MEMORANDUM OPINION
DEBORAH K. CHASANOW, District Judge.
After more than six years of litigation, in a case generating over 700 docket entries, this contract dispute involving the proposed sale of 1,250 acres of land in Prince George’s County, Maryland, has narrowed to two basic issues: whether there are materials present on the property of a type, from a source, and to a degree sufficient to breach the environmental representations and warranties of the parties’ contract, and whether the seller’s conduct in responding to a formal request for entry constituted a material breach. In order to resolve those issues, a bench trial was held from March 31 to April 15, 2014. Upon consideration of the evidence adduced at trial, and the parties’ arguments with respect thereto, the court now issues findings of fact and conclusions of law pursuant to Federal Rule of Civil Procedure 52(a).
I. Background
On November 15, 2005, Plaintifi/Coun-ter-Defendant U.S. Home Corporation (“U.S. Home”), a subsidiary of Counter-Defendant Lennar Corporation (“Lennar”; together with U.S. Home, “Purchaser”), entered into an agreement to purchase the sole membership interest in Defen-danVCounter-Plaintiff Washington Park Estates, LLC (“WPE”), held by Defen-' dant/Counter-Plaintiff Settlers Crossing, LLC (“Settlers Crossing”). The agreement (“Purchase Agreement”) contemplated that, at the time of settlement, WPE would hold title to approximately 1,250 acres of undeveloped real estate in Prince George’s County, Maryland, known as the Bevard property (“the Property”). Thus, by acquiring Settlers Crossing’s membership interest in WPE, U.S. Home would acquire the Property, upon which it planned to build a large residential community. Concomitantly with the Purchase Agreement, U.S. Home entered into a contract with DefendanVCounter-Plaintiff Bevard Development Company (“BDC”), pursuant to which BDC was to complete certain development work on the Property (“Contract for Services”). The combined price of the Purchase Agreement and Contract for Services was $200 million, and U.S. Home paid deposits totaling $20 million. Defendant Steven Sandler (“Mr. Sandler”) — who controlled Settlers Crossing, WPE, and BDC (collectively, “Seller”) — personally guaranteed Seller’s obligations under the contracts, promising repayment of the deposits in the event of a breach. (ECF No. 649, stipulations).
For several months prior to entering into the agreements, Purchaser was given free access to the Property in order to conduct feasibility testing. As reflected in the Purchase Agreement, Seller provided U.S. Home with “all site plans, lease agreements, title reports, surveys, environmental reports, soil studies, arch[a]eological studies, geotechnical reports and other tests, studies and documents prepared by third parties pertaining to the Property ... in [its] possession[.]” (JTX 41 ¶ 9). Those reports included a 2001 Phase I Environmental Site Assessment (“ESA”) conducted by Schnabel Engineering North, LLC (“Schnabel”), Schnabel’s September 2004 update to the Phase I ESA, a Phase I Archaeological Survey conducted by URS Corporation, Inc. (“URS”), and reports of geotechnical and subsurface investigations prepared by Hardin-Kight Associates, Inc. (“Hardin-Kight”). (ECF No. 649 ¶ 11).
The stated purpose of Schnabel’s 2001 Phase I ESA was “to obtain information that would allow the development of an opinion regarding the potential for ‘recognized environmental conditions’ being present on or near the site that could present major development difficulties, liability exposure, or the need for Phase II sampling and testing.” (JTX 25, at SCH0000061). Schnabel defined the term “recognized environmental conditions,” in accordance with guidelines set by the American Society for Testing and Materials (“ASTM”), as
the presence or likely presence of any hazardous substances or petroleum products on a property under conditions that indicate an existing release, a past release, or a material threat of a release of any hazardous substances or petroleum product into structures on the property or into the ground, ground water, or surface water of the property.
(Id.). The report noted that “the site and adjacent properties ha[d] been used agriculturally and mined for sand and gravel since 1957” and that “Area 1 was heavily mined and replenished with fill material that has the potential to contain heavy metals, sludge, and varying debris.” (Id. at SCH00000599). Schnabel opined that the “[potential fill material throughout Area 1” constituted a “ ‘recognized environmental condition[]’ under the ASTM guidelines” (id. at SCH00000616), and advised that the “extent and character of the fill material w[ould] be identified upon completion of the geotechnical portion of th[e] investigation” (id. at SCH00000599).
Schnabel updated its Phase I ESA in 2004 “to document changes to the site and surrounding area that may have occurred since the previous report was issued.” (JTX 29, at ECC 00001129). In initially summarizing its prior work, Schnabel noted the results of its geotechnical investigation:
According to the original ESA[,] date[d] May 25, 2001, Area 1 was heavily mined for sand and gravel approximately 10 years before the original report. The area was suspected to contain large amounts of fill[,] possibly containing debris, sludge, and heavy metals. Subsequently, a geotechnical study was performed by Schnabel in May and June of 2001 to assess subsurface conditions of Area 1. Twenty-two soil borings were advanced to a maximum depth of twenty-five feet. FiU/possible fill ranges in depth from approximately 2.0 to 18.0 feet below the surface elevation. However, no debris, sludge, or heavy metals were noted.
(JTX 29, at ECC 00001138). Schnabel found “[n]o significant changes to the subject properties ... since the previous assessment” (id. at ECC 00001129); identified no “recognized environmental conditions” on the Property (id. at ECC 00001150); and recommended “no additional environmental investigations” (id. at ECC 00001129). It cautioned, however, that “[a]ll conclusions are qualified by the fact that no soil or ground water sampling or chemical testing was conducted under this contract.” (Id. at ECC 00001135).
URS provided a report of its Phase I Archaeological Survey in June 2005, the stated purpose of which was “to evaluate the presence or absence of archaeological resources” on the Property. (JTX 35, at USH-00029069). URS noted that the Property was “known to have extensive prehistoric and historic occupations,” but that “most of the area is also known to have been mined by the Silver Hill Sand & Gravel Company in the late twentieth century.” (Id.). It generally attributed the lack of artifacts found on the Property to “disturbed fill layers” and other “soil characteristics [that] reflected the mining process[.]” (Id.). This conclusion was supported by information it learned regarding the prior mining operation:
The largest pieces of the three property assemblages are comprised of land purchased from descendants of the Bevard family, who operated Bevard Farms and the Silver Hill Sand & Gravel Company....
Despite the name Bevard Farms, much of the project area is known to have been mined for sand and gravel under the auspices of the Silver Hill Sand & Gravel Company. The following promotional material for the Mud Cat Dredge describes what took place at the project area during the cleaning of the gravel, and accounts for the ground conditions observed there during the recent survey:
... At Silver Hill, the gravel is scrubbed to remove a 10% clay content. After the gravel is washed, the slurry containing suspended clay and mud runs into a slurry pond where fines settle out. In the process of running 2,500 tpd, as much as 500 cu. yds. of the clay-mud mixture [is] generated and added daily to the slurry pond.
Originally, the Silver Hill crew cleaned the pond with traditional dragline and clamshell techniques. Then the company installed a Mud Cat™ portable hydraulic dredge. According to [Sonny] Bevard, the Mud Cat™ sucks and pumps the clay-mud mixture a distance of 3,800 ft. through an 8-in. discharge pipe. “We decided to reclaim and raise the level of the land,” said Bevard, “and the only way to get the clay substance to dry out enough for the land to be stable is to spread [it] out in very thin layers. We plow furrows, much like forming ridges for a row of seeds, and direct the Mud Cat’s™ pipe discharge over the furrows, pouring the substance in thin layers over the land.”
Once the clay dries, the land is plowed again to further aerate it before another layer is added to the surface. After it is completely reclaimed, the land will be sold for building development.
(Id. at USH-00029077). The URS report further observed that a wastewater treatment plant operated on the Property and that sludge from that plant had been applied to a small portion:
Running through the project area is the Piscataway Wastewater Treatment Plant (PWWT) system, which includes 20 buildings spread over 300 acres, 15 of which were for water treatment purposes. In 1980-81 the Environmental Protection Agency [ (“EPA”) ] land-farmed an 8 acre plot with sludges, in the northwest corner of the Bevard Property. The process is described as follows:
From December 1980 until April 1981, pickling liquors from [] Bethlehem Steel’s Sparrows Point Plant were transported to the WWTP [i.e., waste-water treatment plant]. The WWTP was conducting experimental tests on the spent pickling liquor to determine the feasibility of using it to remove phosphates from treated sewage. WWTP records indicate [that it] processed 38,000 gallons of pickle liquors during the experimental period. The sludges generated by the WWTP during the influx of the pickling liquors were transported to the Bevard farm where they were landfarmed along Tinkers Creek.
The EPA conducted a preliminary assessment of soils from the location in 1985. No significant contaminants were detected, and no further remedial action was recommended by the EPA. Nevertheless, the location is on the state’s Master List of potential hazardous waste sites.
(Id. at USH-00029077, 78).
Hardin-Kight’s geotechnical and subsurface studies “consisted of a field investigation, laboratory testing, review of geological literature, [] review of a previous investigation of the site[, and] ... the performance of ... standard penetration soil borings that were drilled to depths ranging from 15 to 40 feet.” (JTX 32, at HK00001666). It “identified and logged the soil characteristics during drilling and ... soil samples were selected and tested in the laboratory for natural moisture content, grain size distribution and plasticity characteristics.” (Id.). Hardin-Kight noted that “[f]ill or possible fill” was “encountered in several of the borings,” but that the fill material “appear[ed] to be clean, free of construction debris or deleterious materials[, and] ... indigenous to the site.” (M at HK 00001670). It advised that “[fjurther investigation of the fill/possible fill areas should be conducted when the proposed final site layout is established if development is proposed in the identified fill areas,” including “conducting sufficient test pits and borings to confirm that the fill is as consistent as indicated by the preliminary investigations.” {Id.). Nevertheless, it concluded that “[t]he site is suitable for the proposed development.” {Id. at HK 00001663).
After entering into the Purchase Agreement, U.S. Home independently commissioned a number of additional studies. Hardin-Kight was retained to conduct further investigations of soil stability. It drilled “several hundred” soil borings on the Property, encountering areas of “uncontrolled fill” material in the process. (T. 4/4/14, at 73). American Infrastructure was hired “to put some ... costs together for dealing with ... the uncontrolled fill” and directed the excavation of “[t]est pits” at certain locations. {Id. at 85-86). Dewberry & Davis, LLC, was contracted to complete certain grading and engineering work on the Property. (DTX 585, 586). Additionally, Purchaser retained Environmental Consultants and Contractors, Inc. (“ECC”), to conduct an independent Phase I ESA. When asked at his deposition why Purchaser commissioned another Phase I ESA, U.S. Home Division President Robert Jacoby explained:
[T]he general policy of Lennar has always been to have a third-party contracted [] by us to do environmental studies on a property and there was a provision for waiving that and taking a reliance letter from someone who had worked for the precurrent owner or the previous owner, and with an investment of this size we thought doing both was probably the prudent thing to do and so we took a reliance letter from [Schnabel] and we had ECC do one for us.
(DTX 614, Jacoby depo., at 142-43).
ECC’s Phase I ESA report, issued May 8, 2006, identified three “recognized environmental conditions” on the Property:
• Five underground storage tanks (USTs) are located on the western portion of Bevard West. Soil quality in the vicinity of these tanks is not known.
• A farm dump covering approximately 1,200 square feet is located on the southeastern portion of Bevard East. It is not known if debris in the farm dump has impacted native soil quality.
• Sand and gravel mining operations were conducted on the Subject Property until approximately fifteen years ago. Reportedly, excavated soil was combined with soil from off-site sources and used as backfill.
(JTX 52 § 1.0). To address these issues, ECC recommended that Purchaser take a number of actions:
ECC recommends the performance of a Limited Subsurface Investigation of the Subject Property to assess soil and groundwater quality and address the recognized environmental conditions identified in this report. This investigation would include excavation of test pits or installation of soil borings in the vicinity of the former mines and in the vicinity of the farm dump. The investigation would evaluate the nature of fill material in the mined areas, characterize debris in the farm dump, and assess native soil quality in both areas. The investigation would also include installation of Geoprobe borings in the vicinity of the USTs. In lieu of Geoprobe installation, the USTs could be removed in accordance with Federal and State regulations. If evidence of a release is detected during installation of Geoprobes or following the removal of tanks, the Maryland Department of the Environment (MDE) should be notified. Following notification, the MDE may require additional site investigation.
(Id. (internal emphasis removed)). The ECC report expressly “d[id] not address naturally occurring hazardous substances such as elevated heavy metal concentrations in plants and soil” and indicated that “[n]o soil or groundwater sampling was performed[J” (Id. at § 2.0).
Purchaser later retained ECC to “abandon potable wells and septic systems, remove underground storage tanks and' aboveground storage tanks, and ... [conduct] asbestos abatement” on the Property. (T. 4/4/14, at 28). At least initially, however, it did not take further steps to assess the soil and groundwater quality; indeed, it believed such measures were not necessary. (DTX 614, Jacoby depo., at 113).
In or around late 2006, Purchaser sought to renegotiate the Bevard contracts related to a decline in the residential housing market. According to Mr. Jacoby:
[T]he market for both homes and land had deteriorated significantly since the date of the original agreement.
The crisis hit the State of Virginia before it hit the State of Maryland, but by 2007, ... it was well on its way to impacting both home prices and land prices in not just Prince George’s County, but all over the State of Maryland.
(Id. at 49-50). At around the same time, Seller was experiencing financial difficulties of its own and sought to.take out a loan from Defendant/Counter-Plaintiff iS-tar Financial, Inc. (“iStar”), related to the Property. (ECF No. 649 ¶ 18; DTX 595, at USH-00005745; T. 4/10/14, at 70-79).
After extensive negotiations, Seller and Purchaser entered into a Second Amendment to the Purchase Agreement on May 16, 2007 (“Second Amendment”). Among other things, the Second Amendment significantly reduced the purchase price of Settlers Crossing’s membership interest in WPE in exchange for a guaranty of specific performance by Lennar — ie., a “provision that [ ] require[d] Lennar ... to actually close on the purchase of the [Property, assuming [Seller] had satisfied [its] obligations under the contract.” (T. 3/31/14, at 109). U.S. Home expressly “agreefd] and confirm[ed]” that it “ha[d] no actual knowledge” that any of Seller’s initial representations and warranties were not true (JTX 56 ¶ 15), and Seller permitted it to begin pre-closing development work on the Property — ie., “clearing, grading and other activities desired by Purchaser in connection with its proposed development” (id. at ¶ 13). The Second Agreement also permitted Settlers Crossing to obtain financing in an amount not to exceed $100 million, provided that “any and all deeds of trust, mortgages, assignments, financing statements or other financing documents ... that encumber the Property shall be satisfied and released at [settlement at Settlers Crossing’s sole expense.” (Id. at ¶ 34). Settlement under the Second Amendment was scheduled to occur on December 5, 2007, but if “any condition precedent ... [was] not satisfied or waived in writing by Purchaser at least ten (10) days prior to the [settlement [d]ate[,] ... then the [settlement [d]ate [was to] be automatically extended to that date which is thirty (30) days after all conditions precedent to [settlement .,. have been satisfied” {id. at ¶ 21).
On June 19, 2007, consistent with the terms of the Second Amendment, iStar provided Seller with a $100 million first mortgage bridge loan with repayment contemplated from the Bevard settlement proceeds. (ECF No. 649 ¶ 20). As security, iStar accepted collateral assignments of Seller’s interests under the Purchase Agreement and Contract for Services. {Id. at ¶ 21). On the same date, Seller and Purchaser entered into a third (and final) amendment to the Purchase Agreement, which provided, in the event of foreclosure by iStar, that the Purchase Agreement would convert from a sale of Settlers Crossing’s membership interest in WPE to a sale of the Bevard Property itself. {Id. at ¶22). Also on June 19, iStar entered into a Consent and Estoppel Agreement with Purchaser (“Consent and Estoppel Agreement”), by which Purchaser acknowledged Seller’s assignment of rights and made certain representations regarding the Property and the status of conditions precedent to settlement. As relevant here, Purchaser warranted that,
[a]s of the date hereof, to the best of [its] knowledge, having made due inquiry, (i) [Purchaser] has no existing defenses, offsets, claims or credits with respect to the performance of its obligations under the [Purchase Agreement or Contract for Services], (ii) neither [Purchaser], nor any other party, [is] in default or breach of any of [its] respective obligations under the [agreements], (iii) there exists no condition or circumstance which, with the giving of notice or the passage of time, or both, would result in a default by [any party] under the [agreements, and] (iv) there exists no condition or circumstance known to [Purchaser] as of the date hereof which, with the giving of notice or the passage of time, or both, would result in a termination right[.]
(DTX 259 § 3).
At around the same time that Purchaser entered into these agreements, it was actively seeking a joint venture partner or land bank to reduce the total asset value of the Bevard transaction on its corporate ledger by the end of its fiscal year. (DTX 591, at USEL00326906). In summarizing a proposed transaction with one joint venture partner, Lennar represented, inter alia, that “[independent environmental assessments have not identified any hazardous conditions [on the Property] requiring extraordinary measures or higher level studies.” (T. 3/31/14, at 165; DTX 243). When initial efforts to find a partner were unsuccessful, Lennar began to investigate strategies to delay the scheduled settlement date, if not to avoid closing altogether. At the project level, however, Purchaser was engaged in substantial pre-closing development work on the Property, spending approximately $6 million in an effort to “get all of the approvals necessary to develop the [Property and get all of the engineering positions so that 30 days from that .point in time [it] could actually have a grading permit in [its] hand.” (DTX 614, Jacoby depo., at 59, 142).
At a meeting with regional managers on October 1, 2007, Lennar Chief Executive Officer Stuart Miller ordered that all spending related to the Property be stopped immediately, that general counsel scrutinize the Purchase Agreement and develop a strategy to delay closing, and that other managers continue to search for a partner to take the Bevard contracts off of Lennar’s corporate books. (DTX 589, at USH-00324625; DTX 614, Jacoby depo., at 57-62). Mr. Jacoby, who had been primarily responsible for managing the Bevard project up to that point, strongly disagreed with this decision, but was told by Mr. Miller, “essentially[,] ... T am the boss. I don’t care what your position is on this. Stop spending money.” (DTX 614, Jacoby depo., at 147).
Following that meeting, there was a shift in management on Purchaser’s side of the transaction from the local project managers at U.S. Home to Lennar’s corporate officers. Lennar Executive Vice President Richard Beckwitt had previously directed Lennar’s land divisions to “put together ... various reports” related to Lennar’s contracts, one of which was “a core and hit list report.” (T. 3/81/14, at 124). He explained that if a given project was designated as “core,” it meant that it did not “need any adjustment to it, the product [wa]s working, the ... contract ma[de] sense.” (Id.). Transactions on the “hit list,” on the other hand, were those that “needed some sort of review or adjustment^]” (Id.). Lennar’s Chief Operating Officer, Jon Jaffe, had a somewhat different understanding of the “hit list” designation:
Hit List were communities to identify that were cash-flow negative or not making any financial sense[;] didn’t make sense to Mothball,[] didn’t make sense to keep moving forward on the current plan that we were moving forward on to identify what alternative strategies there were. Do you sell the asset? Do you hold it? Can you stop development? What are the strategies and tactics to put that asset in a better position?
(DTX. 614, Jaffe depo., at 110-11). As of September 30, 2007, the Bevard contracts were on Lennar’s corporate “hit list,” with its strategy being to “[s]top all engineering and other consulting expenditures” and to “[r]e-review [the] contract for [an] escape clause[.]” (DTX 328; T. 3/31/14, at 184). Lennar retained “a team of high priced lawyers and consultants [to] work feverishly at ... making a case for delaying ... the Bevard closing.” (DTX 380). By October 15, 2007, Lennar’s general counsel, Mark Sustana, was specially assigned to the Bevard transaction to “analyz[e] the agreements” and another Lennar executive was charged with “looking at ways to off-load the deal.” (DTX 351; T. 3/31/14, at 187).
Seller perceived that something was amiss. In addition to observing that Purchaser’s development work on the Property had ground to a halt, Seller’s principals — namely, Mr. Sandler, Nathan Benson, and Daniel Colton — learned from Purchaser’s departing project manager that Lennar was seeking to get out of the contract. (T. 4/10/14, at ■ 55-57). When Mr. Sandler attempted to inquire further, Mr. Jacoby advised that he would “get back to [him], and that was the extent of it.” (Id. at 57). At around the same time, Seller began transmitting closing documents in advance of the scheduled December 5 settlement date (DTX 445, 452), but received no response from Purchaser (T. 4/3/14, at 60). Concerned about Purchaser’s non-responsiveness, Seller’s counsel, James Brennan, contacted transactional counsel for Purchaser, Matthew Wineman, to inquire as to whether “U.S. Home was going to look to get out of the contract and whether they were going to come to ... settlement[.]” (Id. at 49). Mr. Wineman “wouldn’t give [him] an answer one way or another and he said he couldn’t talk about it[.]” (Id.).
A clearer indication of Purchaser’s intention was communicated by a letter from Mr. Wineman dated November 21, 2007, in which he advised of Purchaser’s position that Seller had “failed to satisfy the conditions precedent to Settlement in accordance with the provisions of the [Purchase Agreement,] ... including but not limited to those conditions relating to certain off-site easements[.]” (JTX 63, at 1-2). “As a result,” Purchaser declared, “the Settlement Date is automatically extended as provided in the Agreement.” (Id. at 2). Seller insisted that all pre-closing conditions had been satisfied and demanded a full accounting of those that Purchaser believed were not. By a letter dated November 27, Purchaser identified four specific problems with off-site easements, but qualified that this “list of unsatisfied conditions precedent to Settlement [wa]s not exclusive, and d[id] not represent U.S. Home[’s] ... final review of all conditions precedent to Settlement.” (JTX 64, at 3). Moreover, Purchaser asserted, “[t]he burden to satisfy all of the conditions precedent to Settlement rests upon the Seller, and U.S. Home Corporation cannot and will not be put in a position to rely upon various verbal, unsubstantiated or inaccurate claims regarding the status of the conditions precedent to Settlement.” (Id. at 3-4).
Purchaser did not attend settlement on December 5, and continued to refuse contact with Seller’s principals. The following day, Mr. Jacoby stated in an email to Mr. Beekwitt:
I am inundated by calls from Nathan [Benson] wanting to know where we’re coming from and where we’re going. It is not easy (also not impossible) to stonewall a colleague of 10 years with only the suggestion that they meet the preclosing conditions and no answer to the question of what happens after that.
(DTX 401).
On December 6, 2007, Seller commenced an action in the United States District Court for the Eastern District of Virginia (“the initial action”), seeking a declaration as to what conditions precedent, if any, remained unsatisfied. (DTX 590). Notably, the complaint in the initial action did not allege that Purchaser had breached the Purchase Agreement or any duty arising thereunder; rather, Seller sought the court’s assistance in identifying any obstacles to closing so that it might address them and proceed to settlement.
On January 3, 2008, Purchaser, through litigation counsel, transmitted a letter to Seller requesting permission “to enter onto the property to perform investigations, studies and tests that [Purchaser] deem[s] necessary or appropriate.” (JTX 66, at iStar00019491). The letter set forth a laundry list of issues that Purchaser purportedly sought to investigate — the vast majority of which had previously been addressed by the parties — and cited as the basis of the request a contractual right to access under § 13(a) of the Purchase Agreement and a right to discovery under Fed.R.Civ.P. 34(a)(2). According to Mr. Beckwitt, the request for access was primarily motivated by Seller filing the initial action:
I have been in this business for 30 years, and this is the first time I have ever seen anything like that.... [W]e couldn’t understand it, especially given the fact that we had [been] through this dance earlier with regard to ... closing conditions back in ... early '07 through June, May of '07. It came as a big surprise to us. It raised all sorts of eyebrows.
(T. 3/31/14, at 130). Asked what Lennar expected that its investigation would find, he testified:
[W]e didn’t know what we’d find. We had just gotten sued, which was very unusual. We knew that we had a right under our contract to inspect the property and do testing. We didn’t know whether we were going to find anything. We had, up until that point, no reason to believe that there was anything wrong with the property[, but] ... the agreement gave us access. So we wanted to see what was going on.
(Id. at 132).
Due primarily to residual distrust stemming from the failed settlement on December 5, and believing that Purchaser’s request for access was simply pretext for further delay, Seller resolved to deny the request. Its counsel responded on January 4, 2008, addressing each point raised in Purchaser’s letter and suggesting that, upon receipt of “a complete statement of unsatisfied conditions precedent to settlement,” the parties would “be in a position to assess what discovery needs to be done in this case.” (DTX 417, at 2). When a second request for access was refused, U.S. Home sought relief in the initial action, serving Seller with a motion to compel an inspection of the Property “pursuant to Rule 34 of the Federal Rules 'of Civil Procedure and/or pursuant to the express terms of the parties’ contract.” (Civ. No. DKC 08-0267, ECF No. 31, at 2). On April 29, Seller “proposed a compromise ... that [the parties select] an independent and unaffiliated firm to conduct an agreed upon scope of environmental testing on selected portions of the Property,” but Purchaser declined. (DTX 565, at 2). A “core and hit list” report dated March 31, 2008, reflected that Purchaser’s strategy for Bevard as of that date was to “[terminate [the] contract and get [its] deposit back via legal action.” (DTX 443; T. 3/31/14, at 213).
Meanwhile, Seller continued to work toward closing by addressing certain issues that it believed would erase any doubt that all conditions precedent had been satisfied. As Mr. Colton testified, “we made an active decision to knock down every straw man stood up by Lennar as it related to conditions to closing.... [W]e felt we would go the extra yard or extra mile to answer every request or every statement we could get from Lennar about the conditions to closing.” (T. 4/10/14, at 9). In Seller’s view, any such issue had been resolved by April 28, 2008, when it called for settlement to occur on May 27. (DTX 445). Eleven days prior to that closing date, however — as Seller began forwarding closing documents and with the motion to compel inspection of the Property still pending — U.S. Home served a notice of default related to Seller’s refusal to permit access (ECF No. 649 ¶ 30), thereby triggering cure periods by Seller under the Purchase Agreement and by iStar under the Consent and Estoppel Agreement, the latter of which would expire in early July (JTX 41 § 15(b); DTX 259 ¶ 11). By letter dated May 23, 2008, U.S. Home advised Seller of its position that “all conditions precedent to Settlement [were], in fact, not satisfied, and as such, Settlement will not occur on May 27, 2008.” (ECF No. 649 ¶ 31).
On May 30, after U.S. Home failed to attend the scheduled settlement, Seller served a default notice of its own, asserting that Purchaser had “wrongfully failed to make [s]ettlement[.]” (DTX 458). On the same date, Seller’s counsel responded to U.S. Home’s notice of default, characterizing its prior requests for access as a discovery dispute that would be addressed by United States Magistrate Judge William Connelly in due course. Insofar as U.S. Home contended that it had a right to access under the Purchase Agreement, Seller argued that there could be no default because U.S. Home had failed to satisfy its own obligations:
Section 13(c) of the Agreement expressly requires that prior to any entry onto the Property, U.S. Home Corporation shall provide WPE and Settlers Crossing with certificates of insurance evidencing insurance coverage as required by that paragraph. [Seller’s] records indicate that U.S. Home Corporation has not provided this insurance coverage to WPE and Settlers Crossing. Accordingly, under the Agreement, U.S. Home Corporation is not entitled to enter the Property under any circumstances until it complies with Section 13. Obviously, Settlers Crossing and WPE cannot be in default of the Agreement for the alleged refusal of entry since U.S. Home Corporation has not complied with the Agreement.
(DTX 565, at 2).
On June 27, 2008, prior to expiration of iStar’s cure period under the Consent and Estoppel Agreement, Judge Connelly issued an order finding that “U.S. Home has a contractual right to inspect the property” pursuant to § 13(a) of the Purchase Agreement and Fed.R.Civ.P. 34(a)(2). (DTX 460 ¶ 8). The court permitted inspection “for a six week period as detailed in the March 25, 2008[,] Proposed Scope of Work and Schedule [submitted by Purchaser’s consultant] Environmental Resources Management, Inc.” {Id. at ¶ 10). From Purchaser’s perspective, this order came too soon. In an email to Lennar corporate officers dated June 25, 2008, Sam Sparks, a regional president, reported that he had “asked [Purchaser’s litigation counsel] to file a supplemental brief either Friday [June 27] or Monday [June 30], in the hope that filing will raise additional questions and push an order out past July 3, ... the date that Sandler and [iStar’s] right to cure expires[.]” (DTX 566). On June 30, counsel for iStar advised Purchaser that Seller would “comply with the June 27 Order,” adding1 that the order effectively resolved Purchaser’s notice of default because there was “nothing for [iStar] to cure.” (DTX 461, at 1-2).
Despite the fact that Purchaser had gained the right of access it purportedly sought, it never availed itself of that right. Instead, Purchaser elected to terminate the Purchase Agreement, as it had planned to do since shortly after the request for access was denied. (DTX 443; T. 3/31/14, at 213; DTX 566). By a letter dated July 3, 2008, Purchaser advised:
[0]n May 16, 2008, U.S. Home Corporation sent a Notice of Default to Seller for failing to give U.S. Home Corporation access to the Property that is the subject of the Agreement for the purpose of conducting certain investigations, studies, and tests as it deems necessary and appropriate. Pursuant to the Agreement, Seller’s cure period expired on June 2, 2008[,] [a]nd, pursuant to that certain Consent and Estoppel Agreement ... dated June 19, 200[7], [iStar’s] cure period expired on July 2, 2008. Neither Seller nor [iStar] has taken action to cure the default. Accordingly, pursuant to Section 15(b)(iii)(l) of the [Purchase Agreement], this letter shall serve as written notice of U.S. Home Corporation’s termination of the Agreement effective immediately.
.(JTX 73, at 2). When Seller and Mr. Sandler did not return the deposits upon demand, U.S. Home commenced the instant action on July 17, 2008.
In its initial complaint, U.S. Home alleged that Seller breached the Purchase Agreement when it refused the request for access to investigate the environmental condition of the Property, but Purchaser had not yet finally resolved why further investigation was warranted. The complaint recited that, in light of the prior sand and gravel mining operations on the Property, such investigation was necessary to shelter Purchaser from any future liability regarding “the release and threatened release of hazardous materials” under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (“CERCLA”), 42 U.S.C. § 9601 et seq. (ECF No. 1 ¶ 49). The express purpose of the Phase I ESAs conducted by Schnabel and ECC, however, was to satisfy these obligations, and Purchaser warranted, in both the Second Amendment and the Consent and Estoppel 'agreement, that, having made due inquiry, it was unaware of any environmental issue. Thus, even after requesting access and serving a notice of default when permission was denied, Purchaser was, in effect, searching for a firmer basis upon which to justify its request.
Purchaser’s post hoc strategy began to crystalize in mid-2008. In seeking to avoid the May 27 closing date, Purchaser “reached out to [local] earthwork contractors in hopes of locating someone who may have [firsthand] knowledge of the [historic sand and gravel mining] operations” on the Property. (DTX 568). One of those contractors advised that previous owners, before WPE, “had a contract with Maryland Environmental Services ... to haul treated sludge from the Blue Plains sewage treatment plant to the Bevard site.” (Id.). Although the parties’ environmental consultants had searched all relevant databases, conducted interviews, and made requests for information from appropriate agencies, they did not discover that sewage sludge (also known as “biosolids”) had been applied to the Property. Upon further investigation, Purchaser learned that this practice was extensive — from the mid-1970s to the late 1980s, thousands of tons of treated sewage sludge was transported from various regional wastewater treatment plants and applied to the Bevard Property.
After an internal report of the sludging operation was initially circulated among Purchaser’s corporate officers, Mr. Jacoby “couldn’t sleep ... thinking about whether or not [Purchaser] could have caught this earlier.” (DTX 570, at USEL02035516). The next day, he reported to Lennar’s managers that he had “reviewed all the environmental reports and discovered] ... [that] [t]he 2001 Schnabel Phase 1 ... contains a statement that [t]he fill material may have the potential to contain heavy metals, sludge, and varying debris” and that “[v]arious chemical tests may be required on the fill material to determine if contamination exists.” (Id. (internal marks omitted)). Mr. Jacoby further observed that although Schnabel’s geotechnical investigation did not find evidence of “debris, sludge, or heavy metals[,] .. [t]he report does not disclose whether or not the boring samples were tested or just observed” and “[t]here are no lab results appended to the report.” (Id.).
Despite Mr. Jacoby’s misgivings, Purchaser resolved to pursue a “toxic route” in court by late 2008 (DTX 561) — in other words, to rely on a theory that the land application of sewage sludge on the Property constituted a breach of Seller’s environmental representations and warranties. U.S. Home unveiled this new theory in a pre-discovery motion for summary judgment, filed on December 23, 2008:
The irrefutable fact ... is that, though never disclosed to U.S. Home, the Property was used for the disposal of sewage sludge for decades, during which period such sludge was spread over hundreds of acres of the Property, conclusively establishing that [the environmental] representation, warranty and condition precedent simply cannot be satisfied — ie., vast portions of the Property have “been used for the ... disposal of Hazardous Material,” as that term is expressly defined in the Agreement. Furthermore, the sewage sludge itself contains certain material that [is] individually “hazardous,” as well. Finally, ... given the immutable nature of the material dumped on the Property years ago, there is not and cannot be any genuine factual dispute that these individually hazardous materials remain on the Property even now.
(ECF No. 32-1, at 6-7).
Shortly after that motion was denied, U.S. Home was permitted to file an amended complaint — its operative pleading in the instant case — in which it added, inter alia, claims of fraud, based on Seller’s failure to disclose the sludging operation, and breach of environmental representations and warranties. (ECF No. 52). Armed with knowledge of the sludging operation, Purchaser renewed its discovery efforts to gain access to the Property in order to conduct extensive soil sampling and testing. Arrangements were made at a discovery hearing on May 4, 2010, after which Judge Connelly issued an order providing U.S. Home with a right to inspect the Property in June and July 2010. (ECF No. 114). Purchaser retained Environ International Corporation (“Environ”) to conduct sampling and testing, and the results of Environ’s investigation revealed the presence of what Purchaser believes are “Hazardous Materials,” as that term is defined in the Purchase Agreement.
Seller and iStar filed a joint counterclaim on June 30, 2009, seeking declaratory relief and specific performance of Purchaser’s obligations under the Purchase Agreement and Contract for Services. (ECF No. 66). iStar subsequently filed an amended counterclaim. (ECF No. 447). When the Bevard transaction did not close on the anticipated date, Seller defaulted on the iStar loan, which permitted iStar to exercise its rights under collateral assignments of the agreements. iStar later exercised those rights by initiating a foreclosure action in the Circuit' Court for Prince George’s County, Maryland. On November 17, 2009, the Bevard Property was sold to Piscataway Road — Clinton MD LLC (“Piscataway”), a limited liability company of which iStar is the sole member.
II. Findings of Fact and Conclusions of Law
Following the court’s ruling on post-discovery cross-motions for summary judgment (ECF Nos. 624, 625), two primary issues remained for trial: (1) whether, in light of the requirements of § 11(a) of the Purchase Agreement, Seller breached the environmental representations and warranties set forth in § 12.2(d), and (2) whether Seller breached § 13(a) of the Purchase Agreement by denying U.S. Home’s request for access. If the answer to either of these questions is in the affirmative, U.S. Home will prevail and is entitled to the return of its deposits pursuant to § 15(b). If both questions are answered in the negative, iStar wins and may be entitled — pending resolution of an issue regarding lapsed zoning on a portion of the Property — to specific performance of Purchaser’s obligations under the Purchase Agreement pursuant to §§ 15(a) and (d), as modified by the Second Amendment.
Both questions present claims for breach of contract under Maryland law. Under the objective theory of contract interpretation, which applies in Maryland, a court must “give effect to the plain meaning of an unambiguous term, and will evaluate a specific provision in light of the language of the entire contract.” Weichert Co. of Md., Inc. v. Faust, 419 Md. 306, 324, 19 A.3d 393 (2011). Contract terms must be construed according to their “customary, ordinary and accepted meaning,” regardless of the parties’ intentions at the time the contract was formed. Nova Research, Inc. v. Penske Truck Leasing Co., 405 Md. 435, 448, 952 A.2d 275 (2008). Therefore, when interpreting a contract, the court’s task is to “[determine from the language of the agreement itself what a reasonable person in the position of the parties would have meant at the time it was effectuated.” Calomiris v. Woods, 353 Md. 425, 436, 727 A.2d 358 (1999) (internal quotation marks omitted); see also Capital Select Realtors, LLC v. NRT Mid-Atl., LLC, 197 Md.App. 698, 711, 14 A.3d 1257 (2011) (“The [objective theory of contract interpretation] thus encourages parties to use language as precisely as possible, so as to forestall costly inquiries into their subjective intentions”).
A. Breach of Environmental Representations and Warranties
In Count VI of its amended complaint, U.S. Home alleges that Seller breached the environmental representations and warranties set forth in § 12.2(d) of the Purchase Agreement by failing to disclose that “a massive sewage sludge disposal operation had been conducted on the Property in the 1970s and 1980s,” and that, as a result, “the Property has been used for the disposal of Hazardous Materials and contains Hazardous Materials, as that term is defined in ... the Agreement.” (ECF No. 52 ¶ 143). In Count VII, it seeks a declaration that it was not obligated to proceed to settlement on May 27, 2008, because Seller had not satisfied a condition precedent to U.S. Home’s obligation to close — namely, § 11(a) of the Purchase Agreement, which provided that Seller’s representations and warranties had to be true and correct as of the date of settlement. (Id at ¶ 153). In Purchaser’s view, because the environmental representations and warranties contained in § 12.2(d) were not accurate, it was not required to settle on that date and its failure to do so did not constitute a default. (Id at 38).
In § 12.2(d), Settlers Crossing and WPE made the following representations and warranties concerning the environmental condition of the Property.
Prior to the date hereof, WPE has delivered to Purchaser a copy of its existing environmental report(s). To the best of WPE’s and Settlers Crossing’s knowledge, except as disclosed in the environmental report(s) delivered to Purchaser, (i) there are not “Hazardous Materials” (defined below) located on or within the Property; (ii) no portion of the Property has been used for the storage, use, gen- . eration, treatment or disposal of Hazardous Materials; and (iii) there are no underground fuel tanks located upon the Property. The term “Hazardous Materials” means (A) hazardous wastes, hazardous substances, and toxic materials prohibited or regulated by federal, state or local law, regulation, or order, (B) asbestos, (C) oil petroleum products and their byproducts, and (D) polychlorinat-ed [biphenyls] (“PCBs”).
(JTX 41 § 12.2.d).
While the accuracy of Seller’s representations and warranties under § 12.2(d) is expressly based on its knowledge another provision of the Purchase Agreement, § 11(a), purported to make it a condition precedent to Purchaser’s obligation to settle that all representations and warranties ■ be “actually] correet[ ] as of the time of [s]ettlement[.]” (Id at § 11(a)). On summary judgment, however, the court found that the “actual correctness” of Seller’s representations and warranties was not a true condition precedent:
The final sentence of § 11(a) — ie., that “the condition precedent to Purchaser’s obligation to settle ... shall depend upon the actual correctness as of the time of Settlement of the facts stated in all such representations and warranties” — does not mean, as Purchaser argues, that Purchaser’s obligation to settle was contingent on Seller showing the actual truth of all representations at settlement. Indeed, such an interpretation would lead to an absurd result, as it would be practically impossible for Sell-. er to make a showing that, for example, the entire 1,200-acre property was free of all “hazardous materials.” Furthermore, it would vest Purchaser with virtually unbridled discretion to withhold performance. Purchaser at least tacitly acknowledges in its reply papers that virtually all property in Maryland contains at least some degree of what might be deemed “hazardous materials”, and the purchase agreement itself contemplates, in § 10(f), that Purchaser might, in its pre-closing development work, encounter such materials in amounts insufficient to constitute a breach of warranty. If Seller were to be required to demonstrate at settlement that there were, in fact, no “hazardous materials” on the property as a condition precedent, the presence of even de minimus amounts of such materials would permit Purchaser to avoid closing. A reasonable person in the parties’ position at the time they entered into the purchase agreement would not have understood it to mean this....
Such a rigid interpretation would also give rise to a conflict in the terms of the agreement insofar as Seller’s representation at settlement concerning the environmental condition of the property could be made “[t]o the best of [its] knowledge,” under § 12.2(d), while its satisfaction of the condition precedent to Purchaser’s obligation to settle would depend on its ability to show the “actual correctness” of the same representation under § 11(a).... What the last sentence of § 11(a) does, in effect, is create a right of Purchaser to test the accuracy of Seller’s representations and warranties. In other words, Seller was required to represent that, to the best of its knowledge, other than what was disclosed in the environmental reports it had provided to Purchaser, the property contained no “hazardous materials,” but Purchaser was entitled to verify the truth of that representation prior to being obligated to close.
(ECF No. 624, at 67-68 (internal citations omitted)). Because the condition set forth in § 11(a) related to Seller’s representations and warranties, the court determined that satisfaction “must be assessed in terms of whether there was a material breach” and “[a]ny breach could only be material if the environmental condition of the property in some way would have affected Purchaser’s intended use for the land — ie., the construction of a residential community.” (Id. at 82).
In light of that interpretation of §§ 11(a) and 12.2(d), the burden at trial fell on Purchaser to prove that Seller’s environmental representations and warranties were not true in fact. Therefore, it was incumbent upon- U.S. Home to demonstrate, by a preponderance of the evidence: (1) that there are “Hazardous Materials” on the Property, as that term is defined in the Purchase Agreement; (2) that the source of those “Hazardous Materials” was something other than what was disclosed in the environmental reports provided by Seller; and (3) that those “Hazardous Materials” are present in amounts such that remediation of the Property is required.
At trial, Purchaser’s theory was that elevated concentrations of “heavy metals” found on the Property — namely, arsenic, aluminum, iron, and vanadium — constituted “Hazardous Materials”; that the elevated concentration of those elements could only have resulted from the land application of sewage sludge, which was not disclosed in Seller’s environmental reports; and that extensive remediation would be required in order to construct the planned residential community. To meet its burden, Purchaser relied principally upon the testimony of two expert witnesses: Robin Richards, the environmental expert from Environ who designed and implemented the sampling and analysis plan for the Property; and Karl Kalbacher, who authored a 2001 document setting forth soil and groundwater cleanup standards for the Maryland Department of the Environment (“MDE”).
Ms. Richards testified that Environ was retained by Purchaser in March 2010 “to test the accuracy of the environmental representations and warranties provided in Section 12.2(d) of the [Purchase Agreement].” (T. 4/1/14, at 94). To accomplish that goal, she initially developed a “sampling and analysis plan” for the Property. (Id. at 67). Ms. Richards had developed and implemented “hundreds” of sampling and analysis plans over the course of her career, many of which focused on “getting the operating permits for the land farming of industrial sludges; in particular, refinery sludges.” (Id. at 67-68). She explained that “land farming” is “a term of art” referring the process of “takfing] sludge, [] applying] it to the top of the land, spreading] it out over the top of the land, com[ing] back and disking] it into a level of about anywhere from three to nine inches, and then [ ] managing] the soil to maximize the ability of the natural soil bacteria ... to degrade the organic material in these sludges[.]” (Id. at 68). Ms. Richards developed sampling and analysis plans in accordance with regulations and guidance issued by the United States Environmental Protection Agency (“EPA”), which required “characterizing the land farm site as well as characterizing the land farm operations, including the sl[u]dge characteristics^]” (Id. at 69). Asked what “characterizing the land farm site” entailed, she testified:
[W]e had two scenarios. One was where we had land farm operations that were brand new. A site had not already been designated for a land farm. And a second scenario is when we had a land farm operation that had been occurring but we were now putting it into the operating process.
Even though we had two different sites, the guidance that EPA provided on how to characterize those sites was similar. What they wanted us to be able to do was to look at the impact of sludg-ing on that area; hence, we needed to characterize or conduct sampling analysis of the soils that would represent a background condition, so soils similar to our land farm site, but in an upgraded, undisturbed area where we could go in and define what would be the background levels for a whole plethora of constituents, including metals and some organics.
At the land farm site itself, we conducted a similar sampling analysis plan, but because we were needing to do a statistical comparison between the land farm conditions to the background conditions, the [EPA] provided specific guidance how we ought to do that so we generate a database that can be statistically analyzed.
It’s called a ... random sampling method. So we basically lay out a grid, looks a bit like a bingo card, over the site and at the background area, so each grid has a number. And then we use a random number generator off of a program and we say, Hey, we need ten samples at our land farm site, ten samples for our background, give me ten numbers. And we sample the grid that the Random Number Generator ends up identifying.
(Id. at 69-71).
Not all of the sampling and analysis plans Ms. Richards developed involved an assessment of “background” conditions. She explained:
We had another program ... [applicable where] you needed to make sure that you were operating your land farm appropriately. So we are no longer trying to determine whether our land farm was having the impact on the environment through the detection monitoring program, which is what I described earlier.
We were now looking just internal to the land farm itself, and saying, how well are we treating the sludges and are any releases from the sludges occurring in an unexpected or-unsatisfactory manner, so that we could go in and change operations of the land farm.
So that program was a very focused, targeted program where we were looking specifically at the areas or the cells that we had sludged to then go in and say, What are we seeing? ...
So it was a very targeted program. We weren’t comparing to background. We were looking at, once again, the fate of chemicals that we put on the land farm to make sure the land farm was doing what it was supposed to do, which was degrade and immobilize samples.
(Id., at 72-73). She developed similar “focused, targeted, [and] biased” plans in circumstances in which she was investigating “a suspected source of contamination,” such as when she “knew either from interviews or ... from historical documents where a spill or a release had occurred, and we were trying to ... find the hot spot and then be able to sample from that hot spot to determine how far the plume went out so that we could then figure out what needed to be done for assessing the risk and how to remediate.” (Id. at 73).
The sampling and analysis plan that Ms. Richards designed for Bevard primarily involved “takfing] soil samples in locations where [she] had strong indication that sludge had been applied ... and analyzing] them for chemicals that [she] believed were indicative of the presence of sludge.” (Id. at 94). She acknowledged that this was a “biased” sampling plan and that she was “just trying to find the ... evidence of sludge and the release of hazardous substances from the sludge.” (T. 4/2/14, at 66). In other words, none of the samples that Environ tested were “from undisturbed, unsludged areas.” (T. 4/1/14, at 200). In determining where to test, Ms. Richards relied primarily on historical sludge permitting documents — based on an assumption that, if the land application of sludge was permitted in an area, it was likely applied there — and interpretation of aerial photography and mapping provided by Aero-Data, a private consulting firm retained by Purchaser.
Ms. Richards said that she tested for “hazardous substances that [she] felt were indicative of the presence of sludge.” (Id. at 95). She opined that “PCBs lie., poly-chlorinated biphenyls] ... were going to be one of [her] best indicators of whether sludges had been applied to this land and whether there had been a release of hazardous substances from those sludges”:
The reason being is that PCBs, during this time period from 1974 to 1983, were ... still being allowed to be in use, and what I mean by “in use,” is that around 1979, there was a ban on using PCBs. So the only presence of PCBs in equipment was through being grandfathered in. And the significance of that is PCBs [are] found in transformers, hydraulic fluids, oil-based paints during this time period, caulking, and those sources of PCBs get into domestic wastewater through industrial sources, commercial sources, as [ ] well as just storm water runoff that’s treated by the POTWs lie., publicly owned treatment works].
When PCBs come into a POTW, they don’t really like water. They like binding to particles, whether those particles are soil and sediment or whether it’s the bacteria themselves. As the wastewater is treated through the wastewater treatment plant, the PCBs will settle or precipitate down into the sludge, whether [in the] primary treatment or in the secondary treatment, and these are the sludges that are then managed by the [wastewater treatment plants] ... and were sent off to the Bevard Properties for land disposal.
The nice thing about'PCBs, for the work we were undertaking, is that because of their persistence, they tend to stay where they are 'placed. They do not volatilize[;] they are not biodegraded. There is not a way the soil chemistry changes to make them mobilize down into the groundwater. They basically stayed put.
So they were going to be a very good indicator or signature of sludge disposal at the Bevard Properties.
(Id. at 100-01).
She also believed that aluminum and iron were “signatures for sludge”:
[0]nce again, between 1974 and 1984, '85, Blue Plains [Wastewater Treatment Plant], [which] was the major contributor of sludge to the Bevard Properties, and later on Piscataway [Wastewater Treatment Plant], were both being challenged to generate cleaner effluent to, in the case of Blue Plains, to the Potomac River. And in doing so, one of the major focuses was to try to reduce the nutrient loading, in particular, phosphorus.
During this time period, one of the techniques to reduce phosphorus ... in a wastewater treatment plant was to add iron salts, iron chloride, or to add alum. Blue Plains, during this time period, added one or the other. Alum is aluminum salt.
The way the chemistry works is that the iron binds with phosphorus, which makes phosphorus insoluble, and it precipitates out into the sludge so you get an ... iron/phosphate precipitating into the sludge.
Similarly, with aluminum, the aluminum reacts with the phosphorus precipitating out as aluminum phosphate into the sludge, both insoluble, both end up adding aluminum iron to the sludge.
(Id. at 102).
Ms. Richards tested for other elements — such as vanadium and arsenic— simply because they are “hazardous substances” that “were found at elevated levels in the primary soil investigations throughout the area ... as well as at depth.” (Id. at 95). She “was not expecting” to find elevated arsenic levels on the Property, but historical data she subsequently received “for the sludges from Blue Plains and Piscataway, [as well as] Western Branch and Parkway [ie., two other regional wastewater treatment plants that contributed sludge to the Be-vard Property], ... [showed] that arsenic was present in the sludges.” (Id. at 96).
Ms. Richards summarized Enviroris findings as follows:
There were 33 soil borings that I took as part of ... what we called the “primary investigation.” The results from those 33 soil borings showed wide-spread and elevated