id. (quoting Davis, 919 F.2d at 317). In Davis, the Fifth Circuit held that a barge that served as a “mobile maintenance unit” was more than a mere work platform, and its crew, which provided maintenance services, “served in a capacity that contributed to the accomplishment of its mission in the same way that a surgeon serves as a member of the crew of a floating hospital.” Davis, 919 F.2d at 317. In Gilbert, the federal district court for the Eastern District of Louisiana determined that a jack-up drilling rig engaged in tieback and completion work “was not a mere work platform for some incidental service contract” and that the supervision of a company man who was overseeing the work “centered around the work for which the [jack-up drilling rig] had specifically been chartered.” Gilbert, 1997 WL 149959, at *6, 1997 U.S. Dist. LEXIS 3592, at *21-22,. Likewise, in Samson, the court determined that directional drilling work “related directly to the mission” of a jack-up drilling rig and “required use of the drilling vessel as more than a mere platform.” Samson, 2010 WL 5092966, at *6, 2010 U.S. Dist. LEXIS 129016, at *19.
Here, like in Davis, Gilbert, and Samson, the work being performed required the use of the drilling vessel as more than a mere platform. Though a recompletion operation, in general, can be performed on land as well as at sea, it could not have been performed without a vessel in this case. The recompletion operation was performed at sea using a vessel, which was specifically brought to the site so that this work could be performed. Hines’s supervision of the recompletion operation was, therefore, “inextricably intertwined with maritime activities since it required the use of a vessel and its crew.” Davis, 919 F.2d at 317.
The cases that Energy XXI cites in support of its position that Hines’s work was only incidentally related to the mission of the vessel are not on point because the contracts in those cases were for wireline services, which do not involve the use of a vessel. In Thurmond, the Fifth Circuit held that a contract to perform wireline services from a barge was not a maritime contract. Thurmond, 836 F.2d at 956. Similarly, in Domingue, the Fifth Circuit determined that a contract to provide wireline services from a jack-up drilling rig was non-maritime. Domingue, 923 F.2d at 397. Wireline operations involve servicing partially drilled oil and gas wells, and “they do not concern the operation of a vessel.” Thurmond, 836 F.2d at 955; Domingue, 923 F.2d at 394 n. 3, 396. In Domingue, the Fifth Circuit stated that the jack-up drilling rig was merely serving as a work platform. Id.
After weighing these factors, the court concludes that the contract at issue is a maritime contract. Thus, federal maritime law applies, and there is no need to address the third PLT prong.
2. Analysis Under Maritime Law
New Tech’s motion for summary judgment on its counterclaim depends on the indemnity provision contained within the MSA (“Indemnity Clause”). “The interpretation of a contractual indemnity provision is a question of law.” Becker v. Tidewater, Inc., 586 F.3d 358, 369 (5th Cir.2009). The Indemnity Clause states:
Energy XXI shall be responsible, and Contractor [New Tech] shall never be hable, for property damage of ... Energy XXI ... and Energy XXI agrees to defend, indemnity [sic.] and hold harmless, Contractor, against any and all such claims, demands, losses or suits, (including, but not limited to, claims, demands or suits for property damage ...) which may be brought against Contractor by Energy XXI, any employee of Energy XXI or the legal representative or successor of any such employee, in anywise arising out of or incident to work being performed on or about Energy XXI’s property or jobsite, irrespective of whether such claims, demands or suits are based on the relationship of master and servant, third party, or otherwise, and even though occasioned, brought about, caused by, arising out of or resulting from Energy XXI’s work, or its acts, activities, or presence on any location, structure or vessel, or travel to and from such location, structure, or vessel, the unseaworthiness or unairworthiness or [sic.] vessels and craft, or the negligence or strict liability, in whole or in part, of Contractor, or by or from any other means, relationship or cause, without limitation whatsoever.
Dkt. 16, Exh. C(MSA). According to New Tech, Energy XXI’s claims for negligence, breach of contract, and gross negligence all fall within this contractual provision because they all involve property damage arising from work performed during the recompletion of the Gouda Well. Dkt. 16. Energy XXI argues that the Indemnity Clause does not cover its breach of contract or gross negligence claims. Energy XXI does not address New Tech’s arguments relating to its negligence claim.
a. Breach of Contract Claim. Energy XXI claims that New Tech breached the MSA by “failing to perform in the manner set forth in the MSA.” Dkt. 20 at 7. New Tech argues that Energy XXI must indemnify it for any alleged contractual breach because the Indemnity Clause in the MSA is broad enough to encompass Energy XXI’s breach of contract claim, which arises from damage to Energy XXI’s property. Under federal maritime law, a “contract of indemnity should be construed to cover all losses, damages, or liabilities which reasonably appear to have been within the contemplation of the parties, but it should not be read to impose liability for those losses or liabilities which are neither expressly within its terms nor of such a character that it can be reasonably inferred that the parties intended to include them within the indemnity coverage.” Corbitt v. Diamond M. Drilling Co., 654 F.2d 329, 333 (5th Cir.1081).
Energy XXI argues that its breach of contract claim was not within the contemplation of the parties because (1) there is no mention of the word “contract” in the Indemnity Clause, even though it specifically mentions negligence and strict liability; and (2) if the Indemnity Clause does cover a breach of contract, then the provision of the contract requiring New Tech to perform work “with due diligence and in a safe, good and workmanlike manner,” which is the provision Energy XXI claims New Tech breached, would be meaningless. Dkt. 20 at 5, 8 (quoting Dkt. 16, Exh. C(MSA)). New Tech claims, on the other hand, that the Indemnity Clause is “extremely broad” and that “indemnity for breach of contract ‘reasonably appears to have been within the contemplation of the parties.’ ” Dkt. 21 at 3.
With regard to Energy XXI’s first argument, under maritime law, the “contract need not contain any special words to evince an intention to create a right of indemnity for independent contractual liabilities.” Corbitt, 654 F.2d at 334. The contract simply “must clearly express such a purpose.” Id. The Indemnity Clause does not contain the words “breach of contract,” but it does expressly state that it covers “any and all such claims, demands, losses or suits, (including, but not limited to, claims, demands or suits for property damage ...) which may be brought against [New Tech] by Energy XXI ... in anywise arising out of or incident to work being performed on or about Energy XXI’s property or jobsite.” It is without question that the breach of contract claim arises out of work being performed at Energy XXI’s jobsite. Thus, the language in the Indemnity Clause is broad enough to encompass contractual obligations.
Energy XXI claims that interpreting the broad language of the indemnity clause as covering breach of contract claims stands in conflict with the Fifth Circuit precedent indicating that a broad indemnity clause covering “all claims” does not include contractual obligations. Dkt. 20. Energy XXI cites Corbitt, 654 F.2d at 333 and Ingalls Shipbuilding v. Federal Ins. Co., 410 F.3d 214, 221 (5th Cir.2005), in support of this argument. In Corbitt, Shell Oil Company (“Shell”) and the defendant, Diamond M. Drilling Company (“Diamond M”), had a contract relating to the provision of labor and materials for drilling, working over, or deepening wells on Shell’s leaseholds. The Shell/Diamond M contract had an indemnity clause whereby Shell agreed to indemnify Diamond M for claims for personal injuries by Shell employees arising out of work performed by Diamond M. Corbitt, 654 F.2d at 331. Diamond M likewise agreed to indemnify Shell for personal injury claims brought by Diamond M employees. See id. Shell was also a party to a purchase contract with a third party, Sladco, Inc. (“Sladco”), for personnel, equipment, and supplies, as required by Shell. See id. The Shell/Sladco contract had the same indemnification provision. See id. A Sladco employee, Harvey Corbitt, suffered an injury while working on one of Diamond M’s drilling rigs. See id. Corbitt sued Diamond M for negligence. Diamond M sought indemnity from Shell, which in turn sought indemnification from Sladco under the terms of the Shell/Sladco purchase order. See id. Diamond M and Shell settled with Corbitt, and Sladco moved for summary judgment on Shell’s indemnity claim, asserting that its indemnity agreement with Shell did not require it to indemnify Shell for Shell’s contractual liability to Diamond M. See id.
The Fifth Circuit held that the indemnity clause in the Shell/Sladco purchase order “does not expressly provide that Sladco will indemnify Shell for Shell’s contractual liability to third persons.” Id. at 333. The indemnity clause in the purchase order provided for indemnity “ ‘against all claims, suits, liabilities and expenses on account of personal injury ... arising out of or in connection with performance of this Order.’ ” Id. (quoting the Shell/Sladco purchase order). The Fifth Circuit found that Shell’s liability to Diamond M, for which it requested indemnity, was not “on account of personal injury.” Shell’s liability arose out of its agreement with Diamond M, which was a separate agreement.
The Corbitt contract and facts are clearly distinguishable from the instant case. In Corbitt, Shell’s liability was not on account of personal injury, which is the type of injury for which the indemnification provision expressly provided. Here, the liability that Energy XXI hopes to impose upon New Tech is exactly the type of injury expressly contemplated by the contract as it relates to “claims, demands or suits for property damage ... brought about, caused by, arising out of or resulting from ... the negligence or strict liability, in whole or in part, of Contractor.” Dkt. 16, Exh. C (emphasis added). Moreover, Energy XXI’s claims do not arise out of the breach of a separate agreement like the claims in Corbitt. Energy XXI claims that New Tech breached the same contract in which the Indemnity Clause is found— the MSA. See Dkt. 20.
In Ingalls, the Fifth Circuit found that the indemnity provision at issue did not encompass the contractual claims presented, but it specifically noted that the indemnity provision did not include “expansive phrases such as ‘whatsoever nature or character.’ ” See Ingalls, 410 F.3d at 222 (distinguishing Sumrall v. Ensco Offshore Co., 291 F.3d 316, 318-19 & n. 4 (5th Cir.2002)). Here, the Indemnity Clause does include expansive phrasing. Specifically, the instant clause states that “Energy XXI agrees to defend, indemnity [sic.] and hold harmless [New Tech] against any such claims ... in anywise arising out of or incident to work being performed on or about Energy XXI’s property or jobsite, irrespective of whether such claims ... are based on ... the negligence or strict liability, in whole or in part, of [New Tech] or by or from any other means, relationship or cause, without limitation whatsoever.” Dkt. 16, Exh. C. Thus, while the use of the term “all claims” in an indemnity clause may preclude indemnification for contractual claims if it is used in isolation, the use of a similar term in the Indemnity Clause here does not preclude contractual claims due to the expansive language used with the clause and the lack of limiting language.
Energy XXI’s second argument relating to New Tech’s request for indemnification for Energy XXI’s contractual claim is that an interpretation requiring indemnification for breach of contract claims would render meaningless the part of the contract requiring that New Tech “ ‘perform all such services or work with due diligence and in a safe, good and workmanlike manner, in accordance with all laws, regulations and rules valid and applicable, and to the full and complete satisfaction of ENERGY XXI’” (hereinafter “Good and Workmanlike Manner Clause”). Dkt. 20 (quoting Dkt. 16, Exh. C). A “basic principle of contract interpretation in admiralty law is to interpret, to the extent possible, all the terms in a contract without rendering any of them meaningless or superfluous.” Chembulk Trading LLC v. Chemex Ltd., 393 F.3d 550, 554 (5th Cir.2004) (citations omitted). Thus, interpreting the contract to require indemnity for breach of contract in this ease would be contrary to the rules of contract interpretation if doing so rendered the Good and Workmanlike Manner Clause meaningless.
However, interpreting the Indemnity Clause as covering claims for breach of contract does not render the Good and Workmanlike Manner Clause in the MSA meaningless. The indemnity provision makes Energy XXI responsible for “property damage of, personal injury to, or death of Energy XXI and any of Energy XXI employees.” Dkt. 16, Exh. C (emphasis added). Here, the injury associated with the alleged breach of the Good and Workmanlike Manner Clause is property damage. There are, however, certainly scenarios in which New Tech could breach the Good and Workmanlike Manner Clause that do not fall under the indemnity provision. For instance, if a breach of the Good and Workmanlike Manner Clause resulted only in economic loss as opposed to property damage, personal injury, or death, Energy XXI may have a valid claim for breach, and New Tech would not be protected by the Indemnity Clause. Thus, the court’s interpretation of the Indemnity Clause as requiring indemnity in this case does not render the Good and Workmanlike Manner Clause meaningless in all cases.
b. Negligence Claim. Energy XXI claims that “New Tech and Hines failed to comply with [its reverse circulation procedure], and negligently caused a workstring to become stuck in the [Gouda Well].” Dkt. 1. New Tech claims that the Indemnity Clause precludes Energy XXI’s negligence claims. Energy XXI did not address the regular (as opposed to gross) negligence claims in its response, likely because the plain language of the Indemnity Clause indicates that Energy XXI agreed to hold New Tech harmless for property damage claims resulting from “the negligence or strict liability ... of [New Tech].” Dkt. 16, Exh. C. Because the Indemnity Clause precludes Energy XXI from bringing claims against New Tech for damage to its property resulting from New Tech’s negligence, New Tech’s motion for summary judgment with regard to Energy XXI’s negligence claim is GRANTED. Energy XXI breached the agreement by bringing a negligence claim against New Tech for the damage to Energy XXI’s property, and New Tech is not responsible for any damages to Energy XXI’s property that may have resulted, in whole or in part, by New Tech’s ordinary negligence.
c. Gross Negligence Claim. Energy XXI argues that the Indemnity Clause cannot be interpreted to require Energy XXI to indemnify New Tech for New Tech’s gross negligence and that, even if the Indemnity Clause could so be construed, it would be unenforceable. Dkt. 20 at 9. New Tech argues that the contract’s language is broad enough to encompass gross negligence and that even if the contract were required to specifically state that the clause covered gross negligence, the Indemnity Clause’s delineation of “negligence” includes gross negligence.
I. Interpretation of Clause. Under maritime law, “indemnification for an indemnitee’s own negligence [must] be clearly and unequivocally expressed.” Seal Offshore, Inc. v. Am. Standard, Inc., 736 F.2d 1078, 1081 (5th Cir.1984). A reference to “any and all claims” with no mention of negligence is not broad enough to encompass the negligence of an indemnitee. See id. However, the phrase “without regard to the cause or causes thereof or the negligence of any party” does satisfy the “clear and unequivocal” test. Theroit v. Bay Drilling Corp., 783 F.2d 527, 540 (5th Cir.1986). The phrase “shall be responsible for all ... causes of action of every kind ... arising in connection herewith ... of ... Operator’s invitees on account of bodily injury ... without regard to cause” also satisfies the standard. East v. Premier, Inc., 98 Fed. Appx. 317, 321 (5th Cir.2004) (unpublished).
Energy XXI first argues that the Indemnity Clause cannot cover gross negligence because it does not specifically include the term “gross negligence.” Energy XXI cites In re TT Boat Corp., No. Civ. A 98-0494, 98-1109, 1999 WL 1442054 (E.D.La. Sept. 8, 1999), in support of this contention. In TT Boat Corp., the federal district court for the Eastern District of Louisiana noted that the Fifth Circuit requires that the court “be firmly convinced that the exculpatory provision reflects the intention of the parties” before enforcing an indemnification clause for the indemnitee’s own negligence. TT Boat Corp., 1999 WL 1442054, at *6. The TT Boat indemnity provision excluded liability caused by “ ‘negligence, strict liability, products liability and/or unseaworthiness.’ ” Id. The court noted that “the requirement of specificity in an indemnity contract is axiomatic, and this indemnity provision is silent with respect to gross negligence .... ” Id. It ultimately declined to read “gross negligence” into the indemnity provision. Id.
The clause in TT Boat Corp. was not as expansive as the clause in this case. The TT Boat Corp. clause limits the types of claims to “negligence, strict liability, products liability and/or unseaworthiness.” Here, the clause covers “negligence ... [or] any other means, relationship or cause, without limitation whatsoever.” The plain language of this clause evinces an intent by both parties not to limit the types of claims that the indemnity provision covers. The present Indemnity Clause is therefore broad enough to encompass gross negligence. However, as discussed below, to the extent the clause could be interpreted to encompass gross negligence, it is unenforceable.
ii. Enforceability of Clause. Energy XXI claims that “gross negligence invalidates any type of exemption from liability.” Dkt. 20 at 9. Energy XXI cites Todd Shipyards Corp. v. Turbine Serv. Inc., 674 F.2d 401, 411 (5th Cir.1982), AGIP Petroleum Co., Inc. v. Gulf Island Fabrication, Inc., 920 F.Supp. 1330, 1341 (S.D.Tex.1996) (Crone, J.), and In re TT Boat Corp., 1999 WL 1442054, in support of this argument. In Todd Shipyards, the Fifth Circuit ultimately held that the appellee was not guilty of gross negligence, but during its analysis, it stated that gross negligence will invalidate an exemption from liability. Todd Shipyards Corp., 674 F.2d at 411 (citing 6A Corbin on Contracts § 1472 (1964 ed.)). The AGIP Petroleum Co. Inc., which relied, in part, on Todd Shipyards, considered whether a clause limiting damages “based on negligence, unseaworthiness, breach of warranty, breach of contract, strict liability or otherwise” was valid and enforceable under maritime law. AGIP, 920 F.Supp. at 1341. The court noted that “clauses limiting liability for negligence and strict liability are valid and enforceable,” but “[s]uch clauses----may not limit liability for conduct rising to the level of gross negligence.” Id. (citing Todd Shipyards Corp. v. Turbine Serv. Inc., 674 F.2d 401, 411 (5th Cir.1982)).
New Tech asserts that parties may properly indemnify each other on claims of gross negligence, citing In re Horizon Vessels, Inc., H-03-3280, 2005 U.S. Dist. LEXIS 42110, at *34 (S.D.Tex. Nov. 18, 2005). Dkt. 21. In Horizon Vessels, the federal district court for the Southern District of Texas found that an indemnity clause that specifically required indemnification for damage “caused or contributed to by negligence or other fault (including sole, joint, concurrent or gross negligence) ... strict liability ... or any other legal liability” imposed a duty to indemnify for reckless conduct. In re Horizon, No. 4:03-cv-03280, Dkt. 186, at *22-23. The party seeking to avoid enforcement of the indemnification clause in Horizon Vessels argued that the plain language of the clause only required it to indemnify the party seeking to enforce the clause for “negligence or other fault (including sole, joint, concurrent or gross negligence,)” not for reckless conduct. Id. at 22. There is no indication that the party seeking to avoid enforcement of the clause argued that a clause exempting a party from its own gross negligence or recklessness was unenforceable. See id. The district court adopted the magistrate judge’s order, in which the magistrate judge found that the clause’s “plain language ... unambiguously impose[d] ... an obligation to defend and indemnify ... even if [the party seeking to enforce the clause] engaged in reckless conduct with respect to the alleged incident.” In re Horizon, No. 4:03-cv-03280, Dkts. 186, 196. The party seeking to avoid enforcement of the clause appealed, but the parties settled before the Fifth Circuit could address the validity of the clause. See In re Horizon, No. 4:03-cv-03280, Dkts. 391, 392. While the Horizon Vessels court did enforce an indemnity provision that sought to encompass gross negligence and even held that it was broad enough to encompass reckless conduct, there is no indication that it was presented with the argument that Energy XXI makes — that the clause was unenforceable. Thus, while Horizon Vessels is helpful with regard to the interpretation of the clause, it is not persuasive with regard to New Tech’s position that the clause is enforceable.
New Tech also argues that even courts that require an express negligence clause do not require that the clause expressly state it applies to gross negligence claims in order to cover such claims. Dkt. 21 at 9. Indeed, under Texas law, which requires an express negligence clause, a clause purporting to require indemnification “to the greatest extent allowed by Texas law, regardless of any negligence, misconduct or strict liability of any Indemnified party” was held to be broad enough to encompass gross negligence; it was not necessary that the clause specifically state that it covered “gross negligence” because “gross negligence is not a separate cause of action from negligence.” RLI Ins. Co. v. Union Pac. Ry. Co., 463 F.Supp.2d 646, 649 (S.D.Tex.2006) (Hittner, J.); see also Webb v. Lawson-Avila Constr., Inc., 911 S.W.2d 457, 460-61 (Tex.App.-San Antonio 1995, writ dism’d) (noting that, under Texas law, when “the parties to an agreement use the term ‘negligence’ it is assumed they mean all shades of negligence” and concluding that the indemnifying party intended to indemnify “from the consequences of all shades and degrees of its own negligence, including gross negligence”). However, the indemnity provision here must be interpreted pursuant to maritime law, not Texas law, and the court therefore does not find the Texas cases persuasive.
There is more support for the position that, under maritime law, an indemnification clause purporting to exempt a party from liability for its own gross negligence is invalid than for the position that such clauses are an appropriate means of risk shifting. First, though Todd Shipyards did not directly hold that an exemption from liability for gross negligence is contrary to public policy, it did state, in dicta, that gross negligence “will invalidate an exemption from liability.” Todd Shipyards, 674 F.2d at 411. The Fifth Circuit cited section 1472 of the 1964 edition of Corbin on Contracts for this concept. Id. That section states that “[cjourts do not enforce agreements to exempt parties from tort liability if the liability results from that party’s own gross negligence, recklessness, or intentional conduct.” 15 Corbin on Contracts § 85.18 (2003 ed.) (formerly 6A Corbin on Contracts § 1472 (1964 ed.)).
Caselaw from other circuits and secondary sources also provide support for Energy XXI’s position. The First and Ninth Circuits have, relying in part on Todd Shipyards, both instructed that a red letter clause may not limit liability for gross negligence in a maritime contract. See Royal Ins. Co. of Am. v. Sw. Marine, 194 F.3d 1009, 1016 (9th Cir.1999) (“We are persuaded ... that a party to a maritime contract should not be permitted to shield itself contractually from liability for gross negligence.” (citing Todd Shipyards, La Esperanza de P.R., Inc. v. Perez y Cia de Puerto Rico, Inc., 124 F.3d 10 (1st Cir. 1997); Rest.2d Contracts § 195(1) & cmt. a (1979); 6A Corbin on Contracts § 1472 (1962 ed. & Supp.1999); 8 Williston on Contracts § 19:23 (4th ed.1998); and Prosser & Keeton, Torts § 68, at 484 (5th ed.1984))); La Esperanza, 124 F.3d at 19 (“A red letter clause ... may not limit liability on a marine contract for gross negligence because harm willfully inflicted or caused by gross or wanton negligence operates to invalidate an exemption from liability.” (internal quotation omitted) (quoting Todd Shipyards)). And, various secondary sources support the position that an exemption from liability for gross negligence in a maritime contract is contrary to public policy. See, e.g., Royal Ins. Co. of Am., 194 F.3d at 1016 (citing various secondary sources); Daniel B. Shilliday et al., Contractual Risk-Shifting in Offshore Energy Operations, 81 Tulane L.Rev. 1579, 1604 (2007) (“Courts sitting in admiralty are clear that it is against public policy for a party to a maritime contract to be indemnified for its own gross negligence.”); Matthew J. Bauer, Making Sense of Maritime Exculpation Clause Jurisprudence, 22 Thomas M. Cooley L.Rev. 309, 309 (2006) (“[Cjourts will not permit a party to use an exculpation clause to limit its liability for gross negligence or intentional torts.”); 57A Am.Jur.2d Negligence § 58 (Westlaw, updated Nov. 2010) (“It has been held that a person may not exonerate himself or herself for liability for intentional torts, for willful or wanton misconduct, or for gross negligence by the use of exculpatory language; such a provision is void as against public policy.” (footnotes omitted)). But see Daniel B. MacLeod, The Use and Enforceability of Exculpatory (Red Letter) Clauses in Ship Repair Contracts, 6 Univ. of San Francisco Maritime Law J. 473, 492-500 (1994) (disagreeing with the view that the enforcement of exculpatory clauses should be predicated on “degrees of negligence”). In accord with these authorities, the court finds that the indemnity provision in this case, to the extent it encompasses claims for gross negligence, is unenforceable. New Tech’s motion for summary judgment relating to the gross negligence claim is therefore DENIED.
B. Motion for Summary Judgment on Energy XXI’s Affirmative Claims
New Tech also moves for summary judgment on Energy XXI’s affirmative claims based on its borrowed servant affirmative defense and a provision of the MSA that allegedly bars Energy XXI from recovering damages for breach of the MSA. Dkt. 22. Since the court is dismissing the breach of contract claim due to the indemnification clause, it need not address the damage limitation issue. As to the borrowed servant defense, New Tech claims that it cannot be held vicariously liable for Hines’s conduct at the Gouda Well because its only involvement at the Gouda Well was to provide payroll services for Hines. Id. According to New Tech, Energy XXI directed and controlled Hines’s work at the Well, and “the ability to exercise authoritative control over the individual’s work performance ... is the centerpiece of the borrowed servant analysis.” Id. New Tech therefore claims that Hines is the borrowed servant of Energy XXI and that it cannot be held vicariously liable. Id. Energy XXI argues that there are questions of fact with regard to whether Hines was its borrowed servant. Dkt. 24. Additionally, Energy XXI argues that even if Hines was its borrowed servant, New Tech is not entirely relieved of liability because Louisiana law should be applied, and, under Louisiana law, New Tech and Energy XXI were dual employers.
1. Borrowed Servant Analysis. The “ ‘issue of whether a relationship of borrowed servant existed is a matter of law1 for the district court to determine.” Melancon v. Amoco Prod. Co., 834 F.2d 1238, 1244 (5th Cir.1988) (quoting Gaudet v. Exxon Corp., 562 F.2d 351, 357 (5th Cir.1977)). Both parties agree that, whether maritime or Louisiana law applies, the court should apply the factors enunciated in Ruiz v. Shell Oil Co., 413 F.2d 310, 313 (5th Cir.1969) to determine if summary judgment is appropriate with regard to New Tech’s borrowed servant defense. In Ruiz, the Fifth Circuit set forth the following factors for courts to consider when determining whether a borrowed-servant relationship exists:
(1) the amount of control the borrower has over the servant and the work he or she performs;
(2) whether there is an agreement, understanding, or meeting of the minds between the borrower and the lender;
(3) agreement or acquiescence by the servant that he be employed by the borrower;
(4) temporary termination by the general employer of its relationship with the servant;
(5) furnishing by the borrower of the necessary instruments and the place for performance of the work in question;
(3) employment of the servant over a considerable length of time;
(7) the fact that work being performed is that of the temporary employer;
(8) customary right to discharge the servant; and
(9) obligation for payment of the servant’s wages.
Ruiz, 413 F.2d at 312-13. “No one factor or combination of factors is decisive and no test has been fixed to determine the existence of a borrowed servant relationship.” Trevino v. Gen. Dynamics Corp., 865 F.2d 1474, 1488 (5th Cir.1989) (citing Alday v. Patterson Truck Line, Inc., 750 F.2d 375, 376 (5th Cir.1985)).
a. Extent of control Energy XXI had over Hines’s work. In the Fifth Circuit, “the question of who has control over the employee and the work he is performing, has [often] been considered the central issue of ‘borrowed employee’ status.” Melancon, 834 F.2d at 1244-45 (citation omitted). However, this factor is “not necessarily determinative.” Id. “In considering whether the power exists to control and direct a servant, a careful distinction must be made ‘between authoritative direction and control, and mere suggestions as to details ....’” Ruiz, 413 F.2d at 313 (quoting Standard Oil Co. v. Anderson, 212 U.S. 215, 222, 29 S.Ct. 252, 53 L.Ed. 480 (1909)).
Energy XXI argues that it is the right to control the work as opposed to actual control that matters. Dkts. 27-4, 39. Energy XXI focuses on New Tech’s overall control of Hines’s employment situation as opposed to control over the actual work he was doing at the Gouda Well. Energy XXI claims that, when considering the areas of Hines’s employment over which New Tech had control, “there is absolutely no distinction between Hines’ employment with New Tech and any other ordinary employment relationship.” Dkt. 39. New Tech performed a background and reference check before engaging Hines as a consultant, and it conducted a series of telephone interviews. Dkts. 27-4; 39. New Tech conducted drug testing on Hines two or three times, though Hines does not recall whether these tests were “preemployment or not.” Dkt. 39. New Tech marketed Hines to oil companies, and it helped find him new projects after existing projects were completed. Dkt. 24. New Tech’s contract with Hines requires him to perform his work with “due diligence in a workmanlike manner and according to accepted industry practices,” and it contains specific provisions with regard to how Hines could submit his time and how he would be paid. Dkt. 39. New Tech also generally kept track of its consultants, and Energy XXI contends that Hines would have to call New Tech before taking a day off or leaving a job. Dkt. 24. New Tech required Hines to maintain automobile insurance, and it provided him with liability insurance. Dkt. 39. New Tech also gave Hines specific requirements relating to his invoices, and, of course, it issued his paychecks. Dkt. 24. Energy XXI, on the other hand, had no control over how Hines was paid, and Hines never received any direct payments from Energy XXI. Dkt. 39..
New Tech focuses on Energy XXI’s control over Hines’s work at the Gouda Well and New Tech’s relative lack of control of the work being performed, rather than the overall employment relationship. Hines worked under the direct supervision of Art Craighead, an Energy XXI superintendent, for eight months prior to the incident. Dkt. 37; 40-1. Hines would report to and receive directions from Craighead. Dkt. 37. Hines was in daily communication with Energy XXI regarding operations at Energy XXI’s jobsites, and he moved from job to job with the Energy XXI drilling crew over the eight months. Id.; Dkt. 22. Hines did not consult with anyone at New Tech about these moves and, with the exception of his notations regarding his location on his timesheets, did not even inform New Tech about the changes. Dkt. 37, Exh. A at 203, 211. After the incident, Hines consulted with Tim Walker, Energy XXI’s completions engineer, about how to handle the situation. Dkt. 37 & Exh. A at 140-42. He also spoke with Craighead, Steve Nelson, and Mark Magner — all Energy XXI employees. Hines did not talk with anyone at New Tech about what to do on the well following the incident. Dkt. 37. Moreover, Hines testified that New Tech had no involvement with his work at Energy XXI’s well. Id.
While New Tech initially hired Hines, conducted drug tests, controlled how Hines would receive his paychecks, and contractually required him to perform his work for Energy XXI in a good and workmanlike manner, it did not exercise control over the actual work Hines performed at Energy XXI’s wells. Testimony from Energy XXI officials demonstrates that Energy XXI exercised control over Hines’s work. When asked if “Energy XXI was controlling and defining the scope of the work that Hines was expected to perform on behalf of Energy XXI,” Steve Nelson of Energy XXI responded, “Absolutely.” Dkt. 25, Exh. B at 29. Additionally, Nelson agreed that the communications between Hines and Craighead and Walker were “frequent.” Id. at 30. Moreover, when asked if Walker' and Craighead were reviewing what Hines was doing, Nelson again responded, “Absolutely.” Id. at 31-32. Finally, when Tim Walker was asked during his deposition if Hines “was basically working at the sole direction and control of Energy XXI,” including Walker and Craighead, Walker replied, “Yes.” Dkt. 25, Exh. D at 33-34. Thus, Energy XXI, not New Tech, controlled Hines’s actual work at the Gouda Well.
New Tech also did not have a significant right to control the actual work Hines was performing at the Gouda Well. While Hines was contractually obligated to perform his work in a good and workmanlike manner and there is some testimony indicating that, in general, a company man can contact his main employer when he has substantive questions about his work, according to Craighead and Nelson, Hines could not contact New Tech for advice relating to operations at the Gouda Well without Energy XXI’s permission; if Hines did call New Tech’s engineers, New Tech would bill Energy XXI for the engineers’ time. Dkt. 22, Exhs. E at 19-22, F at 12-14. Moreover, New Tech’s Vice President Jeffrey R. Cummins and Hines both testified that. Hines was not an “employee” of New Tech; rather, he was an independent consultant. Dkt. 25, Exh. E.; Dkt. 37, Exh. A.
Hines worked for Energy XXI for eight months, so New Tech’s absence of control over Hines’s day-to-day work was significant. This is very similar to the factual situation the Fifth Circuit addressed in Lemaire v. Danos & Curole Mar