Citations
- 310 F. Supp. 3d 1230
Full opinion text
M. CHRISTINA ARMIJO, United States District Court Judge THIS MATTER is before the Court on Defendant Environmental Restoration, LLC's Motion to Dismiss the Complaint [Doc. 1] and Motion to Strike [Doc. 32], pertaining to the Complaint filed by the State of New Mexico; and Defendant Environmental Restoration, LLC's Motion to Dismiss the Complaint [Doc. 1] and Motion to Strike [Doc. 101], pertaining to the Complaint filed by the Navajo Nation. The Court has considered the submissions, the relevant law, and is otherwise fully advised in the premises. The Court grants-in-part, denies-in-part, and, in-part, holds in abeyance ER's Motions.
This opinion addresses all arguments raised by Defendant Environmental Restoration (hereafter, ER) with the exception of its arguments based on the jurisdictional bar set forth at 42 U.S.C. § 6972(b)(2)(B)(ii) and 42 U.S.C. § 9613(h). The Court has requested additional briefing and evidence with respect to whether certain of Plaintiffs' claims are barred by the above provisions, and the briefing, which remains in progress. Nonetheless, the Court herein addresses the remaining issues raised by ER.
I. BACKGROUND
A. Procedural Posture
On May 23, 2016, New Mexico filed its Complaint stemming from the Gold King mine spill which occurred on August 5, 2015. [16-CV-465, Doc. 1] On August 16, 2016, the Navajo Nation filed its Complaint based on the Gold King mine spill. [16-CV-931, Doc. 1] On November 28, 2016, this Court consolidated the two cases. [Doc. 90] Both Plaintiffs filed motions for leave to amend their complaints. [Doc. 86; Doc. 141]
Generally, both Plaintiffs allege that, while conducting environmental remediation of the Gold King Mine in Colorado, the Environmental Protection Agency (hereafter, EPA), ER (a contractor for the EPA), and others "breached a collapsed portal" of the mine, "releasing over three million gallons of acid mine drainage and 880,000 pounds of heavy metals into the Animas River watershed." [Doc. 1, ¶ 1; accord. 16-CV-931, Doc. 1, ¶ 1] The acid mine drainage traveled down-river, into the San Juan River, into New Mexico, and into the Navajo Nation, causing extensive environmental and economic damage. [Doc. 1, ¶¶ 1-3; 16-CV-931, Doc. 1, ¶¶ 4, 24]
New Mexico brings six causes of action against ER: cost recovery and declaratory judgment under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); injunctive relief under the Resource Conservation and Recovery Act (RCRA); public nuisance; trespass; and "negligence and gross negligence." [Doc. 1, pp. 32-48; Doc. 86-1, pp. 41-61] Navajo Nation brings seven causes of action against ER: cost recovery and declaratory judgment under CERCLA; negligence; gross negligence; trespass; public nuisance; and private nuisance. [16-CV-931, Doc. 1, pp. 34-46; Doc. 141-1 pp. 46-58] ER challenges each cause of action by both Plaintiffs. [Doc. 32; Doc. 101]
While both Plaintiffs have moved for leave to amend their complaints [Doc. 86; Doc. 141], those motions are opposed and remain pending. On January 23, 2017, this Court entered a Memorandum Opinion and Order stating that this Court will consider whether dismissal of the proposed amended complaints would be appropriate in light of the various Defendants' Motions to Dismiss , thus analyzing whether the proposed amended complaints would be futile. [Doc. 118, p. 6] The Court further rejected ER's arguments that New Mexico's Motion for Leave to File Amended Complaint was untimely and that it prejudiced ER. [Doc. 118, pp. 6-7] Having addressed these issues, the only issue remaining to be considered in determining whether to grant New Mexico's (as well as Navajo Nation's) Motion for Leave to File Amended Complaint is whether amendment would be futile. Accordingly, for purposes of the ER's Motions to Dismiss Plaintiffs' claims, the Court considers the facts as alleged in the Proposed Amended Complaints , thereby conducting the futility analysis. [Doc. 86-1; Doc. 141-1] If dismissal is proper as against ER based on the facts alleged therein, then amendment of the claims as against ER would be futile and the claims against ER must be dismissed.
Finally, on December 11, 2017, ER filed a Motion to Transfer for Coordinated or Consolidated Pretrial Proceedings Under 28 U.S.C. § 1407 with the United States Judicial Panel on Multidistrict Litigation. [Doc. 191-1] Thereafter, the United States filed a Motion to Temporarily Stay Proceedings Pending Decision by the Judicial Panel on Multidistrict Litigation. [Doc. 191] Some parties oppose the Motion to Stay , or oppose only a delay of the decision on their pending motions to dismiss. [Doc. 191, p. 2; Docs. 192, 195, 199] The Court does not address the Motion to Stay [Doc. 191] in this Memorandum Opinion and Order. The Court exercises its discretion to rule on the present motion only, concluding that no cause has been shown to stay the issuance of this decision, including the factors of judicial economy and avoiding hardships and inequities to the moving party. See Pace v. Merck & Co., Inc. , CIV 04-1356 MCA/ACT, 2005 WL 6125457, *1 (D.N.M. 2005) (recognizing the district court has the discretion to stay a case when a motion to transfer proceedings is pending and listing the factors the district court should consider).
B. Allegations
New Mexico alleges:
On August 5, 2015, EPA, EPA's contractors, and the Colorado Division of Reclamation, Mining and Safety ("DRMS"), used an excavator to dig away tons of rock and debris that blocked the portal of the Gold King Mine. Water had been building in the mine and seeping out of the portal for years, and EPA, the contractors, and Colorado officials knew the water was highly acidic and laced with heavy metals. Colorado's records and EPA's work plan not only recognized that the mine was filled with water, but also highlighted the risk of a significant blowout-especially if workers attempted to dig away the blockage. Yet, the work plan ignored this well-understood risk. In fact, EPA's lead official at the Gold King Mine-who was on vacation when the crew triggered the release-had ordered EPA and DRMS employees and EPA's contractor not to excavate the earthen debris blocking the portal and not to drain the mine without setting up equipment to handle the discharge. Further, the lead EPA official-recognizing the hazards at the site-told the crew to wait to excavate until after he returned from vacation and consulted with an engineer from the Department of Interior's Bureau of Reclamation about the risks of EPA's actions at the site. Despite the clear dangers and explicit directions of EPA's project leader, the on-site crew dug into the portal without verifying the hydraulic pressure or taking necessary precautions-with catastrophic consequences.
[Doc. 86-1, ¶ 4]
New Mexico alleges that mining operations at the Gold King Mine ceased in 1992 [Doc. 86-1, ¶ 30] and, in 2004, the Level 7 adit collapsed. [Doc. 86-1, ¶ 63] The Colorado Division of Minerals and Geology inspected the Gold King mine in 1996 and found that it drained one to two gallons of acid mine drainage per minute. [Doc. 86-1, ¶ 53] In 1996 a neighboring mine, the Sunnyside Mine, was sealed using a bulkhead (and a second bulkhead was installed in 2001), causing acid mine drainage to travel through a connecting tunnel, the American Tunnel, to the Gold King Mine. [Doc. 86-1, ¶¶ 39-41] As a result of the collapsed adit and the acid mine drainage from the American Tunnel, Gold King Mine's discharge grew to between 150 and 200 gallons per minute, depending on the season, by 2007. [Doc. 86-1, ¶¶ 53, 63]
In 2008 and 2009, in an attempt to address the acid mine drainage, the Colorado Division of Reclamation, Mining and Safety (DRMS) "secured" the Level 7 adit portal, installed a "grated closure ... to facilitate drainage," diverted the drainage, and then backfilled the Level 7 adit. [Doc. 86-1, ¶¶ 67-68] DRMS planned to install a drainage pipe at the floor of the adit, however, when they attempted to install an observation pipe, the timbers supporting the portal collapsed, and DRMS was never able to complete installation of its originally planned drainage pipe. [Doc. 86-1, ¶¶ 68-72]
"In 2014, DRMS asked EPA to re-open the Gold King Mine Level 7 adit and investigate the drainage situation." [Doc. 86-1, ¶ 78] "EPA requested a work plan for the Gold King Mine investigation from Environmental Restoration and issued a 'Task Order Statement of Work' ('Statement of Work') on June 25, 2014." [Doc. 86-1, ¶ 79] ER submitted a RFP and EPA selected ER as a contractor, "task[ing] Environmental Restoration with 'procur[ing] and manag[ing] the reopening and ground support construction at the Upper Gold King Mine-7 level adit.' " [Doc. 86-1, ¶ 80] EPA's Request for Proposal (RFP) also states that ER would select a subcontractor and " 'conduct operations in oversight management of surface and underground work activities.' " [Doc. 86-1, ¶ 80] EPA, along with one of the sub-contractors, began work in September, 2014, however, after two hours of excavation the crew "abruptly stopped work" and EPA, ER and others determined "that the drainage would require larger settling ponds and additional treatment." [Doc. 86-1, ¶ 83] "[B]efore EPA left the site [in 2014], the construction crew pushed large quantities of earthen material and debris in front of the DRMS-installed pipes, forming an earthen plug that prevented the mine from draining and caused a head of water to further build up behind the blockage." [Doc. 86-1, ¶ 88]
EPA asked employees of another contractor, Weston Solutions, to prepare a report, and EPA's on-scene coordinator submitted the report to EPA Region 8. [Doc. 86-1, ¶¶ 84-85] This report stated that drainage pipe installed by DRMS were "adjacent to the adit roof," in contrast to earlier DRMS records which stated that the pipe was at the adit floor. [Doc. 86-1, ¶ 85] Based on the purportedly erroneous conclusion that the pipe was at the roof, EPA's report stated that the adit floor was six feet below the level of the waste dump surface, again contrary to DRMS's records. [Doc. 86-1, ¶ 86] Further, New Mexico alleges, the EPA "fail[ed] to test and confirm the amount of water behind the adit" despite successfully using this practice on two adjacent mines. [Doc. 86-1, ¶ 87]
In May and June, 2015, ER submitted draft work plans to EPA to continue work on the Gold King Mine. [Doc. 86-1, ¶ 90] EPA, ER, and other contractors visited the site several times "to assess site conditions and drainage flows[;]" collect water samples, grade the surface of the waste dump, and begin construction on a water management and treatment system. Nonetheless, no Defendant tested the "hydrostatic pressure behind the blocked portal." [Doc. 86-1, ¶¶ 90-92] On July 23, 2015, Steven Way, EPA's on-scene coordinator, contacted a Bureau of Reclamation engineer to conduct an independent review of the excavation plans. Mr. Way arranged for the review to be conducted on August 14, 2015, after Mr. Way returned from vacation. [Doc. 86-1, ¶ 93] Mr. Way further arranged for another EPA employee, Mr. Griswold, to supervise the Gold King Mine site from August 3, 2015 until Mr. Way returned from vacation. [Doc. 86-1, ¶ 94]
On July 29, 2015, Mr. Way emailed specific instructions about the scope and timing of work at the Gold King Mine site to Matt Francis (Environmental Restoration), Elliot Petri (Weston Solutions), and Allen Sorenson (DRMS). Later that day, Mr. Way forwarded these instructions to Mr. Griswold. Mr. Way's instructions set out the "priority and strategy" for on-site work during the week of August 3.
[Doc. 86-1, ¶ 95] Before excavation of the earthen debris blocking the adit was to start, Mr. Way instructed ER to "provide 'adit drainage control' and implement a 'water management system[,]' " including setting up a pipe and filter bags; putting a sump and sump-pump in place to "handle adit discharge"; putting piping or a hose in place to direct discharge to a treatment pond; and ensuring that a "stinger pipe" was prepared and available. [Doc. 86-1, ¶ 95]
On August 4, 2015, after Mr. Griswold arrived, "the EPA crew" began excavating the adit and drug out all but a small portion of the drainage pipe that DRMS installed in 2009. [Doc. 86-1, ¶ 96] New Mexico alleges this work was done "[w]ith an incomplete safety plan, an inadequate evaluation of the fluid hazard, and lacking any equipment to prevent or mitigate an uncontrolled release of water from the mine." [Doc. 86-1, ¶ 96] The next day, August 5, 2015, the "EPA crew" resumed excavating the Level 7 adit, when a backhoe operator hit a "spring." [Doc. 86-1, ¶ 98-99] New Mexico alleges that because "the pipes were visibly well below the plug, the EPA crew knew or should have known they were removing material at least several feet below the roof of the adit." [Doc. 86-1, ¶ 98] No one present attempted to plug the spring or "blowout," and the blowout resulted in the release of over three million gallons of acid mine drainage and 880,000 pounds of heavy metals from the Gold King Mine into the Animas River. [Doc. 86-1, ¶¶ 1, 99] The Animas River joins the San Juan River and travels through portions of New Mexico and the Navajo Nation. [Doc. 86-1, ¶ 1]
In sum, New Mexico alleges:
[T]he work conducted by EPA, DRMS, Environmental Restoration, Weston Solutions, and Harrison Western in connection with the Gold King Mine amounted to reckless, careless, and grossly negligent conduct that was not driven or supported by social, economic, or public policy considerations. Furthermore, their actions substantially deviated from their own work plans, the mandatory directions given by Mr. Way, established engineering standards of care, and applicable federal and state regulations.
[Doc. 86-1, ¶ 111]
The Navajo Nation's Complaint alleges similar allegations as a basis for relief. To the extent the allegations differ between the Navajo Nation and New Mexico, those differences are addressed below as pertinent to the analysis of the present motions.
II. ANALYSIS
A. Legal Standard Governing Motions To Dismiss
ER brings its Motions to Dismiss under Federal Rule of Civil Procedure 12(b)(6). Fed. Civ. P. Rule 8(a)(2) requires a complaint to set out "a short and plain statement of the claim showing that the pleader is entitled to relief." In Bell Atlantic Corporation v. Twombly , 550 U.S. 544, 127 S.Ct. 1955, 167 L.Ed.2d 929 (2007), the Supreme Court held that: "to withstand a motion to dismiss, a complaint must have enough allegations of fact, taken as true, 'to state a claim to relief that is plausible on its face.' " Kansas Penn Gaming, LLC v. Collins , 656 F.3d 1210, 1214 (10th Cir. 2011) (quoting Twombly , 550 U.S. at 570, 127 S.Ct. 1955 ). In applying this test, a court accepts as true all "plausible, non-conclusory, and non-speculative" facts alleged in the plaintiff's complaint, Shrader v. Biddinger , 633 F.3d 1235, 1242 (10th Cir. 2011) ; provided, that "the tenet that a court must accept as true all of the allegations contained in a complaint is inapplicable to legal conclusions." Ashcroft v. Iqbal , 556 U.S. 662, 678, 129 S.Ct. 1937, 173 L.Ed.2d 868 (2009). In short, in ruling on a Rule 12(b)(6) motion, "a court should disregard all conclusory statements of law and consider whether the remaining specific factual allegations, if assumed to be true, plausibly suggest the defendant is liable." Collins , 656 F.3d at 1214.
B. CERCLA Cost Recovery and Declaratory Judgment
Both New Mexico and the Navajo Nation bring claims pursuant to CERCLA against ER for cost recovery ( 42 U.S.C. § 9607(a) ) and a declaratory judgment ( 42 U.S.C. § 9613(g)(2) ). [Doc. 1, ¶¶ 96-115; 16-CV-931, Doc. 1, ¶¶ 117-141]
"Congress enacted CERCLA to facilitate the expeditious cleanup of environmental contamination caused by hazardous waste releases ... and to establish a financing mechanism to abate and control the vast problems associated with abandoned and inactive hazardous waste disposal sites." Young v. United States , 394 F.3d 858, 862 (10th Cir. 2005) (internal quotation marks and citations omitted). "Thus, the twin aims of CERCLA are to [clean up] hazardous waste sites and impose the costs of such cleanup on parties responsible for the contamination." Id.
The elements of a prima facie case of liability under § 9607(a) require a showing (1) that the defendant is a "covered person" under CERCLA; (2) that a "release" or "threatened release" of any "hazardous substance" at the site in question has occurred; (3) that the release or threatened release caused plaintiff to incur costs; (4) that plaintiff's costs are "necessary" costs of response; and (5) that plaintiff's response action or cleanup was consistent with the [National Contingency Plan].
Morrison Enters. v. McShares, Inc. , 302 F.3d 1127, 1135-36 (10th Cir. 2002).
ER disputes that it is a covered person under Section 9607(a). [Doc. 33, p. 7; Doc. 102, p. 6] Section 9607(a) imposes liability for the cleanup of facilities on four categories of persons:
(1) the owner and operator of a vessel or a facility,
(2) any person who at the time of disposal of any hazardous substance owned or operated any facility at which such hazardous substances were disposed of,
(3) any person who by contract, agreement, or otherwise arranged for disposal or treatment, or arranged with a transporter for transport for disposal or treatment, of hazardous substances owned or possessed by such person, by any other party or entity, at any facility or incineration vessel owned or operated by another party or entity and containing such hazardous substances, and
(4) any person who accepts or accepted any hazardous substances for transport to disposal or treatment facilities, incineration vessels or sites selected by such person, from which there is a release, or a threatened release which causes the incurrence of response costs, of a hazardous substance[.]
42 U.S.C. § 9607(a). Liability is imposed on such "covered persons" for:
(A) all costs of removal or remedial action incurred by the United States Government or a State or an Indian tribe not inconsistent with the national contingency plan;
(B) any other necessary costs of response incurred by any other person consistent with the national contingency plan;
(C) damages for injury to, destruction of, or loss of natural resources, including the reasonable costs of assessing such injury, destruction, or loss resulting from such a release; and
(D) the costs of any health assessment or health effects study carried out under section 9604(i) of this title.
Section 9607(a)(4). "The term 'release' means any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into the environment." 42 U.S.C. § 9601(22).
Section 9613(g)(2) provides that:
In any such action described in this subsection, the court shall enter a declaratory judgment on liability for response costs or damages that will be binding on any subsequent action or actions to recover further response costs or damages. A subsequent action or actions under section 9607 of this title for further response costs at the vessel or facility may be maintained at any time during the response action, but must be commenced no later than 3 years after the date of completion of all response action. Except as otherwise provided in this paragraph, an action may be commenced under section 9607 of this title for recovery of costs at any time after such costs have been incurred.
Both Plaintiffs allege that ER is liable under CERCLA as an operator of a facility at which hazardous substances were disposed, as an arranger for the disposal or treatment of hazardous substances, and as a transporter of hazardous substances. [Doc. 1, ¶¶ 102-104; Doc. 86-1, ¶¶ 128-130; 16-CV-931, Doc. 1, ¶¶ 123-126; Doc. 141-1, ¶¶ 153-155] ER argues that it does not fit into any of these categories of persons. [Doc. 33, p. 7; Doc. 102, p. 6]
i. CERCLA Operator Liability
CERCLA circuitously defines an "owner or operator" as "in the case of an onshore facility or an offshore facility, any person owning or operating such facility[.]" 42 U.S.C. § 9601(20)(A)(ii).
The term "facility" means (A) any building, structure, installation, equipment, pipe or pipeline (including any pipe into a sewer or publicly owned treatment works), well, pit, pond, lagoon, impoundment, ditch, landfill, storage container, motor vehicle, rolling stock, or aircraft, or (B) any site or area where a hazardous substance has been deposited, stored, disposed of, or placed, or otherwise come to be located; but does not include any consumer product in consumer use or any vessel.
Given CERCLA's unhelpful definition of an operator, courts have come up with varying tests to determine operator liability. Having reviewed several cases, the Court finds the following summary particularly clear and succinct, including its discussion of United States v. Bestfoods , 524 U.S. 51, 118 S.Ct. 1876, 141 L.Ed.2d 43 (1998), the only Supreme Court case on the issue:
In United States v. Bestfoods , 524 U.S. 51, 118 S.Ct. 1876, 141 L.Ed.2d 43 (1998), the Supreme Court stated that "under CERCLA, an operator is simply someone who directs the workings of, manages, or conducts the affairs of a facility." Id. at 66, 118 S.Ct. 1876. To be held liable for remediation costs, "an operator must manage, direct, or conduct operations specifically related to pollution, that is, operations having to do with the leakage or disposal of hazardous waste, or decisions about compliance with environmental regulations." Id. "For one to be considered an operator, then, there must be some nexus between that person's or entity's control and the hazardous waste contained in the facility." Geraghty & Miller, Inc. v. Conoco Inc. , 234 F.3d 917, 928 (5th Cir. 2000) (quoting Kaiser Aluminum & Chem. Corp. v. Catellus Dev. Corp. , 976 F.2d 1338, 1341 (9th Cir. 1992) ), abrogated on other grounds by Burlington N. & Santa Fe Ry. Co. v. United States , 556 U.S. 599, 129 S.Ct. 1870, 173 L.Ed.2d 812 (2009). "A court must decide whether a contractor is an operator after considering the totality of the circumstances concerning its involvement at the site." Id.
Exxon Mobil Corp. v. U.S. , 108 F.Supp.3d 486, 520 (S.D. Tex. 2015). Before Bestfoods , a Circuit split developed between two tests: the "actual control" test and the "authority to control test." See FMC Corp. v. Aero Indus., Inc. , 998 F.2d 842, 846 (10th Cir. 1993) (discussing the Circuit split and declining to "decide which approach is best because it is undisputed on the record that [the defendant] exercised actual control and personally participated in any conduct that violated CERCLA"); Redwing Carriers, Inc. v. Saraland Apartments , 94 F.3d 1489, 1504-05 (11th Cir. 1996) (discussing the two tests and the Circuit split). Bestfoods criticized the "actual control" test but did not address the "authority to control" test. Bestfoods , 524 U.S. at 67, 118 S.Ct. 1876. Instead, the Court relied on CERCLA's statutory language to determine the meaning of the word "operate," ultimately instructing courts to evaluate each party's involvement with or at a facility to determine whether that party operated the facility. Id. at 71-73, 118 S.Ct. 1876. The Court held that "an operator must manage, direct, or conduct operations specifically related to pollution, that is, operations having to do with the leakage or disposal of hazardous waste, or decisions about compliance with environmental regulations." Id. at 66-67, 118 S.Ct. 1876.
After Bestfoods , our Tenth Circuit decided the issue of whether a minority shareholder was liable as an operator under CERCLA, and, consistent with Bestfoods , did not apply either the "actual control" or "authority to control" test. Raytheon Constructors, Inc. v. Asarco Inc. , 368 F.3d 1214, 1217 (10th Cir. 2003). The Court focused on the "necessary connection between the potential 'operator' and the facility itself," stating that "operation is evidenced by participation in the activities of the facility." Id. (internal quotation marks and citation omitted).
Although the parties in this case spend some time briefing cases relying on both the actual control test and the authority to control test, in light of Bestfoods and Raytheon Constructors this Court is not persuaded that either test is appropriate. Instead, the Court must focus on the language of CERCLA itself and the principles set forth in Bestfoods . As set forth above, Bestfoods states: "an operator must manage, direct, or conduct operations specifically related to pollution, that is, operations having to do with the leakage or disposal of hazardous waste, or decisions about compliance with environmental regulations." Bestfoods , 524 U.S. at 66, 118 S.Ct. 1876 (emphasis added). Here, Plaintiffs allege that ER was directly involved in conducting operations at the facility. Plaintiffs allege that ER was responsible for providing drainage control, implementing a water management system, and constructing and maintaining the retention pond. [Doc. 86-1, ¶ 79, 95; Doc. 141-1, ¶ 89] EPA selected ER to "procur[e] and manag[e] the reopening and ground support construction" of the Gold King Mine portal. [Doc. 86-1, ¶¶ 80; Doc. 141, ¶ 73] New Mexico alleges that ER was involved in the decision making concerning operation of the facility, including deciding in 2014 that larger settling ponds and additional treatment were necessary. [Doc. 86-1, ¶ 83] Navajo Nation quotes a May 2015 Action/Work Plan submitted by ER which lists the following tasks for ER and its subcontractor:
• Utilize ramp created in site set up to access slope above portal[.]
• Excavate loose material from the top of the high wall.
• Drill in wire mesh anchors.
• Hang wire mesh on the high wall as excavation to the sill of the portal proceeds.
• Excavate to the sill and into the competent rock face at the portal.
• Gradually lower the debris blockage with the appropriate pumping of the impounded water to water management/treatment system.
[Doc. 141-1, ¶ 89] Further and not least, ER was one of the parties present on August 4 and 5, 2015 and excavating at the time of the spill, contrary to the directions of Mr. Way. [Doc. 86-1, ¶¶ 96-100; Doc. 141-1, ¶¶ 101-104] These facts state a claim that ER "conduct[ed] operations specifically related to [the] pollution." Bestfoods , 524 U.S. at 66, 118 S.Ct. 1876 (emphasis added). Contrary to ER's argument, these are not conclusory allegations. [Doc. 33, p. 8] Plaintiffs' allegations are sufficient to state a claim for operator liability.
ER points to other allegations in the Complaints which suggest EPA controlled the activities at the Gold King Mine. [Doc. 33, p. 8; Doc. 102, p. 8] ER argues that these allegations require dismissal based on the analysis employed in Interstate Power Co. v. Kansas City Power and Light Co. , 909 F.Supp. 1284, 1289 (N.D. Iowa 1994) (applying the authority to control test) and Ryland Group, Inc. v. Payne Firm, Inc. , 492 F.Supp.2d 790, 793-94 (S.D. Ohio 2005). [Doc. 33, p. 10] In Interstate Power , the Court held that a contractor which performed demolition services was not liable as an operator because "[i]t is undisputed that all of [the contractor's] actions were taken at the direction of other parties." Interstate Power , 909 F.Supp. at 1289. In Ryland Group , the Court held that a subcontracted company that was hired to "rototill the soil" of a contaminated area, thereby causing the contamination to spread, was not an operator. Ryland Group, Inc. , 492 F.Supp.2d at 793-94. The Court reached this decision in part because it was the contractor, not the subcontractor, which investigated the contamination of the soil, developed a plan to remediate the contamination, performed sampling, and directly supervised the subcontractor, thereby "direct[ing] and control[ing] all activities that took place in the contaminated areas of the site." Id. As this Court stated above, however, the Tenth Circuit applies neither the authority to control nor the actual control test, which are the basis for the decisions in Interstate Power and Ryland Group . Further and alternatively, even if the Court were to apply Interstate Power and Ryland Group , the Court would conclude that dismissal is not appropriate. Once the facts are developed, it may be that ER lacked any control of the facility. However, given Plaintiffs' specific allegations as to the contractual duties of ER and ER's actual operation of the facility, the Court concludes that, as pleaded, Plaintiffs may be able to prove facts establishing that ER meets the definition of an operator.
Other courts have held contractors liable as CERCLA operators. While some of these cases predate Bestfoods and apply either the actual control or authority to control test, the analysis in each of these cases is consistent with Bestfoods determination that:
[A]n operator is simply someone who directs the workings of, manages, or conducts the affairs of a facility.... [A]n operator must manage, direct, or conduct operations specifically related to pollution, that is, operations having to do with the leakage or disposal of hazardous waste, or decisions about compliance with environmental regulations.
Bestfoods , 524 U.S. at 66-67, 118 S.Ct. 1876. In Kaiser Aluminum , the Ninth Circuit relied on the rule that operator liability attaches "if the defendant had authority to control the cause of the contamination at the time the hazardous substances were released into the environment." Kaiser Aluminum & Chem. Corp. , 976 F.2d at 1341. In Kaiser Aluminum, the complaint alleged that the contractor excavated tainted soil, moved it, and "spread it over uncontaminated portions of the property." Kaiser Aluminum & Chem. Corp. , 976 F.2d at 1342. The Court held that these allegations were sufficient to state a claim of operator liability against the contractor because the "activity which produced the contamination ... occurred during ... the construction process" performed by the contractor. Id. (emphasis in original). Further, the Fifth Circuit considered the operator provision in light of the definition of "disposal" in CERCLA, and concluded that a party that "moved, dispersed, or released [hazardous materials] during landfill excavations and fillings" could be liable as an operator. Tanglewood East Homeowners v. Charles-Thomas, Inc. , 849 F.2d 1568, 1573 (5th Cir. 1988).
Finally, a number of district courts have followed the analysis set forth in Kaiser Aluminum . See KFD Enters., Inc. v. City of Eureka , 2010 WL 4703887, *2-3 (N.D. Cal. 2010) (denying contractor's motion to dismiss where the plaintiff alleged that, during the course of drilling wells, the contractor "pierced aquitard, which caused release of contaminants into previously uncontaminated ground" and stating that operator liability merely requires the party to have control over the activity that causes the pollution); City of North Miami, Fla. v. Berger , 828 F.Supp. 401, 413-14 (E.D. Va. 1993) (stating "operator liability is clearly appropriate" for ABC, a landfill operation company, which "exercised actual physical control over the wastes" even though another party directed and controlled the work, because ABC "actually performed the construction and waste disposal work"); Ganton Techs v. Quadion Corp. , 834 F.Supp. 1018, 1021-22 (N.D. Ill. 1993) (applying Kaiser to hold that "pollution clean-up contractors" are operators under CERCLA where the contractors dealt with the hazardous material and "controlled the activities in which the additional contamination took place-the clean up operations"). The Court finds the reasoning of these cases persuasive and holds that ER, as a contractor, may be liable as an operator.
In sum, as pleaded by both New Mexico and the Navajo Nation, either Plaintiff may be able to establish a set of fact demonstrating that ER is liable as an operator, and thus a conclusion that ER was not an operator is not appropriate at this juncture.
ii. CERCLA Arranger Liability
Arranger liability is "intended to deter and, if necessary, to sanction parties seeking to evade liability by 'contracting away' responsibility." United States v. Gen. Elec. Co. , 670 F.3d 377, 382 (1st Cir. 2012). Thus, liability for removal and remediation attaches to:
any person who by contract, agreement, or otherwise arranged for disposal or treatment, or arranged with a transporter for transport for disposal or treatment, of hazardous substances owned or possessed by such person, by any other party or entity, at any facility or incineration vessel owned or operated by another party or entity and containing such hazardous substances.
ER argues that it was not an arranger for three reasons. First, ER argues that the discharge was accidental, relying on Burlington Northern , 556 U.S. at 612, 129 S.Ct. 1870 and Amcast Indus. Corp. v. Detrex Corp. , 2 F.3d 746, 751 (7th Cir. 1993), and thus ER argues that it cannot be liable for the spill. [Doc. 33, p. 10; Doc. 102, p. 9] Second, ER argues that it did not arrange for disposal "by any other party or entity," as required by Section 9607(a)(3). [Doc. 33, p. 10; Doc. 102, p. 9] Finally, ER argues that Plaintiffs failed to plead factual allegations that ER controlled the treatment or disposal process. [Doc. 33, p. 11; Doc. 102, p. 10]
First, the Court considers ER's argument that, based on the holding in Burlington Northern , it cannot be liable as an arranger because the spill was accidental. In Burlington Northern , the potentially responsible party, Shell, sold a pesticide, which the Court characterized as a new, useful product. Burlington Northern , 556 U.S. at 603, 612, 129 S.Ct. 1870. Shell was aware that minor, accidental spills occurred during the transfer of the pesticide from a common carrier to the purchaser's bulk storage tanks, but the Court held that this knowledge was insufficient to make Shell liable as an arranger. Id. at 612-13, 129 S.Ct. 1870. The Court stated:
It is plain from the language of the statute that CERCLA liability would attach under § 9607(a)(3) if an entity were to enter into a transaction for the sole purpose of discarding a used and no longer useful hazardous substance. It is similarly clear that an entity could not be held liable as an arranger merely for selling a new and useful product if the purchaser of that product later, and unbeknownst to the seller, disposed of the product in a way that led to contamination.... Less clear is the liability attaching to the many permutations of "arrangements" that fall between these two extremes-cases in which the seller has some knowledge of the buyers' planned disposal or whose motives for the "sale" of a hazardous substance are less than clear.
Id. at 609-10, 129 S.Ct. 1870. The Court held that "Shell's mere knowledge that spills and leaks ... occur[ed] is insufficient grounds for concluding that Shell 'arranged for' the disposal of [the pesticide] within the meaning of § 9607(a)(3)." Id. at 613, 129 S.Ct. 1870. The Court advised that the ordinary meaning of "arrang[e] for" applies, and that "the word 'arrange' implies action directed to a specific purpose," and " 'intentional action.' " Id. at 610-11, 129 S.Ct. 1870 (internal citations omitted). Accordingly, the Court rejected the argument that, where a company sells a new, useful product, knowledge of some disposal of hazardous substances through a spill is sufficient to create liability as an arranger. Id. at 612, 129 S.Ct. 1870. The Court acknowledged that the statute defines "dispose of" as including unintentional disposals such as spills and leaks, but, nonetheless the Court was not persuaded by the argument that Shell "entered into the sale of [the pesticide] with the intention that at least a portion of the product be disposed of during the transfer process by one or more of the methods described in § 6903(3)," and therefore the Court held that Shell was not liable. Id. at 612, 129 S.Ct. 1870.
Here, the Court is not persuaded that Burlington Northern is applicable because Burlington Northern limited its holding to the context of the sale of a new, useful product. Id. at 612-13, 129 S.Ct. 1870. Burlington Northern is explicitly not applicable to "a transaction for the sole purpose of discarding a used and no longer useful hazardous substance," a circumstance in which the Court stated that liability is "plain." Id. at 610-13, 129 S.Ct. 1870. Plaintiffs' allegations in this case state a claim that the arrangement falls into this area of "plain" liability. Specifically, New Mexico alleges that the hazardous substance was "acid mine drainage and ... heavy metals" including "arsenic, lead, mercury, cadmium, copper, and zinc," i.e. , a used and no longer useful substance. [Doc. 86-1, ¶¶ 1, 125] New Mexico further alleges ER arranged for the disposal and treatment of the waste water by alleging that the 2014 "Statement of Work" provided that ER was responsible for removing the "blockage in the adit" to allow a controlled release of the mine waste water; providing channels or other conveyances for the waste water; directing the flow of the waste water to those channels and conveyances; and "construct[ing] & maint[aining] of repository, retention pond & water treatment." [Doc. 86-1, ¶¶ 79, 129] Navajo Nation likewise alleges that the disposed product was mine waste water, which contained hazardous substances. [Doc. Doc. 141-1, ¶¶ 76, 151] Navajo Nation alleges that, in "May 2015, Environmental Restoration submitted an 'Action/Work Plan,' which included sub-contracting with Harrison Western to excavate the mine.... Under the plan, Harrison Western would be 'mobilized to provide expertise in mine site related activities,' and Environmental Restoration would only 'support' Harrison Western as necessary." [Doc. 141-1, ¶ 88]
The Action/Work Plan also indicated that the work at Gold King would include "directing mine discharge [from Gold King] to the pond at the Red and Bonita work site" and "establishing a water treatment system." After portal reconstruction was complete, ER and other contractors would "[r]eturn [the] flow" of acid mine drainage to its "original path."
[Doc. 141-1, ¶ 89] In sum, Plaintiffs' allegations allow a reasonable inference that the sole purpose of the agreement between the EPA and ER was for ER to participate in the disposal and treatment of a no-longer-useful, hazardous substance. This is the circumstance in which Burlington Northern concluded that CERCLA liability as an arranger was "plain." Burlington Northern , 556 U.S. at 609-10, 129 S.Ct. 1870.
Further, ER's reliance on Amcast Industrial for the proposition that arranger liability "excludes accidental spillage" is not persuasive because ER ignores the bulk of the analysis in Amcast Industrial . Amcast Indus. Corp. , 2 F.3d at 751. [Doc. 33, p. 10; Doc. 102, p. 9] The full sentence ER cites states: "In the context of the operator of a hazardous-waste dump, 'disposal' includes accidental spillage; in the context of the shipper who is arranging for the transportation of a product , 'disposal' excludes accidental spillage." Id. (Emphasis added). Moreover, the Court went on to state:
The words "arranged with a transporter for transport for disposal or treatment" appear to contemplate a case in which a person or institution that wants to get rid of its hazardous wastes hires a transportation company to carry them to a disposal site. If the wastes spill en route, then since spillage is disposal and the shipper had arranged for disposal-though not in that form-the shipper is a responsible person and is therefore liable for clean-up costs. But when the shipper is not trying to arrange for the disposal of hazardous wastes, but is arranging for the delivery of a useful product, he is not a responsible person within the meaning of the statute and if a mishap occurs en route his liability is governed by other legal doctrines.
Id. As detailed above, here, Plaintiffs allege that ER arranged for the disposal of a hazardous substance, not a new, useful product. Thus, the exception for liability for spills carved out by Burlington Northern and Amcast Industrial does not apply in this case.
The Court is further not persuaded by ER's second argument that Plaintiffs failed to allege that ER arranged for the disposal of the hazardous substance by "any other party or entity." [Doc. 33, pp. 10-11; Doc. 102, pp. 9-10] ER states Tenth Circuit law correctly, i.e. , that the disposal or treatment must be performed by a party or entity other than ER. [Doc. 33, p. 11] Chevron Mining Inc. v. United States , 863 F.3d 1261, 1282-83 (10th Cir. 2017) (stating that "the clause 'by any other party or entity' does not apply to ownership of the hazardous substances but, as most courts have held, refers back to the previous clause, 'for disposal or treatment' (i.e. , the phrase thus most naturally reads as the arrangement 'for disposal or treatment ... by any other party or entity, at any facility or incineration vessel')"). The Court rejects Plaintiffs' argument to the contrary. [Doc. 58, p. 8; Doc. 115, pp. 10-11]
ER argues that Plaintiffs failed to allege that another party participated in or conducted the disposal or treatment. The Court does not agree. The treatment or disposal of the hazardous materials within the mine waste water was to occur at a settling pond. [Doc. 8601, ¶¶ 79, 129; Doc. 141-1 ¶ 91] Navajo Nation quotes from the Action/Work Plan, which identified tasks jointly for ER and ER's " 'underground subcontractor (Harrison Western, HW).' " [Doc. 141-1, ¶ 89] One such task was the " 'pumping of the impounded water to water management/treatment system (at Red and Bonita and described in TO62 Work Plan), to prevent the uncontrolled release of mine water.' " [Doc. 141-1, ¶ 89] Thus, ER contracted with Harrison Western to assist with the disposal of the hazardous waste, and therefore ER "arrang[ed] 'for disposal or treatment ... by any other party or entity [Harrison Western].' " Chevron Mining Inc. , 863 F.3d at 1282 (internal quotation marks omitted). Similarly, New Mexico alleges that ER "submitted a draft work plan for the Gold King Mine operation, which included sub-contracting with Harrison Western to complete the project." [Doc. 86-1, ¶ 90] New Mexico also alleges that in June and July of 2015, "EPA, Environmental Restoration, Weston Solutions, and Harrison Western ... discussed a plan to install a sump basin to treat water that would be pumped out of the mine during the adit excavation work." [Doc. 86-1, ¶ 91] Thus, New Mexico also alleges that ER arranged for at least one other party to aid in the disposal of the hazardous waste. While there could certainly be more detail to these allegations, at this early stage, Plaintiffs' allegations are sufficient to plead that ER arranged with at least one other party for that other party to participate in the disposal of the hazardous waste. See Twombly , 550 U.S. at 555, 127 S.Ct. 1955 (to state a claim, factual allegations, taken as true, need not be detailed but "must be enough to raise a right to relief above the speculative level").
Third and finally, ER argues that both New Mexico and Navajo Nation failed to plead "sufficient factual allegations that ER controlled the alleged treatment or disposal process," citing Interstate Power Co. , 909 F.Supp. at 1288 [Doc. 33, p. 11] ; see also [Doc. 102, pp. 9-10] and United States v. Shell Oil Co. , 294 F.3d 1045, 1055 (9th Cir. 2002) [Doc. 102, p. 10]. ER argues that the New Mexico alleges that ER was "directly supervised" and "controlled and directed by" the EPA and the Colorado DRMS, and, thus, as a matter of law, ER cannot be liable as an arranger. [Doc. 33, p. 11] ER argues that Navajo Nation "alleges that the Substitute OSC was 'in charge' at Gold King at all relevant times," and, thus, that the Substitute OSC controlled the work and Plaintiffs failed to allege control by ER. [Doc. 102, p. 10]
The Court is not persuaded that Plaintiffs must plead that ER controlled the alleged treatment or disposal process. The elements of arranger liability as set forth by the Court in Interstate Power Co . and Shell Oil Co. are not consistent with the elements set forth by our Tenth Circuit. In Interstate Power Co. , the Court stated that the elements of arranger liability are: "(1) a 'disposal' of a hazardous substance; (2) an 'arrangement' contemplating disposal; and (3) a sufficient 'nexus' between the party and the hazardous substance." Interstate Power Co. , 909 F.Supp. at 1287. In Shell Oil Co. , the Court held that "control is a crucial element of the determination of whether a party is an arranger under § 9607(a)(3)." Shell Oil Co. , 294 F.3d at 1055. By comparison, in Chevron Mining, Inc. , the Court held that the elements of arranger liability are: "(1) the party must be a 'person' as defined in CERCLA; (2) the party must 'own' or 'possess' the hazardous substance prior to the disposal; and (3) the party must, 'by contract, agreement or otherwise,' arrange for the transport or disposal of such hazardous substances." Chevron Mining, Inc. , 863 F.3d at 1279. Thus, neither control nor the "authority to control" the hazardous substance are elements of arranger liability as set forth in this Circuit. Chevron Mining, Inc. , 863 F.3d at 1283. Accordingly, the Court will not grant ER's Motions to Dismiss based on this argument.
For the above reasons, the Court concludes that both Plaintiffs have sufficiently alleged that ER is liable as an arranger pursuant to Section 9607(a)(3), and the Court will not grant dismissal of their claims that ER is an arranger.
iii. CERCLA Transporter Liability
Section 9607(a)(4) holds liable as a transporter "any person who accepts or accepted any hazardous substances for transport to disposal or treatment facilities, incineration vessels or sites selected by such person, from which there is a release, or a threatened release which causes the incurrence of response costs, of a hazardous substance." "The terms 'transport' or 'transportation' means (sic ) the movement of a hazardous substance by any mode, including a hazardous liquid pipeline facility." 42 U.S.C. § 9601(26). In United States v. Hardage , 985 F.2d 1427, 1435 (10th Cir. 1993), our Tenth Circuit held that, to be a transporter, the party must have selected the site of disposal or treatment. Other courts have reached the same conclusion. See, e.g., B.F. Goodrich v. Betkoski, 99 F.3d 505, 520-21 (2d Cir. 1996) (collecting cases), abrogated on other grounds by United States v. Bestfoods , 524 U.S. 51, 118 S.Ct. 1876, 141 L.Ed.2d 43 (1998) ; Tippins Inc. v. USX Corp. , 37 F.3d 87, 93-94 (3d Cir. 1994) ; United States v. W. Processing Co., 756 F.Supp. 1416, 1419-20 (W.D. Wash. 1991). In so concluding, the Court in Western Processing first reviewed CERCLA's legislative history and EPA's commentary, and, based on this review, explained the rationale for the site selection provision in Section 9607(a)(4) :
[T]ransporters have a limited role in the activity surrounding hazardous substances.
They neither create nor treat the material, but are responsible for its safe carriage between the point where it is generated and where it is left for disposal or treatment. If the transporter does not select the delivery site, the transporter's connection with the material is the most attenuated among potentially responsible parties. If the transporter does select the delivery site, the transporter's role becomes a less passive one. As one who actively selected a disposal site, the transporter may more equitably be subject to liability.
Our Tenth Circuit has not yet "define[d] the outer limits of transporter liability" or determined whether, as some other courts have considered, transporter "liability may be imposed if the transporter at least actively participates in or assists in the site selection." See United States v. Hardage , 750 F.Supp. 1444, 1458-59 (W.D. Okla. 1990) ; see Tippins, Inc. , 37 F.3d at 94-95 (holding that "a person is liable as a transporter not only if it ultimately selects the disposal facility, but also when it actively participates in the disposal decision to the extent of having had substantial input into which facility was ultimately chosen").
ER argues that it is not liable as a transporter because Plaintiffs' allegations are conclusory and because " 'transporter liability is predicated on site selection by the transporter,' " quoting Hardage . [Doc. 33, p. 12; Doc. 102, p. 11] ER argues that the selection of the Gold King Mine as a reclamation site occurred prior to ER's contract and that Plaintiffs fail to make "any allegation that ER was involved in siting or selecting the ponds or treatment facilities." [Doc. 33, p. 12; accord Doc. 102, p. 11]
Neither New Mexico nor Navajo Nation dispute ER's reading of Hardage as requiring the transporter to have selected the site for disposal. [Doc. 58, pp. 11-12; Doc. 115, p. 11] Instead, New Mexico argues that its allegations are sufficient to plead transporter liability. Specifically, New Mexico refers to the following allegations (in the original complaint): 1) that "ER 'accepted hazardous substances from the mines for transport and disposal, including to settling ponds and other facilities, and releases from those facilities occurred.' (Compl. § 103);" 2) "ER 'dug a channel on the right side of the berm and positioned planks so that water flowing from the adit could be directed to the drainage channel that DRMS had previously installed.' (Compl. ¶ 86);" and 3) that "ER participated in operations involving the treatment and disposal process, which included transporting mine water from Gold King to settling ponds and other facilities. (Compl. ¶ 81)." [Doc. 58, pp. 11-12] Navajo Nation, on the other hand, argues that: "ER 'knew that, in the event of a blowout, highly contaminated water ... at the Gold King Mine would make its way from Cement Creek down to the Animas and San Juan Rivers, crossing through the Navajo Reservation.' " [Doc. 115, p. 11 (quoting its original Complaint) ] These allegations do not identify the party or parties who selected the treatment site-the settlement pond-or who participated in the site selection.
However, Plaintiffs' Proposed Amended Complaints (submitted after briefing was completed on the Motion to Dismiss ) contain additional allegations concerning whether ER selected the site of disposal or treatment of the waste water. Navajo Nation's Proposed Amended Com plaint discusses the 2014 Task Order which "sought a work plan from Environmental Restoration," and which:
required the construction of a "temporary water retention and sludge management pond" that would be used to "manage impounded mine water and base flows and metal precipitate sludge from the mine workings." It required Environmental Restoration to "[p]rovide for appropriate removal of contamination ... in consultation with the OSC" and "appropriate disposal and transportation of all contaminated debris...."
[Doc. 141-1, ¶¶ 67, 71] Navajo Nation also alleges that, after the failed attempt in 2014 to begin the excavation, EPA drafted a report acknowledging the need for larger settlement ponds and the preparation of additional water management and treatment mechanisms. [Doc. 141-1, ¶ 85] Thereafter, Harrison Western, a sub-contractor selected by ER, prepared a revised excavation plan, and, using this plan, ER submitted a new "Action/Work Plan," which was approved by the EPA. [Doc. 141-1, ¶ 88] The Navajo Nation alleges:
The Action/Work Plan also indicated that the work at Gold King would include "directing mine discharge [from Gold King] to the pond at the Red and Bonita work site" and "establishing a water treatment system." After portal reconstruction was complete, ER and other contractors would "[r]eturn [the] flow" of acid mine drainage to its "original path" and then construct a flume and measuring station, as directed by USEPA personnel.
[Doc. 141-1, ¶ 89]
Among its new allegations, New Mexico pleads: "EPA OSC Steve Way, Colorado DRMS officials, and employees of Environmental Restoration, Weston Solutions, and Harrison Western inspected the Level 7 adit and determined that the drainage would require larger settling ponds and additional treatment." [Doc. 86-1, ¶ 83] Subsequently, in May of 2015, ER submitted a new draft work plan. [Doc. 86-1, ¶ 90] Then, in June or July of 2015, "EPA, Environmental Restoration, Weston Solutions and Harrison Western visited the Gold King Mine several times to assess site conditions and drainage flows [and] ... discussed a plan to install a sump basin to treat water that would be pumped out of the mine during the adit excavation work." [Doc. 86-1, ¶ 91] Then the "EPA and its contractors ... started constructing a water management and treatment system." [Doc. 86-1, ¶ 92]
Given that the Court must construe the allegations in the light most favorable to Plaintiffs, the Court concludes that, in their Proposed Amended Complaints , both New Mexico and the Navajo Nation have met Twombly 's notice pleading requirement to allege more than "a formulaic recitation of the elements" with regard to ER's selection of the site, or participation in the selection of the site, for the treatment of the waste water. It is a reasonable inference that, by ER's participation in the meetings concerning the need for additional treatment and by ER's role in preparing reports and draft work plans, ER participated in the selection of the site of either the temporary water treatment site or the Red and Bonita treatment basin.
For the foregoing reasons, the Court denies ER's motions to dismiss the claims of New Mexico and the Navajo Nation for CERCLA liability based on ER's alleged transporter status.
C. Injunctive Relief
On July 28, 2017, this Court asked for additional briefing and evidence regarding "the scope of the EPA's removal action" in order for the Court to be able to determine whether the EPA's response action precludes some of Plaintiffs' claims or some of the relief requested by Plaintiffs. [Doc. 164, p. 3] Based on the Court's order, the parties voluntarily exchanged some discovery. [Doc. 177] However, recently a discovery dispute arose between the parties [Doc. 187], and thus, at this time, briefing on the jurisdictional issue remains incomplete.
Accordingly, the Court does not address at this time the following arguments by ER which are related to the jurisdictional issue: New Mexico's request for injunctive relief under RCRA is barred because the EPA has commenced a removal action under CERCLA § 104 [Doc. 33, pp. 12-14]; Navajo Nation's request for injunctive relief to "abate the nuisance and cure the trespass within the Nation" are barred because "the EPA has begun removal efforts at Gold King" [Doc. 102, pp. 11-13]; and New Mexico's "claim[ ] for an order requiring ER to 'abate the nuisance and cure the trespass' would interfere with the EPA's ongoing removal action and, therefore, is barred under CERCLA." [Doc. 33, p. 14]
D. Preemption of State Tort Claims
CERCLA contains two saving clauses. The first states: "Nothing in this chapter shall be construed or interpreted as preempting any State from imposing any additional liability or requirements with respect to the release of hazardous substances within such State." 42 U.S.C. § 9614(a). The second states:
Nothing in this chapter shall affect or modify in any way the obligations or liabilities of any person under other Federal or State law, including common law, with respect to releases of hazardous substances or other pollutants or contaminants. The provisions of this chapter shall not be considered, interpreted, or construed in any way as reflecting a determination, in part or whole, of policy regarding the inapplicability of strict liability, or strict liability doctrines, to activities relating to hazardous substances, pollutants, or contaminants or other such activities.
42 U.S.C.A. § 9652(d).
In New Mexico v. General Electric Company , 467 F.3d 1223, 1247 (10th Cir. 2006), our Tenth Circuit held that:
CERCLA's comprehensive NRD [natural resource damage] scheme preempts any state remedy designed to achieve something other than the restoration, replacement, or acquisition of the equivalent of a contaminated natural resource. We reach this conclusion notwithstanding CERCLA's saving clauses because we do not believe Congress intended to undermine CERCLA's carefully crafted NRD scheme through these saving clauses.
Id. The Court went on:
This is not to say the State's public nuisance and negligence theories of recovery are completely preempted in view of the ongoing remediation.... We need not go that far. Rather the remedy the State seeks to obtain through such causes of action-an unrestricted award of money damages-cannot withstand CERCLA's comprehensive NRD scheme. See Bedford Affiliates v. Sills , 156 F.3d 416, 426-27 (2d Cir. 1998) (holding CERCLA's contribution scheme preempted state law remedies of restitution and indemnification);
In re Reading Co. , 115 F.3d 1111, 1117-21 (3d Cir. 1997) (same). An interpretation of the saving clauses that preserved the State's NRD claim for money damages in its original form would seriously disrupt CERCLA's principle aim of cleaning up hazardous waste.
Id. at 1247-48 (footnote omitted).
Based on General Electric Co. , ER argues that Plaintiffs' state law claims for relief should be dismissed or the damages claims should be stricken. With regard to the Navajo Nation's state law tort causes of action:
Contrary to the Tenth Circuit's express holding in New Mexico [v. General Electric Co. ]... Plaintiff seeks compensation for a host of damages that it is not entitled to in the Tenth Circuit, such as stigma damages and loss of tax and business revenue. (Compl. ¶ 97) Thus, Plaintiff's state law Claims for Relief should be dismissed or, in the alternative, Plaintiff's claims for unrestricted monetary damages should be stricken.
[Doc. 102, pp. 13-14] Likewise, ER argues, with regard to New Mexico's state law tort causes of action:
Plaintiff is not entitled to an unrestricted award of money for natural resource damages under state law, [ General Electric Co. , 467 F.3d at 1257 ], and its state law Claims for Relief should be dismissed or, in the alternative, Plaintiff's claims for unrestricted "compensatory, consequential, and punitive damages" should be stricken.
[Doc. 33, p. 14] Pursuant to its tort claims, New Mexico seeks against ER (and other Defendants) compensatory, restitutionary, and punitive damages, as well as attorneys' fees. [Doc. 86-1, ¶¶ 9, 199, 209, 210] In addition, specifically regarding its public nuisance claim, New Mexico alleges: "New Mexico has suffered special injuries, which the public as a whole does not share. New Mexico has and will continue to suffer lost economic activity, tax revenues, and stigmatic damages arising from these releases." [Doc. 86-1, ¶ 179] Navajo Nation seeks to recover compensatory, consequential, and punitive damages, as well as attorneys' fees, costs, and expenses. [Doc. 141-1, pp. 58-59] Navajo Nation further refers to lost business revenues and stigma damages (pursuant to its public nuisance claim) [Doc. 141-1, ¶ 201], and damages based on the interference with Navajo Nation's use of the land for "water supply, irrigation needs, [and] recreational uses" (pursuant to its private nuisance claim) [Doc. 141-1, ¶ 207].
The Court in General Electric Co. refused to conclude that the State of New Mexico's "public nuisance and negligence theories of recovery are completely preempted." Id. at 1247-48. Based on this holding, the Court concludes that dismissal of Plaintiffs' state law tort claims is not appropriate, as there is no authority for concluding that