MEMORANDUM OF DECISION AND ORDER
SPATT, District Judge.
In this case, the plaintiff T-Mobile Northeast LLC (“T-Mobile”) alleges that the Town of Islip (“the Town”) and the Planning Board of the Town of Islip (“the Board” and together with the Town, “the Defendants”) denied its request for a special use permit to construct a public utility wireless telecommunication facility, in violation of the Telecommunications Act of 1996 (the “TCA”), 47 U.S.C. § 332(c) and Article 78 of the New York Civil Procedure Law and Rules. Presently before the Court are T-Mobile’s motion for summary judgment and the Defendants’ cross-motion for summary judgment. For the reasons set forth below, the Court denies T-Mobile’s motion for summary judgment and grants the Defendants’ cross-motion for summary judgment.
I. BACKGROUND
Unless otherwise indicated, the following constitutes the undisputed facts of the case derived from the administrative record in this case and the parties’ submissions, accompanying affidavits and Rule 56.1 Statements.
A. The Parties
T-Mobile is a “telecommunications carrier” that is considered a public utility for zoning purposes. See Cellular Tel. Co. v. Rosenberg, 82 N.Y.2d 364, 371-72, 604 N.Y.S.2d 895, 624 N.E.2d 990 (1993). T-Mobile is a wholly owned subsidiary of T-Mobile USA, Inc., and uses licenses issued to T-Mobile USA, Inc. by the Federal Communications Commission (“FCC”). These licenses were issued to T-Mobile, USA, Inc. and its affiliates to provide personal wireless services, as defined under federal law, within the state of New York, including Suffolk County and the Town of Islip.
The defendant Town of Islip delegates its local zoning decisions regarding the siting and construction of wireless communications facilities to the defendant Board. Article 68 of the Code of the Town of Islip (the “Town Code”) contains a provision that addresses the regulation of the siting and installation of wireless telecommunications facilities. See Town Code, Chapter 68, Zoning, Article XXXIY, Miscellaneous Provisions, § 68-420.1 “Wireless communications facilities; amateur radio towers; satellite antenna.” Pursuant to Town Code § 68-420.1A(4)(a), all applications for siting and installing wireless communications facilities, regardless of location, are subject to both site plan approval and special permit approval by the Board.
B. T-Mobile’s Network
As T-Mobile explains, to provide wireless service, T-Mobile creates a network of individual but interconnected “cell sites”, which are antenna facilities consisting of radio antennas and equipment that sends and receives radio signals to and from customers’ portable wireless communications handsets and mobile telephones. T-Mobile’s wireless antennas receive and transmit low power radio signals from wireless telephones and relay the signals through the attached electronic equipment into the “land line” telephone infrastructure enabling wireless calls to be routed anywhere in the world. (Pl.’s 56.1 Stmt., ¶ 6.)
Each cell site serves a small geographic area and has height requirements that vary according to local topography, vegetation, and the configuration of existing structures. {Id., ¶ 7.) According to T-Mobile, due to federal licensing regulations, each cell site has limited transmission power and a limited number of channels thereby restricting the number of telephone calls the cell site can accommodate. {Id., ¶ 8.) If there are too few cell sites or if cell sites are located too far apart, wireless telephone users serviced by T-Mobile may experience what T-Mobile defines as “unreliable service”, which includes “disconnection of calls and static and difficulty placing and maintaining calls.” {Id., ¶ 9.)
C. T-Mobile’s Application
T-Mobile purports to have identified a significant service gap in Bayport, which is a hamlet in the Town of Islip. To fill that gap, T-Mobile claims it must build a monopole or tower, affix to it public utility wireless telecommunications antennas and install related equipment on the ground (hereinafter “Proposed Facility”). The following description of the Proposed Facility is undisputed:
• The Proposed Facility would consist of a 120 foot brown monopole and ground-based equipment on a concrete pad and set within a 13 feet 6 inches by 28 feet 10 inches fenced communications compound. Six public utility wireless telecommunications antennas would be concealed with the monopole. The Proposed Facility would be surrounded by 8-foot tall shrubs around the perimeter of the compound to screen the equipment.
After initial consultation with the Planning Department, T-Mobile found an area to build the Proposed Facility within the Suffolk County Girls Scouts Camp Edey located at 1500 Lakeview Avenue, Bayport, New York (hereinafter “Premises” or “Camp Edey”), which is located in a Residential AAA zoning district. Camp Edey is a heavily wooded property spanning approximately 94 acres, which is surrounded by a camp ground, nature preserve, and residential uses. Approximately 125 feet from the site is the Sans Souci Nature Preserve and the Sans Souci Lakes.
According to T-Mobile, although the Premises is residentially zoned, it was chosen as the most favorable site inasmuch as it achieves an optimal balance between meeting T-Mobile’s coverage needs and minimizing impact on the surrounding area because the Premises is large enough so that the Proposed Facility can be located far from residences and the Premises primarily consists of densely wooded land, which serves as a natural visual buffer for the Proposed Facility.
The Town of Islip regulates the approval of wireless telecommunication facilities within its borders through Article 68 of the Town Code. Pursuant to Section 68-420.1 of the Town Code, any construction of a wireless telecommunications facility requires a special use permit. Section 68-420. 1(A)(1) states the “Purpose” of the ordinance as follows:
In recognition of advancing technology and the increased demand and need for wireless communications towers and facilities, the Town of Islip hereby determines that it is in the public interest to regulate the siting and installation of such facilities within the Town in order to protect the public health, safety and welfare. Therefore, the Board hereby determines to establish general guidelines for the siting of wireless communications towers that reflect two preferences: that wireless service providers utilize existing towers, buildings and structures to minimize the construction of new towers, and that wireless communications facilities are located in commercial and industrial districts rather than in residential districts. In furtherance of these objectives, due consideration shall be given to the Town’s Comprehensive Plan, existing land uses and development, environmentally sensitive areas, aesthetics and other appropriate factors in approving sites for the location of towers and/or facilities.
Section 68-420.1(A)(4) provides specific objective requirements for the proposed wireless telecommunications facilities that differ based on whether the proposed facility is located in an area zoned as Residential, § 68-420. 1(A)(4)(a), Commercial,
§ 68-420.1(A)(4)(b), Historic district, § 68-420.1(A)(4)(c), or Park and scenic vistas, § 68-420.1(A)(4)(d).
Because the Premises was zoned Residential AAA, the objective requirements were set forth in § 68-480.1(A)(4)(a), which provides:
Wireless communications facilities located in residential zoning districts are subject to site plan approval and special permit approval from the Planning Board, and must meet the following requirements:
(1) Wireless communications facilities on buildings shall be no higher than 20 feet above the maximum permitted height of the principal structure.
(2) A tower base shall be set back from the property line by a minimum distance of 110% of the height of the tower.
In addition to these objective requirements for constructing a facility in a Residential zone, there are a number of generally applicable provisions relating to collocation, design, removal, and applicable requirements. See § 68-420.1(A)(5)-(A)(8). Only the section relating to the “Design” of the proposed facility is relevant to the instant litigation. The parties agree that the portion of these provisions applicable to the Proposed Facility were as follows:
(a)The tower shall be designed in such a manner as to minimize any visual impacts pursuant to the Planning Board;
(c) Buildings accessory to wireless communications facilities shall be screened, landscaped and designed to minimize any visual impacts pursuant to the Planning Board;
(d) The base area shall be surrounded by a six-foot high fence. The surrounding fence shall be screened by a continuous row of evergreen trees of at least six feet in height and planted five foot on center at time of installation;
(f) A tower shall not be lighted unless required by the FAA.
Finally, section 68-420.1(A)(9) sets forth the following additional factors that the Board may consider in determining whether to grant a special use permit to construct a wireless communication facility: (9) Considerations
(a) Priorities
[1] The Board may give priority to application for location on an existing structure or building.
[2] The Board may give priority to applications for collocation.
[3] The Board may give priority to a single application for multi-antenna proposals.
(b) Other Considerations
[1] The minimum height necessary to render adequate service.
[2] Proximity to residential districts and other structures.
[3] Nature of existing or proposed uses of adjacent property.
[4] Site and/or surrounding topography.
[5] Surrounding tree coverage and foliage.
[6] Design of tower, in particular the characteristics that have the effect of reducing or eliminating visual obtrusiveness.
[7] Availability of suitable existing towers and structures.
[8] Proposed ingress and egress.
(c)The Board may waive or reduce the burden on the applicant of one or more of these criteria if it concludes that the goals of this section are better served thereby.
On September 28, 2007, T-Mobile submitted an “Application for Modification of Land Usage” to the Planning Department seeking a special permit and modification of site plan approval to construct the Proposed Facility at the Premises (“the Application”).
As part of the initial application, T-Mobile submitted the following documents:
(1) Affidavit of Radio Frequency (hereinafter “RF”) Engineer Regarding Physical Need of Sean Reid, an RF Engineer for T-Mobile, stating the proposed antennae must be affixed at least as high as 120-feet in order to ensure reliable service for T-Mobile users in the vicinity of the site (R. at 30-32);
(2) Affidavit of Good Faith Effort to Colocate and Alternative Sites Considered, sworn to by James Korwan, the Vice President of JP & C Consulting Group, Inc., a site acquisition consulting firm representing T-Mobile in the Long Island market, stating that it had been unable to find a suitable location for collocation; Bayport had failed to respond. to T-Mobile’s request to identify municipal buildings that may be an option; that it had considered a number of properties owned by Suffolk County that the County refused to lease; and that potentially suitable properties in commercial areas were ruled out because they were closer to residences to the Premises (R. at 37-39);
(3) a One-Mile Radius Visual Study (hereinafter “One-Mile Study”) prepared by Freudenthal & Elkowitz Consulting Group, Inc. (hereinafter “Freudenthal”), which relied on the results of a “crane test” in order to determine where, within a one-mile radius of the Proposed Facility, it would be visible (R. 766-777). The One-Mile Study concluded that the Proposed Facility would be at least partially visible from only three locations within a one-mile radius, and that all additional areas within the one-mile radius had no visibility due to vegetation and existing structures. (R. at 770.)
On July 29, 2008, T-Mobile submitted additional materials to the Planning Department including: (1) maps reflecting all of the existing, approved, and proposed facilities of telecommunications carriers other than T-Mobile within five miles of the Proposed Facility; (2) information regarding property owners that live within 200 feet of the perimeter of the Premises; and (3) revised site plans.
D. The Hearing on T-Mobile’s Special Use Permit Application
On August 7, 2008, the Board held a public hearing on the Application (“the Hearing”). At the Hearing, T-Mobile presented the live testimony of five expert witnesses.
First, T-Mobile offered the testimony of Neil MacDonald (“MacDonald”), a licensed New York State Registered Architect and partner in the firm of William F. Collins, ALA Architects, LLP, who testified that the Proposed Facility: was designed to minimize its intrusiveness; would be located 409 feet west of the nearest residential property in compliance with the setback requirements in the Town Code; included a 120-foot monopole designed as a “stealth structure” where the antennae were contained within the pole, and which would be painted brown to “blend in” with the surrounding trees and forests; and that the Proposed Facility would be surrounded by an opaque PVC vinyl fence, which in turn would be surrounded by landscaping to further screen the equipment.
In response to questions from the Board, MacDonald confirmed that other carriers would be able to collocate on the monopole and that there were no other existing structures within the fall zone that could be impacted if the tower fell, a probability that MacDonald testified was unlikely given that the pole was designed in compliance with New York State wind loading criteria. In addition, MacDonald stated that the estimated average height of the surrounding trees was 60 feet, (R. at 527), and did not deny that the monopole was visible, and would be more visible in the wintertime. Rather, MacDonald stated, because the pole was brown, “in the winter you may see more of a brown pole”. (R. at 526.)
Erin Duffy (“Duffy”), a project manager from Freudenthal, testified about the aesthetic and environmental impact of the Proposed Facility, and presented the results of a Planning, Zoning and Visual Impact Analysis (“the Visual Impact Analysis”). Included with Duffy’s report were photographs of the existing conditions at the Premises, as well as photographic simulations of how the Premises might appear with the addition of T-Mobile’s Proposed Facility. After discussing the surrounding area and design of the facility and the photosimulations, Duffy concluded that, based on the surrounding area and design of the facility, that:
“[t]he Proposed Facility will be visible from certain vantage points; however, there are many locations throughout the surrounding neighborhoods from which the proposed facility would not be visible. Moreover, given the proposed design of the facility, antennas concealed within a brown unipole, and the surrounding mature vegetation, the proposed facility in many areas will blend with the horizon. As such the overall potential visual impact would not be significant.”
(R. at 541.) Duffy also testified that there would be no negative impacts on the surrounding wildlife or wetlands. Duffy further concluded that “the installation on the proposed facility will not result in substantial changes to the physical characteristics in the area, nor will it result in significant adverse impacts to the neighborhood character or the environmental conditions of the area.” (R. at 542.)
Mitchell K. Baum (“Baum”), a RF engineer from T-Mobile, testified as to T-Mobile’s need for the Proposed Facility, and submitted an Affidavit of Radio Frequency Engineer. Attached to the Baum Affidavit were maps that depicted T-Mobile’s existing coverage and the current gap in service coverage, for both in-building and in-vehicle, as well as the coverage that would be afforded to residents of Bay-port and current and future customers of T-Mobile by the Proposed Facility.
Finally, Michael Lynch (“Lynch”), a New York State certified commercial real estate appraiser, testified that given the design of the Proposed Facility, its setting in a heavily wooded pine evergreen-type parcel, and its distance to the nearest residences, the Proposed Facility would not result in any adverse effects to nearby property values. In addition, Lynch prepared and submitted a report (hereinafter “Real Estate Report”) to the Planning Board at the Hearing, purporting to show that, based on studies of property values in other Long Island communities where similar towers were constructed, no correlation had been found between the presence of wireless telecommunication facilities and declining property values in the Long Island residential communities studied.
Also testifying in support of the application was Yvonne Grant, the president of the Girl Scouts of Suffolk County. Grant testified about the financial stability the Proposed Facility would provide to the Girl Scouts, as well as the fact that it had received strong approval from the Girl Scout board. When questioned by the Planning Board as to whether girls play in the area of the Proposed Facility, Grant answered, “To our knowledge no. The girls would not be playing in the woods themselves or in this area where the pole is to be located.” (R. at 575.) At the Hearing, when asked by the Planning Board if the Girl Scouts would be willing to make the area around the pole a prohibited area, Grant responded, “Absolutely.” (Id.)
Prior to the Hearing, T-Mobile became aware of a number of concerns in the community regarding the placement of the Proposed Facility in Camp Edey. In response, T-Mobile submitted the following additional documents to address these concerns:
• a letter from the New York State Office of Parks, Recreation and Historic Preservation (“SHPO”), dated January 4, 2008, finding that T-Mobile’s project would have no effect upon cultural resources in or eligible for inclusion in the National Registers of Historic Places. (R. at 507-08; 534; 824.)
• a letter of Determination of No Hazard to Air Navigation (hereinafter “No Hazard Letter”) from the Federal Aviation Administration (“FAA”), dated January 4, 2008, stating they had conducted an aeronautical study, which revealed that the structure would not exceed obstruction standards and would not be a hazard to air navigation. In addition, marking and lighting were not found to be necessary for aviation safety. (R. at 820-22.)
• a Letter of Non-Jurisdiction from the New York State Department of Environmental Conservation Division of Environmental Permits dated May 19, 2008, stating that the Department of Environmental Conservation (DEC) had determined that T-Mobile’s Proposed Facility was more than 100 feet from regulated freshwater wetlands, and therefore an additional permit pursuant to the Freshwater Wetlands Act (Article 24) and its implementing regulations (6 NYCRR Part 663) was not required. (R. at 45-47; 823.)
A representative from the Bayport Civic Association, Robert Draffin, and eleven residents testified in opposition to the Application. Draffin read into the record a letter he had written to the Board on behalf of the Bayport Civic Association, wherein he objected to the Application on the following grounds: (1) the Premises was located in a Residential AAA zone and there was no indication that T-Mobile had engaged in a “serious effort” to collocate: (2) the Proposed Facility would be harmful to the environment insofar as (a) Camp Edey was identified in the Town’s 2007 Green’s Creek and Brown’s River Management Plan as a “nature preserve” and the “the clear-cutting of hundreds of square feet of this pristine land for a 120-foot structure runs counter to the intentions set forth the Towner’s own watershed protection plain” and (b) Camp Edey is in the flight path for migratory birds and therefore the tower would resulted in numerous “Birdkills”; (3) the Proposed Facility lies within the flight path of the Bayport Aerodome, which has no tower and unlit, grass runways, and where often times “open cockpit aircraft in excess of 60 years old without avionics” fly in inclement weather conditions, and therefore creates a “needless risk that should be avoided at all costs”; (4) the size of the tower adversely affects the nature and character of the hamlet because the tower is “400% to 600% taller than anything.else existing in Bayport and would truly stand out like a sore thumb” and “will forever change the skyline that we enjoy when looking over the Sans Souci Preserve”; and (5) the detrimental health effects of cell tower radiation on humans, and particularly on children. (R. at 134-35.)
Draffin also submitted into the record: two newspaper articles objecting to the Proposed Facility, one of which was written by Draffin; two newspaper articles objecting to the proposed towers in other Long Island towns; and two letters from Bayport citizens objecting to the Proposed Facility. One of the resident letters objected to the Proposed Facility on aesthetic grounds and the negative impact on the nature and character of the community. In particular, the resident highlighted the efforts to “preserve Bayport’s ‘heritage’ with organized beautification efforts”, and argued that the placing the Proposed Facility in Camp Edey would “destroy” the “essence of these fine efforts”. (R. 132-133.)
At the Hearing, the testimony of the other eleven residents focused predominantly on the purported detrimental effects of radiation from cell phone towers on humans and wildlife. In addition, residents questioned the adequacy of-T-Mobile’s visual impact analysis and testified about the negative aesthetic impact of the proposed tower on their enjoyment of their view of the nearby Sans Souci Nature Preserve, as well as the property values of their home; the incompatibility of the Proposed Facility with the nature and character of the area; safety concerns with respect to children who play in the area near the Proposed Facility, regardless of whether they are trespassing; and the safety of pilots flying antique planes from the Bayport Aerodome.
At the conclusion of the Hearing, Sean Colgan (“Colgan”), Senior Planner for the Town of Islip Planning Department, testified on behalf of the Planning Department’s preliminary findings regarding the Proposed Facility, during which he identified a number of concerns relating to the aesthetic impact of the Proposed Facility; the impact on wildlife in the area; whether there were less intrusive options given the fact that the proposed tower would provided coverage to “a vast amount of open space where service coverage is generally not needed”; and the possibility of alternative sites. (R. at 668-670.)
E. Post-Hearing Submissions
Subsequent to the Hearing, the record was supplemented by both T-Mobile and members of the community. In response to requests by the Planning Department, T-Mobile conducted a second crane test showing the visual impact of the Proposed Facility in the winter during “leaf-off’ conditions (“the ‘Leaf-Off Analysis”). The results of the “Leaf-Off’ Analysis indicated that the Proposed Facility “would be partially visible from a few points along the residential streets to the east of the proposed facility location” and that “the crane was partially visible when looking north from Montauk Highway across the Sans Souci Lakes”. (R. at 388.) Because the “Leaf-Off’ Analysis found that “[t]he visibility of the Proposed Facility would be limited to an area within approximately one-quarter mile of the Proposed Facility”, and that “the design of the facility ... is such that potential visual impacts would be further mitigated”, the “Leaf-Off’ Analysis ultimately concluded that “the Proposed Facility would not result in significant adverse visual impacts. (R. at 392.)
In addition, T-Mobile submitted supplemental affidavits and propagation maps reflecting that collocation on four additional sites would not remedy the coverage gap, nor would placing a 140-foot antenna on a building in an Industrial Area recommended by the Planning Department staff. As to the aviation concerns, T-Mobile submitted a letter from the Town Department of Aviation, concurring with the FAA’s determination that the Proposed Facility did not pose a safety risk. However, in an abundance of caution, the Town’s Aviation Department recommended adding a red beacon light on the tower.
With respect to members of the community, the record was supplemented with a number of letter and articles addressing the health concerns raised by cell towers as well as other safety concerns; and letters from long-time residents and a member of the New York State Assembly on behalf of “many constituents” objecting to the negative aesthetic impact of the tower on the scenic views and its negative impact on the nature and character of the community.
F. The Staff Report
After reviewing T-Mobile’s initial application, as well as the additional documents and information T-Mobile submitted after the Hearing, the staff of the Planning Department prepared a report for the Board, in which it recommended granting the Application (“the Staff Report”). The relevant portions of the Staff Report are as follows. First, the Staff Report noted that options for collocation, siting towers in commercial and industrial districts, and siting the tower in a different residential district were all reviewed and rejected as insufficient to service the coverage gap. The Staff Report then goes on to address five areas of concern: (1) the nature and character of the area; (2) aviation safety; (3) environmental impacts; (4) the amount of coverage gained; and (5) the visual impact of the Proposed Facility. The Staff Report concluded that T-Mobile’s supplemental submissions had satisfied their concerns, and recommended that the Board approve the Application. The Staff Report summarized their rationale as follows:
• The applicant has demonstrated that no structure or building can accommodate the applicant’s proposed antenna that provides similar coverage to the proposed tower.
• The surrounding tree foliage, albeit not completely, blocks much of the view of tower from the residences nearby.
• There has been expressed interest from other carriers for collocation on this tower, thereby potentially eliminating the need for multiple towers in the area.
• The tower has been situated and designed to reduce or eliminate visual obtrusiveness.
• A significant coverage gap will be serviced with the installation of this tower.
• While it is a preference that wireless communications facilities be located in commercial/industrial districts rather than residential, it is not a requirement.
• Given the nature and character of the area, it would be difficult to site this tower in an area that would be less obtrusive. In that regards, the staff believes the proposed facility is the least obtrusive means for T-Mobile to provide reliable service in this area and that this is the most acceptable location for the proposed tower in accordance with the Town Code and limitations of the Federal Telecommunications Act.
(R. at 681-82.)
G. The Second Hearing
On January 21, 2010, the Board held a second public hearing (the “Decision Hearing”) in which the Board voted to deny T-Mobile’s application for the Proposed Facility. At the Decision Hearing, T-Mobile’s counsel summarized the history of the application, the prior hearing, and the exchange of correspondences between T-Mobile and the Planning Department. Specifically, T-Mobile indicated that they had considered and ruled out all of the alternative sites proposed by the Planning Department. In addition, T-Mobile provided the results of the “Leaf-Off’ Analysis, which T-Mobile stated “showed that because of the tree[] buffer there would be very little impact to the surrounding area”. (R. at 688.)
On behalf of the Bayport Civic Association, Draffin again spoke out in opposition to T-Mobile’s application. Draffin disputed that the residents had been notified of the second crane test, but stated that a resident who noticed that the second crane test was taking place took photographs. According to Draffin, these three photographs demonstrate that the proposed tower would be widely visible, and undermined the accuracy of the photographs provided by T-Mobile. In addition, Draffin submitted a letter to the editor that he had written objecting to the Proposed Facility; a letter from Draffin to the Board objecting to the fact that he had not been notified of the second crane test; denials by seven different planning boards of T-Mobile siting applications; a letter from George Mitchell on behalf ,of the Bayport Aerodome Society expressing safety concerns; and a letter from a relative of the first director of Camp Edey. Draffin also referenced a petition signed by 300 residents in opposition to the Proposed Facility, however that petition was not included as part of the record.
Subsequently, Colgan, on behalf of the Planning Department, read the Staff Report into the record. Two Board members then spoke out in opposition to the Application, arguing that the Proposed Facility would have a negative aesthetic impact on the community, and that T-Mobile had failed to show that a significant amount of coverage would be gained from the Proposed Facility.
II. The Decision and the Instant Action
In a written decision dated January 22, 2010, the Board denied the Application (the “Denial”) based on the following conclusions:
1. The applicant failed to establish a need for service within the coverage gap given the abundance of passive areas where wireless communications service is not needed.
2. The Planning Board determined the proposed 120' tower was not in keeping with the nature and character of the area.
3. The Planning Board determined that the proposed tower adversely impacted the park uses in the area which are permitted in a residential zone.
4. The safety concerns raised regarding the proposed tower’s proximity to the Bayport Aerodrome still remained.
5. There were significant adverse aesthetic impacts to nearby residential properties.
(R. at 867.)
On February 17, 2010, T-Mobile filed the instant complaint asserting that the Denial violated Section 332(c)(7)(B)(iv) of the TCA because it was improperly based on the health risks from the Proposed Facility; was not supported by substantial evidence in violation of the Telecommunications Act of 1996, 47 U.S.C. § 332(c); violated Article 78 of the New York Civil Procedure Law and Rules because it was not supported by substantial evidence; was an abuse of discretion; and was arbitrary and capricious. T-Mobile now moves for summary judgment on all three causes of action. The Defendants cross-move for summary judgment on the same claims.
II. DISCUSSION
A. Legal Standard for Summary Judgment
Pursuant to Federal Rule of Civil Procedure 56(c), a court may not grant a motion for summary judgment unless “the pleadings, depositions, answers to interrogatories, and admissions on file, together with affidavits, if any, show that there is no genuine issue as to any material fact and that the moving party is entitled to judgment as a matter of law.” Fed.R.Civ.P. 56(c); Globecon Group, LLC v. Hartford Fire Ins. Co., 434 F.3d 165, 170 (2d Cir. 2006). In determining whether an issue is genuine, “[t]he inferences to be drawn from the underlying affidavits, exhibits, interrogatory answers, and depositions must be viewed in the light most favorable to the party opposing the motion.” Cronin v. Aetna Life Ins. Co., 46 F.3d 196, 202 (2d Cir.1995) (citing United States v. Diebold, Inc., 369 U.S. 654, 655, 82 S.Ct. 993, 8 L.Ed.2d 176 (1962) (per curiam), and Ramseur v. Chase Manhattan Bank, 865 F.2d 460, 465 (2d Cir.1989)).
If the moving party meets its initial burden of demonstrating the absence of a disputed issue of material fact, the burden shifts to the nonmoving party to present “specific facts showing a genuine issue for trial.” Fed.R.Civ.P. 56(e). The nonmoving party may not then rely solely on “conclusory allegations or unsubstantiated speculation” in order to defeat a motion for summary judgment. Scotto v. Almenas, 143 F.3d 105, 114 (2d Cir.1998). If the evidence favoring the nonmoving party is “merely colorable ... or is not significantly probative, summary judgment may be granted.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 249-50, 106 S.Ct. 2505, 91 L.Ed.2d 202 (1986) (internal citations omitted).
B. The Telecommunications Act
The Telecommunications Act of 1996 (“TCA”) is “an omnibus overhaul of the federal regulation of communications com'panies,” the purpose of which is to “provide for a pro-competitive, de-regulatory national policy framework designed to accelerate rapidly private sector deployment of advanced telecommunications and information technologies and services ... by opening all telecommunications markets to competition .... ” Sprint Spectrum, L.P. v. Willoth, 176 F.3d 630, 637 (2d Cir.1999) (quoting H.R. Conf. Rep. No. 104-458, at 113 (1996), reprinted in 1996 U.S.C.C.A.N. 124, 124). “One of the means by which [Congress] sought to accomplish these goals was reduction of the impediments imposed by local governments upon the installation of facilities for wireless communications, such as antenna towers.” City of Rancho Palos Verdes, Cal. v. Abrams, 544 U.S. 113, 115, 125 S.Ct. 1453, 161 L.Ed.2d 316 (2005). Thus, Congress amended the TCA to include section 332(c)(7), which “preserved the authority of state and local governments over zoning and land use issues, but imposed limitations on that authority.” New York SMSA Ltd. P’ship v. Town of Clarkstown, 612 F.3d 97, 101 (2d Cir.2010) (citing 47 U.S.C. § 332(c)(7)).
Pursuant to section 332(c)(7), local governments retain authority over “decisions regarding the placement, construction, and modification of personal wireless service facilities”, § 332(c)(7)(A), but may not “unreasonably discriminate among providers of functionally equivalent services,” § 332(c)(7)(B)(i)(I), take actions that “prohibit or have the effect of prohibiting the provision of personal wireless services,” § 332(c)(7)(B)(i)(II), or deny a request “on the basis of the environmental effects of radio ■ frequency emissions,” § 332(c)(7)(B)(iv). In addition, the TCA establishes procedural requirements that must be met when evaluating an application to construct a wireless facility. For example, the denial of a request to construct a wireless facility must be “in writing and supported by substantial evidence” in the record. 47 U.S.C. § 332(c)(7)(B)(iii).
C. As to T-Mobile’s Claim that the Defendants Violated the TCA by Denying the Application Based on Health Concerns
The TCA expressly prohibits a local zoning board from denying an application that is otherwise compliant with FCC emissions regulations “on the basis of the environmental effects of radio frequency emissions”. 47 U.S.C. § 332(c)(7)(B)(iv). “Environmental effects within the meaning of the provision include health concerns about the biological effects of RF radiation.” T-Mobile Northeast LLC v. Town of Ramapo, 701 F.Supp.2d 446, 460 (S.D.N.Y.2009). Here, it is undisputed that the Proposed Facility would be in compliance with FCC emissions regulations.
At the Hearing, the Board recognized the FCC’s exclusive jurisdiction concerning potential or perceived health risks, and repeatedly stated that testimony regarding such concerns was not relevant to T-Mobile’s application. However, the Board did encourage residents to further comment, submit additional materials, and contact their elected representatives regarding the perceived health effects. (R. at 624-25, 627-29.) Indeed', a significant amount of the resident testimony at the Hearing and subsequent submissions were focused on perceived detrimental health effects of the Proposed Facility. (See, e.g., R. at 64-67, 68-71, 605-09, 621, 638, 664.)
However, the mere fact that members of the community raised health concerns does not violate the TCA. See Cellular Tel. Co. v. Town of Oyster Bay, 166 F.3d 490, 495 (2d Cir.1999). Rather, the TCA is violated when a zoning board’s denial of an application for a wireless facility is based in part on those concerns. Town of Ramapo, 701 F.Supp.2d at 460 (“[A]ny decision actually based on environmental effects is a violation, whether other legitimate reasons factored into the decision or not.”). Where, as here, the Board did not explicitly include environmental or health concerns as a basis for denying the Application, but “testimony is almost exclusively directed to health effects”, the Second Circuit has directed that “there must be substantial evidence of some legitimate reason for rejecting the applications to avoid the conclusion that the denials were based on the impermissible health effects ground.” Town of Oyster Bay, 166 F.3d at 495. As set forth below, because the Court finds that the Board’s Denial of T-Mobile’s Application was supported by substantial evidence on the legitimate grounds of aesthetic concerns and the need for service, the Court finds that the Defendants did not violate section 332(c)(7)(B)(iv) of the TCA. Accordingly, T-Mobile’s motion for summary judgment on its claim that the Defendants violated 47 U.S.C. § 332(c)(7)(B)(iv) is denied and the Defendants’ cross-motion for summary judgment on this claim is granted.
D. As to T-Mobile’s Claim that the Defendants Violated the TCA Because the Denial was
Not Supported by Substantial Evidence Pursuant to TCA section 332(c)(7)(B)(iii): 47 U.S.C. § 332(c)(7)(B)(iii). To determine whether a denial was supported by substantial evidence, courts “must employ ‘the traditional standard used for judicial review of agency actions.’ ” Cellular Tel. Co. v. Town of Oyster Bay, 166 F.3d 490, 494 (2d Cir.1999) (quoting H.R. Conf. No. 104-458, at 208 (1996), reprinted in 1996 U.S.C.C.A.N. 124, 223). Substantial evidence requires “less than a preponderance, but more than a scintilla of evidence [and] ‘means such relevant evidence as a reasonable mind might accept as adequate to support a conclusion.’ ” Id. (quoting Universal Camera v. NLRB, 340 U.S. 474, 477, 71 S.Ct. 456, 95 L.Ed. 456 (1951)). “Whether an administrative agency determination is shored up by substantial evidence is a question of law to be decided by the courts.” Sprint Spectrum L.P. v. Willoth, 176 F.3d 630, 645 (2d Cir.1999) (quoting 300 Gramatan Ave. Assocs. v. State Div. of Human Rights, 45 N.Y.2d 176, 181, 408 N.Y.S.2d 54, 379 N.E.2d 1183 (1978)).
[a]ny decision by a State or local government or instrumentality thereof to deny a request to place, construct, or modify personal wireless service facilities shall be in writing and supported by substantial evidence contained in a written record
In reviewing a zoning board’s decision, the Court must view the record in its entirety, including evidence opposed to the Board’s view, and “may neither engage in [its] own fact-finding nor supplant the Town Board’s reasonable determinations.” Town of Oyster Bay, 166 F.3d at 494. When evaluating whether a denial was supported by substantial evidence, “local and state zoning laws govern the weight to be given the evidence.” Id. Thus, while the TCA governs the “procedural requirements that local boards must comply with in evaluating cell site applications” the applicable substantive standards are the “established principles of state and local law”. Id. (citation and internal quotation marks omitted).
Here, the applicable local law is Section 68-420.1(A) of the Town Code, which sets forth objective requirements and subjective considerations for obtaining
a special use permit to construct a telecommunications facility. In reviewing an application for a special use permit, “[a]l-though the board retains some discretion to evaluate each application, to determine whether applicable criteria have been met, and to make common sense judgments as to whether the application should be granted, such determination must be supported by substantial evidence”. Omnipoint Commc’ns v. Town of LaGrange, 658 F.Supp.2d 539, 558 (S.D.N.Y.2009) (citing Twin County Recycling Corp. v. Yevoli, 90 N.Y.2d 1000, 1002, 665 N.Y.S.2d 627, 628, 688 N.E.2d 501 (1997)). Moreover, the Court notes that T-Mobile relies fairly heavily on the Staff Report’s conclusion that the Proposed Facility met the requirements in the Town Code. Because the Board is the final decisionmaker on whether to approve a wireless carriers special use permit application, the Board “has the authority to reject the findings of fact and recommendation of its hearing staff’. Green Island Assocs. v. Adirondack Park Agency, 178 A.D.2d 860, 861, 577 N.Y.S.2d 722, 724 (3d Dep’t 1991). Nevertheless, “[ajlthough the [Board] was not necessarily bound by the staff report, New York law is clear that a municipal board must base its decision on evidence in the record that would be sufficient to support a denial of the application.” Nextel Partners, Inc. v. Town of Amherst, 251 F.Supp.2d 1187, 1198 (W.D.N.Y.2003) (citing Asma v. Curcione, 31 A.D.2d 883, 298 N.Y.S.2d 286 (4th Dep’t 1969)).
With respect to the applicable state law, because in New York wireless providers such as T-Mobile are afforded the status of public utilities for the purposes of zoning applications, see Cellular Tel. Co. v. Rosenberg, 82 N.Y.2d 364, 604 N.Y.S.2d 895, 624 N.E.2d 990 (1993), their applications are reviewed under the “public necessity” standard established in Consolidated Edison Co. v. Hoffman, 43 N.Y.2d 598, 403 N.Y.S.2d 193, 374 N.E.2d 105 (1978). To establish public necessity in the context of a substantial evidence claim, a carrier must demonstrate that: “(1) its new construction ‘is a public necessity in that it is required to render safe and adequate service’; and (2) ‘there are compelling reasons, economic or otherwise, which make it more feasible’ ”. Omnipoint Commc’ns, Inc. v. City of White Plains, 430 F.3d 529, 535 (2d Cir.2005) (quoting Rosenberg, 82 N.Y.2d at 371-72, 604 N.Y.S.2d 895, 624 N.E.2d 990). This has been interpreted in the context of zoning decisions for wireless facilities to require that the telecommunications provider establish: “[1] that there are gaps in service, [2] that the location of the proposed facility will remedy those gaps and [3] that the facility presents a minimal intrusion on the community”. Site Acquisitions, Inc. v. Town of New Scotland, 2 A.D.3d 1135, 1137, 770 N.Y.S.2d 157, 160 (3d Dep’t 2003).
New York law affords public utility status to wireless carriers so that, “[a] zoning board of appeals has a narrower range of discretion in dealing with special permit applications filed by utilities than is true in the case of the generality of applications.” Town of Lagrange, 658 F.Supp.2d at 555 (citing Omnipoint Commc’ns, Inc. v. Common Council of City of Peekskill, 202 F.Supp.2d 210, 222 (S.D.N.Y.2002)). As a general rule, if the public utility makes the required showing, which necessarily means the record is devoid of substantial evidence to support a denial, the variance must issue. Town of LaGrange, 658 F.Supp.2d at 555. On the other hand, “[i]f the Court finds that even one reason given for the denial is supported by substantial evidence, the decision of the local zoning body cannot be disturbed.” New York SMSA L.P. v. Toum of Oyster Bay Zoning Bd. of Ap peals, No. 08-CV-4833, 2010 WL 3937277, at *4 (E.D.N.Y. Sept. 30, 2010).
As set forth below, a review of the record reveals that a reasonable mind could conclude that the impact of the Proposed Facility was more than “minimally intrusive” based on evidence that the 120-foot monopole, which would be located in a pristine parkland and visible from a number of streets and residences, was not in the nature and character of the surrounding area and would have a negative aesthetic impact on the scenic view of the Sans Souci Nature Preserve and Sans Souci Lakes enjoyed by residents in the community.
Furthermore, even assuming that the objective evidence of a negative aesthetic impact was insufficient to constitute substantial evidence under the more lenient standard afforded to public utilities under New York law, the Court finds that, when balanced against the Board’s finding that the increase in service provided by the Proposed Facility was predominantly in “passive areas”, there can be no dispute that the Board’s Denial of the Application was supported by substantial evidence. Accordingly, the Court denies T-Mobile’s motion for summary judgment with respect to its claim that the Denial violated section 332(c)(7)(B)(iii) of the TCA, and grants the Defendants’ cross-motion for summary judgment to dismiss the substantial evidence claim.
1. Aesthetic Considerations
“[I]n New York, aesthetics can be a valid ground for local zoning decisions.” Cellular Tel. Co. v. Town of Oyster Bay, 166 F.3d 490, 495 (2d Cir.1999) (citing Suffolk Outdoor Advertising v. Hulse, 43 N.Y.2d 483, 402 N.Y.S.2d 368, 373, 373 N.E.2d 263 (1977)). Although a reviewing court would not normally “look far beyond [a local board’s] citing of aesthetics to find a valid basis for a local zoning decision, ... under the TCA, a reviewing court can find that aesthetics qualify as a permissible ground for denial of a permit only if ... there was ‘more than a mere scintilla’ of evidence before the [local board] on the negative visual impact.” Id. (quoting Universal Camera v. NLRB, 340 U.S. 474, 477, 71 S.Ct. 456, 95 L.Ed. 456 (1951)).
Three of the Board’s five grounds for denying the Application were premised on the adverse aesthetic impact of the Proposed Facility. Specifically, the Board’s second reason for denying the Application was that the Proposed Facility “was not in keeping with the nature and character of the area” and its fifth reason for denying the Application was that “[t]here were significant adverse aesthetic impacts to nearby residential properties”. Furthermore, although not clearly stated in the Denial, the Defendants assert that the Board’s third reason for denial based on the Proposed Facility’s “impact on park uses” included “the public’s use of the Sans Souci Lake Preserve, and whose ability to enjoy its natural and undisturbed beauty would be substantially and deleteriously impacted.” (Defs.’ Opp. at 9.)
As an initial matter, T-Mobile argues that, because the Board did not articulate specific objections or cite any evidence in the Denial itself, the aesthetic concerns were necessarily “generalized” and therefore unsupported by substantial evidence. In support of this contention, T-Mobile cites to an unpublished decision from the District of New Jersey, which was not provided to the Court. The Defendants do not cite to any contrary authority. Although the Court’s research reveals no binding precedent from the Second Circuit, there is a Circuit split with respect to what information must be included in the written decision. See Helcher v. Dearborn County, 595 F.3d 710, 717-18 (7th Cir. 2010) (collecting cases). However, most courts have found that “a decision ‘in writing’ is adequate if it provides an explanation that allows [the court], in combination with the written record, to determine if the decision is supported by substantial evidence.” Id. at 719; Second Generation Props., L.P. v. Town of Pelham, 313 F.3d 620, 629 (1st Cir.2002) (“Local zoning boards are lay citizen boards, and while their decisions must be in writing, the boards need not make extensive factual findings in support of their ultimate decision.”). Here, the Court does not need to dig through the record to determine the rationale for the Board’s decision. Not only were the aesthetic objections raised by members of the community in testimony and letters, but they were summarized in the Bayport Civic Association submissions, the Staff Report, and by two members of the Board at the Decision Hearing.
T-Mobile mainly argues that a denial on aesthetic grounds is not supported by substantial evidence because: (1) it is not based on the Town Code; (2) there was insufficient evidence from which the Board could conclude that the Proposed Facility would create more than a “minimal intrusion on the community”; and (3) there is no evidence that more feasible options existed that were less intrusive on the community. The Court will address these objections in turn.
a. Whether the Denial Violates the Town Code
T-Mobile argues that a Denial based on aesthetic grounds cannot be supported by substantial evidence because it was not based on any requirements in the Town Code. In making this argument, T-Mobile focuses predominantly on the objective setback and design requirements in the Town Code. However, this argument ignores the remaining aspects of the Town Code, which: (1) state a preference for locating cell towers in commercial and industrial districts rather than in residential districts; (2) give priority to applications for collocation and towers that are being built on existing structures; (3) require that “due consideration” be given to “existing land uses and development, environmentally sensitive areas [and] aesthetics”; and (4) require the Board to consider a number of factors relating to the nature and character of the area including: “proximity to residential districts and other structures”; “nature of existing or proposed uses of adjacent property”; “site and/or surrounding topography”; and “surrounding tree coverage and foliage”. These additional considerations authorized the Board to consider the aesthetic impact of the Proposed Facility on the residents directly as well as the nature and character of the community.
Similarly without merit is T-Mobile’s contention that, by including the construction of wireless facilities as a permitted use in a residential district, the Board was precluded from finding that the Proposed Facility would have an adverse impact on the community. As a general rule, “inclusion of the permitted use in the ordinance is tantamount to a legislative finding that the permitted use is in harmony with the general zoning plan and will not adversely affect the neighborhood”. Retail Property Trust v. Bd. of Zoning Appeals of Town of Hempstead, 98 N.Y.2d 190, 195, 746 N.Y.S.2d 662, 666, 774 N.E.2d 727, 731 (2002) (citation omitted). Nevertheless, the Board is entitled to deny a special permit if “reasonable grounds exist for its denial, e.g., that the use, although permitted, is not desirable at a particular location”. Holbrook Assocs. Dev. Co. v. McGowan, 261 A.D.2d 620, 621, 690 N.Y.S.2d 686, 687 (2d Dep’t 1999); see, e.g., Brady v. Town of Islip Zoning Bd. of Appeals, 65 A.D.3d 1337, 886 N.Y.S.2d 465 (2d Dep’t 2009); Omnipoint Commc’ns, Inc. v. Town of Islip Planning Bd., 20 Misc.3d 1108(A), 866 N.Y.S.2d 93 (Table) (N.Y.Sup.2008).
In recognition of the multitude of factors concerning the siting of wireless facilities, the Town has broadly written the applicable ordinance to allow a case-by-case determination of whether, although generally permitted in a residential zone, “a particular location” within that zone is “not desirable”. Thus, contrary to T-Mobile’s assertion, the fact that the Town included wireless facilities as a permitted use in a Residential zone is “by no means determinative” with respect to whether “the permitted use is in harmony with the general zoning plan and will not adversely affect the local community”. Sprint Spectrum L.P. v. Willoth, 176 F.3d 630, 645-46 (2d Cir.1999) (quoting WEOK Broad. Corp. v. Planning Bd. of Lloyd, 79 N.Y.2d 373, 383, 583 N.Y.S.2d 170, 592 N.E.2d 778 (1992)).
Accordingly, as long as the record contains objective evidence of an actual adverse aesthetic impact on the surrounding community, the Board was well within its authority under the Town Code to deny the Application an aesthetic grounds.
b. Whether the Denial on Aesthetic Grounds Is Supported by Objective Evidence
As discussed in greater detail in the facts section, T-Mobile submitted studies, photographs, photosimulations and expert testimony on the aesthetic impact of the Proposed Facility, including, but not limited to: (1) a One-Mile Study that found that the Proposed Facility would be at least partially visible from only three locations within a one-mile radius of the Premises, (R. at 770); (2) a “Leaf-Off’ Analysis concluding that, even in the winter, the Proposed Facility “would not result in significant adverse visual impacts”, (R. at 392); (3) testimony from MacDonald, the architect, who testified that the 120-foot monopole was designed to “blend in to the surrounding tree[ ] forest” and that, due to the design and setback from the nearest property line it would be “difficult to see” (R. at 514-15); (4) testimony from Duffy, the planner, who testified that the tower would “blend with the horizon” and that the “overall and potential visual impact would not be significant” (R. at 540); and (5) testimony from Lynch, the real estate appraiser, who testified that the design and location of the Proposed Facility significantly shielded it from nearby residences and therefore would not negatively impact property values. T-Mobile argues that “the evidence presented by the opposition constituted of nothing more than general statements and uniformed speculation”, and therefore the Denial on these grounds was not supported by substantial evidence. (PL’s Opp. at 16.) The Court disagrees.
Objections on aesthetic grounds must “articulate specifically how the proposed cell sites would have an adverse aesthetic impact on the community.” Cellular Telephone Co. v. Town of Oyster Bay, 166 F.3d 490, 495 (2d Cir.1999). To deny a siting application on aesthetic grounds, there must be substantial evidence: (1) that “residents will be able even to see the antennae” and (2) there will be an actual “negative visual impact on the community”. Id. It is well-settled that a “few generalized expressions of concern with ‘aesthetics’ cannot serve as substantial evidence on which the Town could base the denials.” Id. at 496.
Speculative concerns about the “potential visibility” of a proposed tower are unlikely to constitute substantial evidence for denying an application absent some form of objective support in the form of “photographs, site plans, surveys, and the like”. Green Mountain Realty Corp. v. Leonard, 688 F.3d 40, 54 (1st Cir.2012); Omnipoint Commc’ns, Inc. v. Village of Tarrytown Planning Bd., 302 F.Supp.2d 205, 222 (S.D.N.Y.2004) (holding that the “the complaints of a small number of residents at the public hearings about possible visual impacts in the immediate neighborhood of the site or the surrounding national historic district” constituted “unsubstantiated community objection to aesthetics” and therefore was “not sufficient evidence by itself to support the Planning Board’s denial”). With respect to the aesthetic impact, because “it would be a rare event to be able to buffer a communications tower so that it is not visible at all,” OPM-USA-Inc. v. Bd. of County Com’rs of Brevard County, 7 F.Supp.2d 1316, 1324 (M.D.Fla.1997), and “[f]ew people would argue that telecommunications towers are aesthetically pleasing”, courts tend to require objective evidence of a negative visual impact that is “grounded in the facts of the case”. Southwestern Bell Mobile Sys. v. Todd, 244 F.3d 51, 61 (1st Cir.2001). In the Second Circuit, this can be established through “aesthetic objections raised by neighbors who know the local terrain and the sightlines of their own homes.” Omnipoint Commc’ns, Inc. v. City of White Plains, 430 F.3d 529, 534 (2d Cir.2005). Other evidence can include “beautification efforts” or the “actual character of the immediate neighborhood.” T-Mobile Central, LLC v. Unified Gov’t of Wyandotte County, 546 F.3d 1299, 1312 (10th Cir. 2008).
In assessing whether the record contains substantial evidence supporting the Board’s denial of the Application on aesthetic grounds, the Court is guided by the Second Circuit’s decision in Omnipoint Communications, Inc. v. City of White Plains, 430 F.3d 529 (2d Cir.2005). In City of White Plains, Omnipoint sought to construct a wireless facility with a 150-foot tower. Omnipoint submitted evidence in the form of photosimulations that it contended showed that a proposed 150-foot tower “would be invisible or unnoticeable outside of the golf course” in which it was to be built. Id. at 532. The town board questioned the accuracy of the visual impact analysis in light of the fact that “residents were not invited to participate in the study, or notified of it”. Id. In opposition, residents testified that the proposed tower would be “50 feet taller than the tallest deciduous trees in the landscape”, that “the tower would be an eyesore”, and that the tower “would impair the view from [a local temple’s] glass-enclosed chapel”. Id.
The residents also retained experts. One expert testified that “a 150 — foot tower cannot effectively be disguised as an evergreen in a neighborhood where the tallest evergreen is just 51 feet high”, and “[o]ther experts testified on the neighbors’ behalf regarding the anticipated diminution in property values”. Id. The board denied the application for, among other reasons, the “adverse visual impact” created by the proposed tower. Id. at 533.
The district court granted summary judgment to Omnipoint on the ground that the board improperly credited “the unsupported fears of local residents, whose views can only be based on speculation since (1) they have never seen the monopole (as it has not yet been built), and (2) they propounded no countervailing photo simulations of their own” over Omnipoint’s expert study that concluded that “the visual impact would be minimal”. See Omnipoint Commcn’s, Inc. v. City of White Plains, 175 F.Supp.2d 697, 716 (S.D.N.Y. 2001). On appeal, the Second Circuit reversed the district court, holding that:
Given the 150 — foot tower would rise to three times the height of the tallest evergreen tree and would be half again as tall as any other tree in the area, the Board could reasonably conclude (especially given express testimony to that effect) that the tower would be widely visible. In addition, the Board received substantial evidence of the tower’s adverse aesthetic impact. We have no difficulty concluding that the Board’s rejection was based on reasonable and substantial evidence.
Here, the 120-foot tower, by T-Mobile’s own analysis, would .be twice as high as the surrounding trees. T-Mobile’s own photographs show that the tower would be visible from a number of streets and from the Montauk Highway, and the “Leaf-Off’ Analysis reveals increased visibility during the winter. T-Mobile’s architect did not deny that there would be increased visibility in the winter, but rather stated that, because the tower would be painted brown, “in the winter you may see more of a brown pole”. (R. at 526.) As the Staff Report noted that, even with adding trees on the streets with the most substantial view, it would not completely eliminate the view. In fact, the Staff Report emphasized that “[t]he surrounding tree foliage, albeit not completely, blocks much of the view of tower from the residences nearby”. (R. at 681 (emphasis in original).)
T-Mobile argues that the One-Mile Radius Study revealed that the tower would only be visible from three locations in a one-mile radius of the Premises. However, there was sufficient evidence in the record for the Board to doubt this conclusion. For example, during Duffy’s presentation, one of the Board members questioned the accuracy of the photograph from a street view approximately 1,235 feet southeast of the subject site that purported to show that the Proposed Facility would not be visible insofar as it was taken from a “heavily wooded front yard”. (R. at 537-38.) Duffy replied that she could not “say one way or the ot